Section (84-1-2)RS-5,WS-6. Let by Illinois DOT on February 27, 2026, Sangamon, District 06. 1 bid received; low bid $25,964,194 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 102
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $25,964,194 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Traffic counter- tirtl system (X0320089) | EACH | 1 | $43,613 |
| 2 | Maintenance mowing (X2503000) | ACRE | 90 | $110.00 |
| 3 | BR appr pavt conn SPL (X4201410) | SY | 72 | $1,459.25 |
| 4 | PCC surf rem var DP (X4400100) | SY | 270 | $40.51 |
| 5 | HMA surf rem var DP (X4401198) | SY | 5,262 | $9.37 |
| 6 | Clean underdr outlet (X6010100) | EACH | 229 | $372.23 |
| 7 | Rem EX underdrains (X6013702) | LF | 4,650 | $13.66 |
| 8 | Guardrail remov SPL (X6320100) | LF | 287.50 | $16.50 |
| 9 | Delineator removal (X6350120) | EACH | 153 | $5.50 |
| 10 | Rem repl imp atten SM (X6431220) | EACH | 17 | $1,343.43 |
| 11 | Outlet marker (X6670201) | EACH | 242 | $55.00 |
| 12 | TC-prot 701402 SPL (X7010208) | EACH | 2 | $112,784 |
| 13 | Rem EX TR signal post (X8950301) | EACH | 1 | $3,432.00 |
| 14 | Construction layout (Z0013798) | LS | 1 | $109,193 |
| 15 | Trainees (Z0076600) | HR | 5,000 | $0.80 |
| 16 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 |
| 17 | Earth excavation (20200100) | CY | 360 | $106.81 |
| 18 | Furnished excavation (20400800) | CY | 20 | $123.31 |
| 19 | Grading & shap ditch (21400100) | LF | 3,891 | $24.78 |
| 20 | Seeding CL 2 (25000200) | ACRE | 1 | $3,602.50 |
| 21 | Nitrogen fert nutr (25000400) | LB | 64 | $5.50 |
| 22 | Phosphorus fert nutr (25000500) | LB | 64 | $5.50 |
| 23 | Potassium fert nutr (25000600) | LB | 64 | $5.50 |
| 24 | Agr ground limestone (25000700) | TON | 1 | $110.00 |
| 25 | Mulch method 2 (25100115) | ACRE | 1 | $3,602.50 |
| 26 | Stab subbase HMA 4 (31200500) | SY | 9,001 | $53.28 |
| 27 | HMA base cse 11 3/4 (35501331) | SY | 7,183 | $129.07 |
| 28 | Bit matls tack CT (40600290) | LB | 239,857 | $1.05 |
| 29 | Long joint sealant (40600370) | LF | 105,607 | $2.86 |
| 30 | Matl transfer device (40600405) | TON | 47,702 | $5.64 |
| 31 | PCC surf rem butt JT (40600985) | SY | 2,967 | $11.03 |
| 32 | Temporary ramp (40600990) | SY | 258 | $14.42 |
| 33 | P HMA BC IL19.0 N90 (40603240) | TON | 28,521 | $179.17 |
| 34 | P SC SMA 9.5 E N80 (40605024) | TON | 19,181 | $226.22 |
| 35 | PCC PVT 11 jointed (42000521) | SY | 658 | $185.55 |
| 36 | Cont reinf PCC PVT 9 (42100200) | SY | 7,380 | $171.59 |
| 37 | Pavt reinforcement (42100615) | SY | 7,380 | $39.09 |
| 38 | Pavement rem (44000100) | SY | 8,074 | $51.30 |
| 39 | HMA surf rem 1/2 (44000151) | SY | 8,629 | $3.79 |
| 40 | HMA surf rem 1 1/2 (44000155) | SY | 290,301 | $5.46 |
| 41 | HMA surf rem 1 3/4 (44000156) | SY | 13,653 | $6.16 |
| 42 | HMA surf rem 2 1/2 (44000159) | SY | 15,803 | $8.26 |
| 43 | Paved SHLD removal (44004250) | SY | 10,381 | $44.21 |
| 44 | CL A patch T2 13 (44200610) | SY | 128 | $567.60 |
| 45 | CL A patch T3 13 (44200612) | SY | 17 | $562.10 |
| 46 | CL B patch T2 10.5 (44200972) | SY | 21 | $482.90 |
| 47 | CL B patch T3 10.5 (44200975) | SY | 53 | $477.40 |
| 48 | Dowel bars 1 1/2 (44201299) | EACH | 112 | $35.20 |
| 49 | Patch reinforcement (44213000) | SY | 146 | $88.00 |
| 50 | Saw cuts (44213200) | LF | 1,206 | $13.20 |
| 51 | Tie bars 3/4 (44213204) | EACH | 8 | $27.50 |
| 52 | Agg wedge SHLD type B (48102100) | TON | 4,988 | $65.00 |
| 53 | HMA shoulders 8 (48203029) | SY | 4,805 | $86.62 |
| 54 | HMA shoulders (48203100) | TON | 25,406 | $163.83 |
| 55 | PCC shoulders 8 (48300300) | SY | 411 | $153.05 |
| 56 | PCC shoulders 11 (48300600) | SY | 444 | $206.95 |
| 57 | Conc headwall removal (50104400) | EACH | 2 | $2,036.82 |
| 58 | Pipe culvert remov (50105220) | LF | 383 | $47.80 |
| 59 | P cul CL A 2 36 (542A1081) | LF | 24 | $349.40 |
| 60 | PRC flar end sec 36 (54213681) | EACH | 2 | $3,903.35 |
| 61 | Conc HDWL for P drain (60100060) | EACH | 13 | $825.00 |
| 62 | Pipe underdrain 4 SP (60108100) | LF | 416 | $22.57 |
| 63 | Pipe underdr T 1 4 (60108104) | LF | 4,650 | $24.21 |
| 64 | SPBGR TY A 6FT posts (63000001) | LF | 112.50 | $51.70 |
| 65 | Traf bar term T2 (63100045) | EACH | 1 | $3,465.00 |
| 66 | TR bar TRM T1 SPL tan (63100167) | EACH | 1 | $6,132.50 |
| 67 | Delineators (63500105) | EACH | 342 | $55.00 |
| 68 | Shoulder rum strip 16 (64200116) | LF | 103,639 | $0.37 |
| 69 | Engr field office A (67000400) | CAL MO | 12 | $4,876.08 |
| 70 | Mobilization (67100100) | LS | 1 | $1,549,248 |
| 71 | Traf cont-prot 701411 (70100420) | EACH | 14 | $4,273.25 |
| 72 | Traf cont-prot 701401 (70100800) | LS | 1 | $299,555 |
| 73 | Traf cont-prot 701446 (70100815) | LS | 1 | $37,950 |
| 74 | Traf cont-prot 701451 (70100820) | LS | 1 | $23,141 |
| 75 | Traf cont-prot 701456 (70100825) | LS | 1 | $28,325 |
| 76 | Changeable message SN (70107025) | CAL DAY | 280 | $37.95 |
| 77 | Night work zone light (70200100) | LS | 1 | $402,662 |
| 78 | Short term pavt mking (70300100) | LF | 25,390 | $2.83 |
| 79 | SHRT TRM pavt MK rem (70300150) | SF | 4,592 | $6.41 |
| 80 | Temp conc barrier (70400100) | LF | 4,950 | $35.75 |
| 81 | Rel temp conc barrier (70400200) | LF | 925 | $7.70 |
| 82 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $5,060.00 |
| 83 | Imp attn rel FRN TL3 (70600332) | EACH | 2 | $2,200.00 |
| 84 | Terminal marker - DA (72501000) | EACH | 1 | $46.20 |
| 85 | Pref PL PM TD STD LTR/sym (78004600) | SF | 250 | $39.05 |
| 86 | Pref PL PM TD STD L 6 (78004630) | LF | 26,741 | $6.88 |
| 87 | Pref PL PM TD STD L 8 (78004640) | LF | 6,534 | $9.63 |
| 88 | Pref PL PM TD STD L12 (78004660) | LF | 880 | $14.30 |
| 89 | Pref PL PM TD STD L24 (78004720) | LF | 29 | $27.50 |
| 90 | Mod ureth PM line 6 (78009006) | LF | 118,706 | $0.73 |
| 91 | GRV RCSD PM LTR & sym (78011000) | SF | 250 | $11.55 |
| 92 | GRV RCSD PVT MRKG 7 (78011035) | LF | 145,177 | $0.55 |
| 93 | GRV RCSD PVT MRKG 9 (78011045) | LF | 6,534 | $1.10 |
| 94 | GRV RCSD PVT MRKG 13 (78011065) | LF | 880 | $11.00 |
| 95 | GRV RCSD PVT MRKG 25 (78011125) | LF | 29 | $11.00 |
| 96 | Raised refl pavt MKR (78100100) | EACH | 2,726 | $46.03 |
| 97 | Grdrail ref type A (78200005) | EACH | 3 | $13.20 |
| 98 | Barr wall ref type C (78200011) | EACH | 398 | $21.20 |
| 99 | Curb reflectors (78200020) | EACH | 30 | $5.50 |
| 100 | Raised ref PVT MK rem (78300200) | EACH | 2,726 | $18.67 |
| 101 | PVT MKG rem grinding (78300201) | SF | 3,623 | $4.40 |
| 102 | TS post galvs 12 (87502460) | EACH | 2 | $7,497.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.