IDOT contract 61M32 bid tabulation
Harwood Heights, section 22-00069-00-RS. Let by Illinois DOT on February 27, 2026, Cook, District 01. 6 bids received; low bid $839,740 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $839,740 | Low |
| 2 | Schroeder Asphalt Services, Inc. | $853,313 | +2.0% |
| 3 | Builders Paving, LLC | $867,008 | +3.0% |
| 4 | K-Five Construction Corporation | $878,843 | +5.0% |
| 5 | Plote Construction, Inc. | $889,802 | +6.0% |
| 6 | Bigane Paving Company | $941,472 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Schroeder Asphalt Services, Inc. | 3. Builders Paving, LLC | 4. K-Five Construction Corporation | 5. Plote Construction, Inc. | 6. Bigane Paving Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Loc undergr utility (XX005431) | EACH | 10 | $500.00 | $300.00 | $500.00 | $950.00 | $500.00 | $1,000.00 |
| 2 | Rec ref PVT markr rem (XX007092) | EACH | 70 | $20.00 | $20.00 | $25.00 | $36.60 | $34.04 | $5.00 |
| 3 | FL beacon P MTD SP in (X0325714) | EACH | 2 | $9,000.00 | $10,000 | $9,000.00 | $3,500.00 | $9,000.00 | $9,000.00 |
| 4 | HMA driveway pavt 3 (X4060280) | SY | 20 | $108.00 | $60.00 | $63.00 | $55.00 | $172.00 | $100.00 |
| 5 | PC conc sidewalk 5 SP (X4240430) | SF | 6,445 | $8.75 | $10.80 | $11.00 | $10.00 | $11.00 | $10.00 |
| 6 | Inlets SPL (X6024240) | EACH | 1 | $2,200.00 | $2,500.00 | $2,200.00 | $2,200.00 | $2,200.00 | $2,000.00 |
| 7 | Temp info signing (X7200061) | SF | 52 | $25.00 | $22.00 | $15.00 | $24.00 | $15.00 | $15.00 |
| 8 | RCSD refl pavt marker (X7810300) | EACH | 70 | $70.00 | $85.00 | $70.00 | $50.00 | $75.00 | $65.00 |
| 9 | Det loop repl (X8860105) | LF | 750 | $29.62 | $34.00 | $29.62 | $30.00 | $29.62 | $30.00 |
| 10 | Construction layout (Z0013798) | LS | 1 | $5,000.00 | $13,000 | $5,500.00 | $38,500 | $10,000 | $3,500.00 |
| 11 | Drainage STR adj SPL (Z0018100) | EACH | 14 | $1,150.00 | $1,300.00 | $1,150.00 | $1,150.00 | $1,150.00 | $1,300.00 |
| 12 | Paint curb (Z0036200) | LF | 800 | $2.25 | $4.00 | $2.25 | $3.50 | $3.75 | $2.50 |
| 13 | Rem EX sign post (Z0051398) | EACH | 46 | $150.00 | $120.00 | $28.00 | $110.00 | $28.00 | $105.00 |
| 14 | Tree trunk protection (20101100) | EACH | 12 | $150.00 | $200.00 | $100.00 | $175.00 | $175.00 | $175.00 |
| 15 | Tree root pruning (20101200) | EACH | 12 | $175.00 | $73.00 | $105.00 | $65.00 | $65.00 | $65.00 |
| 16 | Tree prun 1-10 (20101300) | EACH | 10 | $29.00 | $80.00 | $50.00 | $70.00 | $75.00 | $70.00 |
| 17 | Tree prun over 10 (20101350) | EACH | 2 | $300.00 | $80.00 | $100.00 | $67.85 | $67.85 | $68.00 |
| 18 | Earth excavation (20200100) | CY | 50 | $130.00 | $80.00 | $110.00 | $50.00 | $100.00 | $85.00 |
| 19 | Trench backfill (20800150) | CY | 105 | $65.00 | $30.00 | $65.00 | $65.00 | $65.00 | $160.00 |
| 20 | Topsoil F & P 4 (21101615) | SY | 640 | $7.00 | $5.00 | $3.00 | $4.60 | $8.00 | $5.00 |
| 21 | Sodding salt tolerant (25200110) | SY | 640 | $11.50 | $22.00 | $20.00 | $19.95 | $10.00 | $20.00 |
| 22 | Supple watering (25200200) | UNIT | 35 | $1.00 | $30.00 | $0.01 | $25.00 | $50.00 | $25.00 |
| 23 | Inlet filters (28000510) | EACH | 19 | $15.00 | $199.00 | $150.00 | $150.00 | $150.00 | $250.00 |
| 24 | Agg base cse B 2 (35101582) | SY | 150 | $6.95 | $14.00 | $10.00 | $3.60 | $16.00 | $18.00 |
| 25 | Agg base cse B 6 (35101800) | SY | 20 | $23.25 | $18.00 | $45.00 | $25.00 | $77.00 | $100.00 |
| 26 | Bit matls tack CT (40600290) | LB | 8,617 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 |
| 27 | Mix CR JTS flangewys (40600400) | TON | 1.40 | $1,435.00 | $1,000.00 | $2,000.00 | $500.00 | $2,200.00 | $1,000.00 |
| 28 | HMA surf rem butt JT (40600982) | SY | 250 | $9.25 | $15.00 | $30.00 | $0.01 | $36.00 | $35.00 |
| 29 | P HMA BC IL-4.75 N50 (40603200) | TON | 553 | $125.00 | $113.00 | $115.00 | $125.00 | $145.00 | $140.00 |
| 30 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,126 | $96.50 | $91.00 | $100.00 | $100.00 | $105.00 | $118.00 |
| 31 | PCC driveway pavt 7 (42300300) | SY | 150 | $110.00 | $125.00 | $95.00 | $80.00 | $95.00 | $85.00 |
| 32 | Detectable warnings (42400800) | SF | 455 | $30.00 | $44.00 | $50.00 | $25.00 | $28.40 | $45.00 |
| 33 | HMA surf rem 2 (44000157) | SY | 12,765 | $3.15 | $2.35 | $5.00 | $6.95 | $5.50 | $5.40 |
| 34 | Drive pavement rem (44000200) | SY | 170 | $21.00 | $12.00 | $25.00 | $20.00 | $55.00 | $25.00 |
| 35 | Comb curb gutter rem (44000500) | LF | 1,380 | $7.25 | $9.00 | $13.00 | $10.00 | $8.00 | $6.00 |
| 36 | Sidewalk rem (44000600) | SF | 6,445 | $1.15 | $2.25 | $3.00 | $1.20 | $2.00 | $2.00 |
| 37 | CL D patch T1 8 (44201737) | SY | 135 | $40.00 | $85.00 | $70.00 | $31.50 | $80.00 | $70.00 |
| 38 | CL D patch T2 8 (44201741) | SY | 950 | $40.00 | $84.00 | $70.00 | $31.50 | $75.00 | $70.00 |
| 39 | CL D patch T3 8 (44201745) | SY | 135 | $40.00 | $83.00 | $70.00 | $31.50 | $65.00 | $70.00 |
| 40 | CL D patch T4 8 (44201747) | SY | 135 | $40.00 | $83.00 | $70.00 | $31.50 | $65.00 | $70.00 |
| 41 | Crack routing (pavt) (45100100) | LF | 5,000 | $0.50 | $0.65 | $0.56 | $0.56 | $0.56 | $0.60 |
| 42 | Crack filling (45100200) | LB | 850 | $12.45 | $14.50 | $7.63 | $7.63 | $7.63 | $8.00 |
| 43 | SS RG CL A 1 12 (550A2320) | LF | 209 | $65.00 | $109.00 | $65.00 | $65.00 | $65.00 | $250.00 |
| 44 | Storm sewer rem 12 (55100500) | LF | 209 | $35.00 | $14.50 | $35.00 | $35.00 | $35.00 | $50.00 |
| 45 | CB TC T1F OL (60206905) | EACH | 1 | $2,900.00 | $3,805.00 | $2,900.00 | $2,900.00 | $2,900.00 | $3,000.00 |
| 46 | FR & lids adjust (60300305) | EACH | 25 | $450.00 | $723.00 | $450.00 | $450.00 | $450.00 | $550.00 |
| 47 | FR & grates T3 (60404300) | EACH | 5 | $800.00 | $650.00 | $800.00 | $800.00 | $800.00 | $600.00 |
| 48 | FR & lids T1 OL (60406000) | EACH | 5 | $450.00 | $473.00 | $450.00 | $450.00 | $450.00 | $500.00 |
| 49 | FR & lids T1 CL (60406100) | EACH | 5 | $450.00 | $502.00 | $450.00 | $450.00 | $450.00 | $750.00 |
| 50 | Comb CC&G TB6.12 (60603800) | LF | 1,380 | $50.00 | $43.00 | $49.50 | $45.00 | $50.00 | $36.00 |
| 51 | Mobilization (67100100) | LS | 1 | $50,000 | $10,000 | $62,659 | $52,000 | $53,600 | $55,100 |
| 52 | TR cont & prot 701501 (70102620) | LS | 1 | $103,000 | $22,000 | $100.00 | $49,800 | $1.00 | $1,800.00 |
| 53 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $1.00 | $100.00 | $100.00 | $1.00 | $1,800.00 |
| 54 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $1.00 | $100.00 | $100.00 | $1.00 | $1,800.00 |
| 55 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1.00 | $100.00 | $100.00 | $1.00 | $1,800.00 |
| 56 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 | $100.00 | $100.00 | $1.00 | $1,800.00 |
| 57 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $100.00 | $100.00 | $1.00 | $1,800.00 |
| 58 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $5,500.00 | $10,000 | $20,275 | $20,000 | $1,800.00 |
| 59 | Short term pavt mking (70300100) | LF | 3,250 | $0.01 | $2.50 | $1.00 | $1.00 | $2.49 | $1.00 |
| 60 | SHRT TRM pavt MK rem (70300150) | SF | 1,125 | $0.01 | $3.50 | $2.85 | $2.00 | $0.01 | $2.00 |
| 61 | Temp PVT MK LTR & sym paint (70300211) | SF | 294 | $0.01 | $1.80 | $1.00 | $3.00 | $1.00 | $1.75 |
| 62 | Temp PVT MK line 4 - paint (70300221) | LF | 1,000 | $0.01 | $0.53 | $0.27 | $1.15 | $0.27 | $0.20 |
| 63 | Temp PVT MK line 6 - paint (70300241) | LF | 1,200 | $0.01 | $0.75 | $0.38 | $1.25 | $0.38 | $0.40 |
| 64 | Temp PVT MK line 12 - paint (70300261) | LF | 2,400 | $0.01 | $1.48 | $0.75 | $1.00 | $0.75 | $0.50 |
| 65 | Temp PVT MK line 24 - paint (70300281) | LF | 1,700 | $0.01 | $1.78 | $1.25 | $1.00 | $1.25 | $1.00 |
| 66 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,250 | $0.01 | $3.00 | $1.35 | $1.25 | $0.01 | $1.20 |
| 67 | Sign panel T1 (72000100) | SF | 375 | $20.00 | $44.00 | $36.00 | $24.00 | $36.00 | $30.00 |
| 68 | Remov sin pan assy TA (72400100) | EACH | 105 | $100.00 | $112.00 | $25.00 | $85.00 | $25.00 | $105.00 |
| 69 | Teles STL sin support (72800100) | LF | 250 | $20.00 | $23.00 | $13.50 | $18.00 | $13.50 | $18.00 |
| 70 | Metal post TY A (72900100) | LF | 560 | $25.00 | $20.00 | $9.50 | $15.00 | $9.50 | $18.00 |
| 71 | THPL PVT MK LTR & sym (78000100) | SF | 294 | $6.00 | $6.30 | $6.00 | $5.75 | $5.70 | $6.00 |
| 72 | THPL PVT MK line 4 (78000200) | LF | 5,026 | $0.90 | $0.90 | $0.90 | $1.00 | $0.82 | $0.65 |
| 73 | THPL PVT MK line 6 (78000400) | LF | 605 | $1.50 | $1.55 | $1.50 | $1.25 | $1.35 | $1.00 |
| 74 | THPL PVT MK line 12 (78000600) | LF | 3,785 | $3.00 | $3.10 | $3.00 | $2.95 | $2.75 | $3.00 |
| 75 | THPL PVT MK line 24 (78000650) | LF | 420 | $6.00 | $6.40 | $6.00 | $5.75 | $5.70 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.