IDOT contract 78520 bid tabulation
Section (41-8,1,2)RS-5;1B-1. Let by Illinois DOT on July 31, 2026, Jefferson, District 09. 2 bids received; low bid $9,952,613 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 184
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $9,952,613 | Low |
| 2 | Samron Midwest Contracting, Inc. | $10,360,275 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Mowing (X2503100) | UNIT | 916 | $20.04 | $15.00 |
| 2 | STR refl CR CTRL TRTMT (X4430200) | LF | 45,677 | $0.91 | $1.50 |
| 3 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $50,547 | $35,000 |
| 4 | Detour signing (X7200203) | LS | 1 | $19,093 | $45,000 |
| 5 | Appr slab repair (PD) (Z0001800) | SY | 8.70 | $1,094.47 | $1,250.00 |
| 6 | Conc BR deck scar 3/8 (Z0012102) | SY | 511 | $41.53 | $27.00 |
| 7 | BR DK TH poly ovl 3/8 (Z0012193) | SY | 511 | $171.04 | $165.00 |
| 8 | Construction layout (Z0013798) | LS | 1 | $113,831 | $50,000 |
| 9 | Silicone JT sealer SP (Z0021920) | LF | 64 | $96.10 | $45.00 |
| 10 | TS batt backup system (Z0033068) | EACH | 3 | $0.01 | $3,500.00 |
| 11 | Polymer concrete (Z0041895) | CF | 13.30 | $1,244.29 | $770.00 |
| 12 | RR prot liability ins (Z0048665) | LS | 1 | $33,653 | $34,000 |
| 13 | Rock fill - foundatn (Z0054517) | TON | 523 | $54.55 | $49.00 |
| 14 | Trainees (Z0076600) | HR | 3,500 | $0.80 | $0.80 |
| 15 | Trainees TPG (Z0076604) | HR | 3,500 | $15.00 | $15.00 |
| 16 | Tree remov 6-15 (20100110) | UNIT | 48 | $91.49 | $450.00 |
| 17 | Tree remov acres (20100500) | ACRE | 0.27 | $45,081 | $65,000 |
| 18 | Earth excavation (20200100) | CY | 34,552 | $21.46 | $35.00 |
| 19 | Earth exc wid (20200500) | CY | 225 | $16.39 | $27.00 |
| 20 | Borrow excavation (20400100) | CY | 6,937 | $25.80 | $19.00 |
| 21 | Porous gran embank (20700220) | CY | 1,029 | $69.27 | $68.00 |
| 22 | Porous gran backfill (20900110) | CY | 1,732 | $127.81 | $51.00 |
| 23 | Geotech fab F/GR stab (21001000) | SY | 231 | $7.97 | $10.00 |
| 24 | Seeding CL 2 (25000200) | ACRE | 12.10 | $2,062.50 | $2,000.00 |
| 25 | Seeding CL 3A (25000305) | ACRE | 12.30 | $3,465.00 | $3,500.00 |
| 26 | Seeding CL 7 (25000350) | ACRE | 24.40 | $599.50 | $600.00 |
| 27 | Nitrogen fert nutr (25000400) | LB | 4,386 | $1.87 | $2.00 |
| 28 | Phosphorus fert nutr (25000500) | LB | 2,195 | $1.87 | $2.00 |
| 29 | Potassium fert nutr (25000600) | LB | 2,195 | $1.87 | $2.00 |
| 30 | Agr ground limestone (25000700) | TON | 48.90 | $390.50 | $390.00 |
| 31 | Mulch method 2 (25100115) | ACRE | 24.50 | $1,677.50 | $1,685.00 |
| 32 | Erosion contr blanket (25100630) | SY | 8,585 | $2.26 | $2.50 |
| 33 | Temp eros contr seed (28000250) | LB | 7,308 | $3.90 | $3.00 |
| 34 | Temp ditch checks (28000305) | LF | 257 | $23.49 | $25.00 |
| 35 | Perimeter eros bar (28000400) | LF | 23,787 | $3.34 | $3.00 |
| 36 | Inlet & pipe protect (28000500) | EACH | 32 | $160.80 | $210.00 |
| 37 | Stone riprap CL A4 (28100107) | SY | 156 | $81.86 | $94.00 |
| 38 | Stone dump rip CL A4 (28100707) | SY | 1,075 | $65.87 | $65.00 |
| 39 | Filter fabric (28200200) | SY | 1,922 | $8.66 | $5.00 |
| 40 | Aggregate ditch (28300400) | TON | 1,003 | $68.71 | $75.00 |
| 41 | Agg base cse A (35100100) | TON | 862 | $64.56 | $53.00 |
| 42 | PCC base cse W 10 (35400500) | SY | 391 | $12.16 | $145.00 |
| 43 | Agg surf cse A (40200100) | TON | 366 | $94.93 | $81.00 |
| 44 | Aggregate-temp access (40201000) | TON | 50 | $96.06 | $53.00 |
| 45 | Bit matls PR CT (40600275) | LB | 9 | $0.01 | $0.01 |
| 46 | Bit matls tack CT (40600290) | LB | 56,297 | $0.01 | $0.01 |
| 47 | Long joint sealant (40600370) | LF | 22,839 | $3.06 | $3.40 |
| 48 | Matl transfer device (40600405) | TON | 10,972 | $3.67 | $2.70 |
| 49 | HMA surf rem butt JT (40600982) | SY | 98 | $31.36 | $15.00 |
| 50 | Temporary ramp (40600990) | SY | 153 | $76.24 | $35.00 |
| 51 | HMA BC IL-9.5FG N70 (40602970) | TON | 6,243 | $109.66 | $124.00 |
| 52 | HMA SC IL-9.5FG C N70 (40604002) | TON | 34 | $570.71 | $800.00 |
| 53 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,729 | $111.87 | $115.00 |
| 54 | Incidental HMA surf (40800050) | TON | 349 | $214.31 | $200.00 |
| 55 | Welded wire reinf (42000060) | SY | 176 | $8.33 | $15.00 |
| 56 | PCC PVT 10 (42000500) | SY | 176 | $163.75 | $195.00 |
| 57 | Pavement rem (44000100) | SY | 1,272 | $25.06 | $35.00 |
| 58 | HMA surf rem 1 3/4 (44000156) | SY | 620 | $6.20 | $35.00 |
| 59 | HMA surf rem 2 (44000157) | SY | 53,485 | $1.85 | $2.15 |
| 60 | HMA surf rem 3 (44000161) | SY | 2,363 | $2.01 | $4.05 |
| 61 | Drive pavement rem (44000200) | SY | 33 | $82.32 | $35.00 |
| 62 | Paved SHLD removal (44004250) | SY | 66 | $31.79 | $20.00 |
| 63 | Welded wire reinf (44200050) | SY | 224 | $8.29 | $17.00 |
| 64 | CL C patch T1 12 (44201373) | SY | 4 | $300.00 | $145.00 |
| 65 | CL C patch T2 12 (44201377) | SY | 919 | $274.00 | $225.00 |
| 66 | CL C patch T3 12 (44201381) | SY | 777 | $270.00 | $250.00 |
| 67 | CL C patch T4 12 (44201383) | SY | 808 | $268.00 | $235.00 |
| 68 | Tie bars 3/4 (44213204) | EACH | 158 | $13.39 | $24.00 |
| 69 | Aggregate SHLDS A 8 (48100700) | SY | 234 | $104.12 | $65.00 |
| 70 | HMA shoulders 8 (48203029) | SY | 38,851 | $44.21 | $54.00 |
| 71 | HMA shoulders 10 (48203037) | SY | 655 | $108.81 | $150.00 |
| 72 | HMA shoulders (48203100) | TON | 16 | $162.38 | $120.00 |
| 73 | PCC shoulders 10 (48300500) | SY | 184 | $161.84 | $110.00 |
| 74 | Rem exist struct N1 (50100300) | EACH | 1 | $8,563.83 | $5,000.00 |
| 75 | Rem exist struct N2 (50100400) | EACH | 1 | $4,493.61 | $2,500.00 |
| 76 | Rem exist struct N3 (50100500) | EACH | 1 | $4,981.50 | $2,500.00 |
| 77 | Rem exist struct N4 (50100600) | EACH | 1 | $4,981.50 | $2,500.00 |
| 78 | Rem exist struct N5 (50100700) | EACH | 1 | $5,610.81 | $2,500.00 |
| 79 | Rem exist struct N6 (50100800) | EACH | 1 | $6,490.26 | $2,500.00 |
| 80 | Rem exist struct N7 (50100900) | EACH | 1 | $5,604.76 | $2,500.00 |
| 81 | Rem exist struct N8 (50101000) | EACH | 1 | $5,610.81 | $2,500.00 |
| 82 | Rem exist struct N9 (50101100) | EACH | 1 | $5,610.81 | $2,500.00 |
| 83 | Rem exist struct N10 (50101200) | EACH | 1 | $4,395.21 | $2,500.00 |
| 84 | Rem exist struct N11 (50101300) | EACH | 1 | $6,490.26 | $2,500.00 |
| 85 | Rem exist struct N12 (50101400) | EACH | 1 | $4,395.21 | $2,500.00 |
| 86 | Rem exist struct N13 (50101410) | EACH | 1 | $5,610.81 | $2,500.00 |
| 87 | Rem exist struct N14 (50101415) | EACH | 1 | $4,395.21 | $2,500.00 |
| 88 | Rem exist struct N15 (50101420) | EACH | 1 | $6,077.22 | $2,500.00 |
| 89 | Rem exist struct N16 (50101421) | EACH | 1 | $5,610.81 | $2,500.00 |
| 90 | Rem exist struct N17 (50101422) | EACH | 1 | $4,296.80 | $2,500.00 |
| 91 | Rem exist struct N18 (50101423) | EACH | 1 | $5,079.91 | $2,500.00 |
| 92 | Rem exist struct N19 (50101424) | EACH | 1 | $4,395.21 | $2,500.00 |
| 93 | Rem exist struct N20 (50101425) | EACH | 1 | $4,395.21 | $2,500.00 |
| 94 | Rem exist struct N21 (50101426) | EACH | 1 | $99,160 | $30,000 |
| 95 | Conc rem (50102400) | CY | 0.30 | $26,061 | $5,700.00 |
| 96 | Pipe culvert remov (50105220) | LF | 889 | $25.90 | $15.00 |
| 97 | Rem/disp uns matl-STR (50200450) | CY | 249 | $47.58 | $35.00 |
| 98 | F & E struct steel (50500405) | LB | 2,760 | $6.43 | $7.00 |
| 99 | Reinf bars, epoxy CTD (50800205) | LB | 40,020 | $2.16 | $2.00 |
| 100 | Bar splicers (50800515) | EACH | 180 | $36.70 | $37.00 |
| 101 | Name plates (51500100) | EACH | 1 | $990.00 | $1,400.00 |
| 102 | Temp soil reten systm (52200020) | SF | 448 | $273.94 | $375.00 |
| 103 | Deck slab rep (part) (53016000) | SY | 2.10 | $2,339.79 | $1,800.00 |
| 104 | Conc box cul (54003000) | CY | 249.50 | $1,497.04 | $1,100.00 |
| 105 | P cul CL A 1 18 (542A0223) | LF | 48 | $145.21 | $110.00 |
| 106 | P cul CL A 1 24 (542A0229) | LF | 59 | $185.05 | $135.00 |
| 107 | P cul CL A 1 30 (542A0235) | LF | 55 | $195.43 | $170.00 |
| 108 | P cul CL A 1 42 (542A0247) | LF | 195 | $226.98 | $250.00 |
| 109 | P cul CL A 2 30 (542A1075) | LF | 174 | $169.11 | $175.00 |
| 110 | P cul CL A 2 36 (542A1081) | LF | 88 | $189.49 | $170.00 |
| 111 | P cul CL A 2 42 (542A1087) | LF | 274 | $228.21 | $227.00 |
| 112 | P cul CL A 2 48 (542A1093) | LF | 87 | $262.01 | $396.00 |
| 113 | P cul CL A 1 eqrs 18 (542A5473) | LF | 77 | $152.08 | $120.00 |
| 114 | P cul CL A 1 eqrs 30 (542A5485) | LF | 174 | $251.41 | $230.00 |
| 115 | P cul CL A 1 eqrs 36 (542A5491) | LF | 51 | $365.73 | $337.00 |
| 116 | P cul CL A 1 eqrs 60 (542A5515) | LF | 63 | $664.97 | $1,170.00 |
| 117 | P cul CL A 2 eqrs 48 (542A8233) | LF | 78 | $474.67 | $650.00 |
| 118 | P cul CL A 2 eqrs 72 (542A8257) | LF | 88 | $808.75 | $1,200.00 |
| 119 | P cul CL D 1 15 (542D0220) | LF | 537 | $137.14 | $55.00 |
| 120 | P cul CL D 1 18 (542D0223) | LF | 95 | $83.61 | $70.00 |
| 121 | End sections 15 (54213450) | EACH | 38 | $1,153.43 | $780.00 |
| 122 | End sections 18 (54213453) | EACH | 8 | $1,390.36 | $850.00 |
| 123 | PRC flar end sec 18 (54213663) | EACH | 2 | $2,069.94 | $2,275.00 |
| 124 | PRC flar end sec 24 (54213669) | EACH | 2 | $2,378.72 | $2,760.00 |
| 125 | PRC FL end S EQ RS 18 (54214503) | EACH | 4 | $2,315.64 | $2,100.00 |
| 126 | TRVRS pipe GRT con ES (54260315) | LF | 616 | $180.36 | $325.00 |
| 127 | Conc ES 542001 42 1:3 (54261342) | EACH | 2 | $8,657.72 | $7,050.00 |
| 128 | Conc ES 542001 30 1:4 (54261430) | EACH | 6 | $6,667.83 | $9,500.00 |
| 129 | Conc ES 542001 36 1:4 (54261436) | EACH | 2 | $8,586.22 | $11,000 |
| 130 | Conc ES 542001 42 1:4 (54261442) | EACH | 12 | $9,591.09 | $13,050 |
| 131 | Conc ES 542001 48 1:4 (54261448) | EACH | 2 | $11,285 | $15,200 |
| 132 | Conc ES 542011 72 1:3 (54263372) | EACH | 2 | $15,688 | $22,400 |
| 133 | Conc ES 542011 30 1:4 (54263430) | EACH | 6 | $6,241.58 | $8,500.00 |
| 134 | Conc ES 542011 36 1:4 (54263436) | EACH | 2 | $7,660.58 | $11,000 |
| 135 | Conc ES 542011 48 1:4 (54263448) | EACH | 2 | $10,637 | $15,000 |
| 136 | Conc ES 542011 60 1:4 (54263460) | EACH | 2 | $13,550 | $20,200 |
| 137 | Waterprf membrane sys (58100200) | SY | 476 | $106.88 | $67.00 |
| 138 | Class SI conc outlet (60600095) | CY | 12.40 | $602.22 | $2,075.00 |
| 139 | Concrete gutter TY A (60602500) | LF | 836 | $104.39 | $50.00 |
| 140 | SPBGR TY A 6FT posts (63000001) | LF | 275 | $71.47 | $53.00 |
| 141 | SPGR att to culvert (63000030) | LF | 66 | $394.17 | $128.00 |
| 142 | Traf bar term T6 (63100085) | EACH | 8 | $6,572.41 | $6,000.00 |
| 143 | TR bar TRM T1 SPL tan (63100167) | EACH | 12 | $5,274.36 | $4,500.00 |
| 144 | Guardrail remov (63200310) | LF | 1,692 | $9.53 | $16.00 |
| 145 | Shoulder rum strip 8 (64200108) | LF | 48,284 | $0.24 | $0.25 |
| 146 | Sinusoidal rum STP 14 (64200214) | LF | 22,833 | $0.57 | $0.30 |
| 147 | Fur erect row markers (66600105) | EACH | 131 | $368.89 | $300.00 |
| 148 | Perm surv MKRS T2 (66700305) | EACH | 12 | $283.35 | $625.00 |
| 149 | Non SPL waste disposl (66900200) | CY | 79 | $128.04 | $80.00 |
| 150 | Soil disposal analy (66900530) | EACH | 3 | $1,320.00 | $1,500.00 |
| 151 | Reg sub P-const plan (66901001) | LS | 1 | $3,300.00 | $3,000.00 |
| 152 | Reg sub F con report (66901003) | LS | 1 | $1,100.00 | $3,500.00 |
| 153 | Reg sub mon (66901006) | CAL DAY | 5 | $1,089.00 | $2,500.00 |
| 154 | Engr field office A (67000400) | CAL MO | 25 | $2,200.00 | $1,800.00 |
| 155 | Mobilization (67100100) | LS | 1 | $581,162 | $595,000 |
| 156 | Traf cont-prot 701316 (70100100) | EACH | 2 | $10,033 | $20,000 |
| 157 | Traf cont-prot 701321 (70100405) | EACH | 1 | $16,524 | $25,000 |
| 158 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $10,000 |
| 159 | Traf cont-prot 701306 (70100460) | LS | 1 | $115,511 | $0.01 |
| 160 | Traf cont-prot 701326 (70100500) | LS | 1 | $149,238 | $0.01 |
| 161 | Traf cont-prot 701336 (70100600) | LS | 1 | $40,960 | $0.01 |
| 162 | TR cont surveillance (70103815) | CAL DAY | 4 | $800.00 | $0.01 |
| 163 | Temp BR traf signals (70106500) | EACH | 3 | $17,324 | $18,000 |
| 164 | Temp rumble strips (70106700) | EACH | 18 | $1,358.05 | $1,200.00 |
| 165 | Pavt MK blkout tape 5 (70107005) | LF | 1,098 | $6.46 | $3.30 |
| 166 | Changeable message SN (70107025) | CAL DAY | 110 | $100.00 | $75.00 |
| 167 | Short term pavt mking (70300100) | LF | 7,894 | $4.49 | $2.00 |
| 168 | SHRT TRM pavt MK rem (70300150) | SF | 3,096 | $0.01 | $1.50 |
| 169 | Temp PVT MK LTR & sym paint (70300211) | SF | 61.20 | $4.40 | $0.01 |
| 170 | Temp PVT MK line 4 - paint (70300221) | LF | 61,933 | $0.14 | $0.01 |
| 171 | Temp PVT MK line 24 - paint (70300281) | LF | 10 | $4.40 | $0.01 |
| 172 | Temp conc barrier (70400100) | LF | 375 | $37.48 | $50.00 |
| 173 | Pin temp conc barrier (70400125) | EACH | 60 | $23.04 | $15.00 |
| 174 | Rel temp conc barrier (70400200) | LF | 300 | $8.16 | $6.00 |
| 175 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $5,004.46 | $5,000.00 |
| 176 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $1,223.89 | $750.00 |
| 177 | Terminal marker - DA (72501000) | EACH | 12 | $56.31 | $47.00 |
| 178 | PT PVT MK LTRS & symb (78001100) | SF | 61.20 | $5.50 | $23.00 |
| 179 | Paint PVT MK line 4 (78001110) | LF | 61,933 | $0.15 | $0.20 |
| 180 | Paint PVT MK line 24 (78001180) | LF | 10 | $5.50 | $68.80 |
| 181 | Raised refl pavt MKR (78100100) | EACH | 292 | $70.30 | $54.00 |
| 182 | Grdrail ref type B (78200006) | EACH | 48 | $56.31 | $14.00 |
| 183 | Raised ref PVT MK rem (78300200) | EACH | 292 | $11.45 | $16.00 |
| 184 | PVT MKG rem grinding (78300201) | SF | 21,570 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.