IDOT contract 78935 bid tabulation
Section 113B-2. Let by Illinois DOT on July 31, 2026, Jefferson, District 09. 2 bids received; low bid $1,269,718 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 72
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $1,269,718 | Low |
| 2 | Samron Midwest Contracting, Inc. | $1,321,450 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | HMA surf rem var DP (X4401198) | SY | 164 | $53.27 | $55.00 |
| 2 | Memb WTRPRF sys B STR (X5810103) | SY | 152 | $48.06 | $32.00 |
| 3 | Width restrict sign (X7200201) | LS | 1 | $6,292.34 | $4,000.00 |
| 4 | Construction layout (Z0013798) | LS | 1 | $28,907 | $20,000 |
| 5 | TS batt backup system (Z0033068) | EACH | 1 | $3,520.00 | $3,700.00 |
| 6 | Rock fill - foundatn (Z0054517) | TON | 294 | $65.65 | $55.00 |
| 7 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 8 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 9 | Earth excavation (20200100) | CY | 650 | $45.59 | $45.00 |
| 10 | Channel excavation (20300100) | CY | 245 | $41.56 | $45.00 |
| 11 | Porous gran embank (20700220) | CY | 248 | $84.04 | $85.00 |
| 12 | Seeding CL 2 (25000200) | ACRE | 0.34 | $9,102.50 | $10,000 |
| 13 | Seeding CL 7 (25000350) | ACRE | 0.34 | $1,237.50 | $4,700.00 |
| 14 | Nitrogen fert nutr (25000400) | LB | 61 | $1.87 | $2.00 |
| 15 | Phosphorus fert nutr (25000500) | LB | 31 | $1.87 | $2.00 |
| 16 | Potassium fert nutr (25000600) | LB | 31 | $1.87 | $2.00 |
| 17 | Agr ground limestone (25000700) | TON | 0.70 | $390.50 | $500.00 |
| 18 | Mulch method 2 (25100115) | ACRE | 0.34 | $6,325.00 | $3,300.00 |
| 19 | Erosion contr blanket (25100630) | SY | 1,604 | $2.15 | $1.25 |
| 20 | Temp eros contr seed (28000250) | LB | 67 | $6.64 | $4.00 |
| 21 | Temp ditch checks (28000305) | LF | 331 | $24.69 | $10.00 |
| 22 | Stone riprap CL A4 (28100107) | SY | 205 | $80.09 | $75.00 |
| 23 | Filter fabric (28200200) | SY | 205 | $5.22 | $3.00 |
| 24 | Sub gran mat A (31100100) | TON | 111 | $75.35 | $60.00 |
| 25 | Agg surf cse A 6 (40200500) | SY | 12 | $44.82 | $12.00 |
| 26 | Bit matls tack CT (40600290) | LB | 689 | $0.01 | $0.01 |
| 27 | Long joint sealant (40600370) | LF | 110 | $23.31 | $90.00 |
| 28 | HMA BC IL-9.5 N70 (40602985) | TON | 36 | $444.08 | $565.00 |
| 29 | HMA SC IL-9.5 C N70 (40604052) | TON | 25 | $586.73 | $1,100.00 |
| 30 | PCC PVT 10 (42000500) | SY | 184 | $186.63 | $185.00 |
| 31 | Protective coat (42001300) | SY | 322 | $1.88 | $1.50 |
| 32 | Pavement rem (44000100) | SY | 184 | $39.14 | $75.00 |
| 33 | Paved SHLD removal (44004250) | SY | 176 | $31.31 | $75.00 |
| 34 | Welded wire reinf (44200050) | SY | 184 | $16.93 | $14.00 |
| 35 | HMA shoulders 10 (48203037) | SY | 750 | $108.67 | $195.00 |
| 36 | PCC shoulders 10 (48300500) | SY | 113 | $171.42 | $100.00 |
| 37 | Rem exist struct (50100100) | EACH | 1 | $67,796 | $32,000 |
| 38 | Structure excavation (50200100) | CY | 95 | $43.03 | $50.00 |
| 39 | Rem/disp uns matl-STR (50200450) | CY | 168 | $48.66 | $45.00 |
| 40 | Protective coat (50300300) | SY | 18 | $2.07 | $1.50 |
| 41 | Reinf bars, epoxy CTD (50800205) | LB | 40,560 | $1.86 | $1.75 |
| 42 | Bar splicers (50800515) | EACH | 172 | $49.11 | $50.00 |
| 43 | Steel railing TY CO-10 (50900207) | LF | 66 | $404.69 | $400.00 |
| 44 | Name plates (51500100) | EACH | 1 | $1,405.17 | $850.00 |
| 45 | Temp soil reten systm (52200020) | SF | 517 | $217.03 | $320.00 |
| 46 | Conc box cul (54003000) | CY | 208.60 | $1,388.09 | $1,275.00 |
| 47 | Geocomposite wall DR (59100100) | SY | 152 | $18.77 | $20.00 |
| 48 | SPBGR TY A 6FT posts (63000001) | LF | 87.50 | $54.45 | $60.00 |
| 49 | Traf bar term T14 (63100119) | EACH | 4 | $7,007.00 | $6,750.00 |
| 50 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $5,060.00 | $4,900.00 |
| 51 | Guardrail remov (63200310) | LF | 360 | $9.77 | $5.00 |
| 52 | Engr field office A (67000400) | CAL MO | 2 | $3,500.00 | $2,600.00 |
| 53 | Mobilization (67100100) | LS | 1 | $115,224 | $118,900 |
| 54 | Traf cont-prot 701321 (70100405) | EACH | 1 | $22,944 | $24,000 |
| 55 | Traf cont-prot 701201 (70100450) | LS | 1 | $13,536 | $0.01 |
| 56 | Traf cont-prot 701326 (70100500) | LS | 1 | $5,076.13 | $0.01 |
| 57 | Temp BR traf signals (70106500) | EACH | 1 | $37,070 | $38,000 |
| 58 | Temp rumble strips (70106700) | EACH | 6 | $1,333.99 | $1,500.00 |
| 59 | Changeable message SN (70107025) | CAL DAY | 28 | $70.95 | $125.00 |
| 60 | Short term pavt mking (70300100) | LF | 841 | $0.01 | $0.01 |
| 61 | SHRT TRM pavt MK rem (70300150) | SF | 235 | $0.01 | $0.01 |
| 62 | Temp PVT MK line 4 - paint (70300221) | LF | 841 | $0.01 | $0.01 |
| 63 | Temp conc barrier (70400100) | LF | 487.50 | $26.10 | $40.00 |
| 64 | Pin temp conc barrier (70400125) | EACH | 33 | $33.52 | $40.00 |
| 65 | Rel temp conc barrier (70400200) | LF | 387.50 | $10.14 | $5.00 |
| 66 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $3,092.19 | $5,600.00 |
| 67 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $931.05 | $500.00 |
| 68 | Terminal marker - DA (72501000) | EACH | 4 | $55.00 | $50.00 |
| 69 | Paint PVT MK line 4 (78001110) | LF | 841 | $4.64 | $5.00 |
| 70 | Grdrail ref type A (78200005) | EACH | 16 | $11.00 | $14.00 |
| 71 | Barr wall ref type C (78200011) | EACH | 8 | $11.01 | $30.00 |
| 72 | PVT MKG rem grinding (78300201) | SF | 561 | $5.86 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.