IDOT contract 76V11 bid tabulation
Section DIST. Let by Illinois DOT on July 31, 2026, Madison, District 08. 3 bids received; low bid $951,953 by Kinney Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 23
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kinney Contractors, Inc. | $951,953 | Low |
| 2 | Keeley & Sons, Inc. | $999,552 | +5.0% |
| 3 | G. M. Sipes Construction, Inc. | $1,011,532 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kinney Contractors, Inc. | 2. Keeley & Sons, Inc. | 3. G. M. Sipes Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 2 | Welded wire reinf (44200050) | SY | 1,244 | $20.00 | $21.85 | $25.00 |
| 3 | CL B patch T2 11 (44200982) | SY | 266 | $245.00 | $257.80 | $325.00 |
| 4 | CL B patch T3 11 (44200986) | SY | 368 | $240.00 | $257.80 | $300.00 |
| 5 | CL B patch T4 11 (44200988) | SY | 735 | $235.00 | $257.80 | $275.00 |
| 6 | CL B patch T2 15 (44201031) | SY | 224 | $330.00 | $285.80 | $350.00 |
| 7 | CL B patch T3 15 (44201035) | SY | 179 | $320.00 | $285.80 | $325.00 |
| 8 | CL B patch T4 15 (44201037) | SY | 735 | $310.00 | $285.80 | $300.00 |
| 9 | Dowel bars 1 1/2 (44201299) | EACH | 2,174 | $30.00 | $27.68 | $30.00 |
| 10 | Saw cuts (44213200) | LF | 7,372 | $4.00 | $7.35 | $4.95 |
| 11 | Tie bars 3/4 (44213204) | EACH | 287 | $25.00 | $47.25 | $25.00 |
| 12 | Engr field office A (67000400) | CAL MO | 6 | $5,000.00 | $3,890.00 | $1,500.00 |
| 13 | Mobilization (67100100) | LS | 1 | $20,000 | $57,890 | $60,000 |
| 14 | Traf cont-prot 701201 (70100450) | LS | 1 | $30,000 | $100.00 | $10,000 |
| 15 | Traf cont-prot 701336 (70100600) | LS | 1 | $2,500.00 | $57,315 | $10,000 |
| 16 | TR cont & prot 701501 (70102620) | LS | 1 | $3,500.00 | $1,365.00 | $5,000.00 |
| 17 | Changeable message SN (70107025) | CAL DAY | 196 | $65.00 | $29.15 | $0.01 |
| 18 | Short term pavt mking (70300100) | LF | 955 | $5.00 | $0.01 | $0.01 |
| 19 | SHRT TRM pavt MK rem (70300150) | SF | 318 | $15.00 | $0.01 | $0.01 |
| 20 | PT PVT MK LTRS & symb (78001100) | SF | 78 | $5.00 | $30.60 | $35.00 |
| 21 | Paint PVT MK line 6 (78001130) | LF | 3,500 | $2.00 | $1.18 | $1.50 |
| 22 | Raised refl pavt MKR (78100100) | EACH | 50 | $325.00 | $107.10 | $120.00 |
| 23 | Raised ref PVT MK rem (78300200) | EACH | 50 | $10.00 | $23.45 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.