IDOT contract 76V05 bid tabulation

Section DIST. Let by Illinois DOT on April 24, 2026, Randolph, District 08. 3 bids received; low bid $1,969,789 by G. M. Sipes Construction, Inc..

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
19
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1G. M. Sipes Construction, Inc.$1,969,789Low
2Kinney Contractors, Inc.$2,218,233+13%
3E. T. Simonds Construction Company$2,284,028+16%
IDOT contract 76V05: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. G. M. Sipes Construction, Inc.2. Kinney Contractors, Inc.3. E. T. Simonds Construction Company
1Tri geogrid reinf T1 (X0327487)SY5,783$10.00$6.00$7.08
2CL B patch T2 12 SPL (X4421017)SY841$205.00$240.00$244.36
3CL B patch T3 12 SPL (X4421019)SY1,100$200.00$237.00$240.00
4CL B patch T4 12 SPL (X4421021)SY4,139$180.00$231.00$235.00
5Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
6Earth excavation (20200100)CY1,032$0.01$35.00$47.34
7Geotech fab F/GR stab (21001000)SY5,783$5.00$3.00$6.05
8Sub gran mat B 6 (31101400)SY5,783$50.00$25.00$22.45
9Welded wire reinf (44200050)SY5,783$30.00$12.00$14.57
10Dowel bars 1 1/2 (44201299)EACH3,400$35.00$24.00$8.96
11Saw cuts (44213200)LF15,706$0.01$6.00$6.41
12Tie bars 3/4 (44213204)EACH1,033$10.00$16.00$35.96
13Engr field office A (67000400)CAL MO6$1,500.00$3,300.00$2,200.00
14Mobilization (67100100)LS1$118,000$72,000$197,768
15Traf cont-prot 701201 (70100450)LS1$0.01$160,000$0.01
16Traf cont-prot 701336 (70100600)LS1$0.01$1.00$100,377
17TR cont & prot 701501 (70102620)LS1$4,000.00$1.00$0.01
18Temp PVT MK line 4 - paint (70300221)LF8,700$0.01$2.20$0.01
19Paint PVT MK line 4 (78001110)LF8,700$0.85$2.20$0.95
IDOT contract 76V05: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy