IDOT contract 76U70 bid tabulation
Section (48,49,50,51-1,52-1,53,54,55,62)PP-1. Let by Illinois DOT on April 24, 2026, Greene, District 08. 3 bids received; low bid $1,293,514 by Keeley & Sons, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 13
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keeley & Sons, Inc. | $1,293,514 | Low |
| 2 | G. M. Sipes Construction, Inc. | $1,294,223 | 0.0% |
| 3 | Kinney Contractors, Inc. | $1,301,685 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keeley & Sons, Inc. | 2. G. M. Sipes Construction, Inc. | 3. Kinney Contractors, Inc. |
|---|---|---|---|---|---|---|
| 1 | CL C patch T2 13 SPL (X4421389) | SY | 277 | $269.85 | $350.00 | $285.00 |
| 2 | CL C patch T3 13 SPL (X4421394) | SY | 216 | $269.85 | $350.00 | $280.00 |
| 3 | CL C patch T4 13 SPL (X4421396) | SY | 3,416 | $269.85 | $300.00 | $270.00 |
| 4 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 5 | Tie bars 3/4 (44213204) | EACH | 3,514 | $16.45 | $0.01 | $19.00 |
| 6 | Mobilization (67100100) | LS | 1 | $76,315 | $77,000 | $30,000 |
| 7 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $1,000.00 | $5,000.00 |
| 8 | Traf cont-prot 701336 (70100600) | LS | 1 | $37,890 | $1,000.00 | $5,000.00 |
| 9 | TR cont & prot 701501 (70102620) | LS | 1 | $31,855 | $3,000.00 | $50,000 |
| 10 | Changeable message SN (70107025) | CAL DAY | 756 | $21.15 | $0.01 | $65.00 |
| 11 | Temp PVT MK line 4 - paint (70300221) | LF | 3,641 | $0.02 | $0.01 | $2.02 |
| 12 | Paint PVT MK line 4 (78001110) | LF | 3,641 | $2.04 | $2.00 | $2.10 |
| 13 | PVT MKG rem WTR blast (78300202) | SF | 1,214 | $3.06 | $0.01 | $9.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.