IDOT contract 61K90 bid tabulation
Aurora, section 24-00368-00-RS. Let by Illinois DOT on January 17, 2025, Dupage, District 01. 4 bids received; low bid $1,102,489 by Geneva Construction Company.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 41
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Geneva Construction Company | $1,102,489 | Low |
| 2 | K-Five Construction Corporation | $1,133,311 | +3.0% |
| 3 | Builders Paving, LLC | $1,147,808 | +4.0% |
| 4 | R. W. Dunteman Company | $1,427,350 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Geneva Construction Company | 2. K-Five Construction Corporation | 3. Builders Paving, LLC | 4. R. W. Dunteman Company |
|---|---|---|---|---|---|---|---|
| 1 | CC&G RMVL repl < = 10 (X4400501) | LF | 200 | $80.00 | $65.00 | $72.00 | $114.10 |
| 2 | CC&G RMVL repl > 10FT (X4400503) | LF | 496 | $80.00 | $55.00 | $72.00 | $101.05 |
| 3 | Sanitary manhole adj (X6026050) | EACH | 1 | $1,950.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 4 | FR & lids adjust SPL (X6030310) | EACH | 93 | $675.00 | $1,050.00 | $1,050.00 | $1,050.00 |
| 5 | Det loop repl (X8860105) | LF | 1,600 | $15.92 | $15.92 | $15.92 | $15.92 |
| 6 | Temp info signing (Z0030850) | SF | 77 | $15.00 | $12.50 | $15.00 | $15.00 |
| 7 | Topsoil F & P 4 (21101615) | SY | 200 | $0.10 | $9.55 | $9.55 | $9.55 |
| 8 | Sodding salt tolerant (25200110) | SY | 200 | $38.15 | $35.50 | $35.50 | $35.50 |
| 9 | Supple watering (25200200) | UNIT | 10.80 | $1.00 | $0.01 | $0.01 | $0.01 |
| 10 | Sub gran mat B (31101000) | TON | 122 | $12.00 | $45.00 | $10.00 | $47.75 |
| 11 | Bit matls tack CT (40600290) | LB | 24,079 | $0.01 | $0.01 | $0.01 | $0.01 |
| 12 | Long joint sealant (40600370) | LF | 14,081 | $3.50 | $3.20 | $2.95 | $3.60 |
| 13 | Mix CR JTS flangewys (40600400) | TON | 14.30 | $200.00 | $50.00 | $700.00 | $448.75 |
| 14 | HMA surf rem butt JT (40600982) | SY | 142 | $20.00 | $0.01 | $29.00 | $25.80 |
| 15 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,962 | $104.00 | $113.85 | $98.00 | $109.55 |
| 16 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,996 | $87.00 | $87.30 | $78.00 | $100.30 |
| 17 | PC conc sidewalk 5 (42400200) | SF | 1,000 | $12.00 | $15.00 | $10.00 | $10.15 |
| 18 | Detectable warnings (42400800) | SF | 80 | $45.00 | $65.00 | $42.00 | $36.10 |
| 19 | HMA surf rem 3 (44000161) | SY | 35,672 | $2.35 | $4.00 | $7.00 | $5.45 |
| 20 | Sidewalk rem (44000600) | SF | 1,000 | $5.00 | $5.00 | $3.00 | $3.50 |
| 21 | CL D patch T1 8 (44201737) | SY | 210 | $84.00 | $25.00 | $20.00 | $106.00 |
| 22 | CL D patch T2 8 (44201741) | SY | 430 | $67.00 | $25.00 | $20.00 | $89.95 |
| 23 | CL D patch T3 8 (44201745) | SY | 860 | $62.00 | $25.00 | $20.00 | $78.50 |
| 24 | CL D patch T4 8 (44201747) | SY | 640 | $60.00 | $25.00 | $20.00 | $72.75 |
| 25 | Mobilization (67100100) | LS | 1 | $66,000 | $67,250 | $51,370 | $84,499 |
| 26 | TR cont & prot 701601 (70102630) | LS | 1 | $8,000.00 | $13,500 | $12,000 | $15,000 |
| 27 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $100.00 | $100.00 | $11,000 |
| 28 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1,500.00 | $100.00 | $11,000 |
| 29 | Short term pavt mking (70300100) | LF | 6,892 | $1.00 | $1.00 | $1.00 | $0.94 |
| 30 | SHRT TRM pavt MK rem (70300150) | SF | 2,298 | $0.70 | $2.00 | $1.20 | $1.47 |
| 31 | THPL PVT MK LTR & sym (78000100) | SF | 587 | $5.10 | $6.50 | $4.00 | $4.00 |
| 32 | THPL PVT MK line 4 (78000200) | LF | 2,934 | $0.59 | $1.10 | $1.10 | $1.10 |
| 33 | THPL PVT MK line 6 (78000400) | LF | 2,039 | $0.95 | $1.60 | $1.71 | $1.71 |
| 34 | THPL PVT MK line 12 (78000600) | LF | 357 | $2.55 | $3.00 | $3.41 | $3.41 |
| 35 | THPL PVT MK line 24 (78000650) | LF | 244 | $5.10 | $6.50 | $6.82 | $6.82 |
| 36 | GRV RCSD PM LTR & sym (78011000) | SF | 587 | $3.75 | $3.50 | $3.50 | $3.50 |
| 37 | GRV RCSD PVT MRKG 5 (78011025) | LF | 2,934 | $0.33 | $0.55 | $0.55 | $0.55 |
| 38 | GRV RCSD PVT MRKG 7 (78011035) | LF | 2,039 | $0.45 | $0.65 | $0.80 | $0.80 |
| 39 | GRV RCSD PVT MRKG 13 (78011065) | LF | 357 | $0.85 | $1.50 | $2.50 | $2.50 |
| 40 | GRV RCSD PVT MRKG 25 (78011125) | LF | 244 | $3.75 | $3.50 | $6.00 | $6.00 |
| 41 | Main EX TR sig instal (85000200) | EACH | 1 | $183.70 | $183.70 | $183.70 | $183.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.