IDOT contract 61L49 bid tabulation
City Of Mchenry, section 18-00086-00-BR. Let by Illinois DOT on June 13, 2025, Mchenry, District 01. 3 bids received; low bid $1,194,482 by Alliance Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Alliance Contractors, Inc. | $1,194,482 | Low |
| 2 | Martam Construction Incorporated | $1,455,259 | +22% |
| 3 | Lorig Construction Company | $1,831,742 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alliance Contractors, Inc. | 2. Martam Construction Incorporated | 3. Lorig Construction Company |
|---|---|---|---|---|---|---|
| 1 | Washout basin (X0326806) | LS | 1 | $500.00 | $3,500.00 | $100.00 |
| 2 | Eros cont blanket SPL (X2511630) | SY | 1,272 | $2.50 | $3.00 | $1.50 |
| 3 | Stain conc structures (X5030290) | SF | 1,104 | $13.33 | $15.00 | $13.50 |
| 4 | D I WTR MN fittings (X5610004) | LB | 3,000 | $0.01 | $9.00 | $0.01 |
| 5 | Water main removal (X5610700) | LF | 125 | $50.00 | $40.00 | $50.00 |
| 6 | Press connect 12X12 (X5610778) | EACH | 1 | $17,000 | $12,200 | $17,000 |
| 7 | Cut & cap EX 12 WM (X5630012) | EACH | 2 | $3,500.00 | $2,600.00 | $3,500.00 |
| 8 | Conn to EX W main 12 (X5630712) | EACH | 1 | $8,000.00 | $6,500.00 | $8,000.00 |
| 9 | Memb WTRPRF sys B STR (X5810103) | SY | 223 | $57.87 | $45.00 | $50.00 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $14,000 | $106,000 | $200,000 |
| 11 | Temp info signing (X7200061) | SF | 52 | $16.00 | $18.00 | $17.00 |
| 12 | Sed con stab const EN (Z0013796) | SY | 77 | $1.00 | $68.00 | $48.00 |
| 13 | Construction layout (Z0013798) | LS | 1 | $4,725.00 | $8,000.00 | $85,000 |
| 14 | Rock fill (Z0054400) | CY | 131 | $60.00 | $72.00 | $230.00 |
| 15 | Temp TR signal timing (Z0073510) | EACH | 3 | $700.00 | $500.00 | $400.00 |
| 16 | Earth excavation (20200100) | CY | 1 | $100.00 | $560.00 | $300.00 |
| 17 | Rem & disp uns matl (20201200) | CY | 184 | $100.00 | $95.00 | $118.00 |
| 18 | Channel excavation (20300100) | CY | 20 | $100.00 | $360.00 | $120.00 |
| 19 | Furnished excavation (20400800) | CY | 87 | $1.00 | $55.00 | $100.00 |
| 20 | Porous gran embank (20700220) | CY | 140 | $60.00 | $92.00 | $180.00 |
| 21 | Trench backfill (20800150) | CY | 53 | $60.00 | $115.00 | $0.25 |
| 22 | Geotech fab F/GR stab (21001000) | SY | 645 | $1.00 | $3.00 | $2.75 |
| 23 | Topsoil F & P 6 (21101625) | SY | 45 | $65.00 | $30.00 | $14.00 |
| 24 | Explor trench 48 (21301048) | LF | 75 | $1.00 | $40.00 | $100.00 |
| 25 | Seeding CL 2 (25000200) | ACRE | 0.25 | $4,280.00 | $5,000.00 | $8,000.00 |
| 26 | Seeding CL 4B (25000314) | ACRE | 0.25 | $5,380.00 | $5,800.00 | $8,500.00 |
| 27 | Nitrogen fert nutr (25000400) | LB | 26 | $3.00 | $4.00 | $4.00 |
| 28 | Potassium fert nutr (25000600) | LB | 26 | $3.00 | $4.00 | $4.00 |
| 29 | Temp eros contr seed (28000250) | LB | 50 | $6.00 | $7.00 | $15.00 |
| 30 | Perimeter eros bar (28000400) | LF | 590 | $3.50 | $4.00 | $5.00 |
| 31 | Inlet filters (28000510) | EACH | 2 | $250.00 | $300.00 | $375.00 |
| 32 | Temp eros contr blank (28001100) | SY | 1,272 | $1.30 | $1.30 | $1.10 |
| 33 | Stone riprap CL A4 (28100107) | SY | 240 | $200.00 | $95.00 | $195.00 |
| 34 | Filter fabric (28200200) | SY | 240 | $1.00 | $4.00 | $4.25 |
| 35 | Agg subgrade improve (30300001) | CY | 184 | $67.00 | $65.00 | $110.00 |
| 36 | Agg subgrade impr 12 (30300112) | SY | 645 | $26.00 | $23.00 | $36.00 |
| 37 | Agg base cse B 4 (35101600) | SY | 278 | $9.00 | $12.00 | $21.00 |
| 38 | Bit matls PR CT (40600275) | LB | 1,452 | $0.01 | $0.10 | $0.01 |
| 39 | Bit matls tack CT (40600290) | LB | 146 | $0.01 | $0.10 | $0.01 |
| 40 | HMA BC IL-19.0 N50 (40603080) | TON | 142 | $100.00 | $150.00 | $110.00 |
| 41 | HMA SC IL-9.5 D N50 (40604060) | TON | 71 | $115.00 | $230.00 | $125.00 |
| 42 | PC conc sidewalk 5 (42400200) | SF | 2,502 | $8.00 | $14.00 | $12.00 |
| 43 | Pavement rem (44000100) | SY | 645 | $30.00 | $23.00 | $17.00 |
| 44 | Comb curb gutter rem (44000500) | LF | 376 | $20.00 | $9.00 | $9.00 |
| 45 | Sidewalk rem (44000600) | SF | 2,132 | $2.00 | $2.00 | $3.00 |
| 46 | Rem exist struct (50100100) | EACH | 1 | $90,000 | $162,000 | $325,000 |
| 47 | Cofferdam excavation (50200300) | CY | 343 | $100.00 | $89.00 | $110.00 |
| 48 | Rem/disp uns matl-STR (50200450) | CY | 131 | $100.00 | $95.00 | $135.00 |
| 49 | Cofferdam typ 2 loc 1 (50201121) | EACH | 1 | $1,500.00 | $126,000 | $10,000 |
| 50 | Form liner tex surf (50300285) | SF | 1,104 | $6.00 | $24.00 | $14.00 |
| 51 | Protective coat (50300300) | SY | 123 | $0.01 | $3.00 | $4.50 |
| 52 | Reinf bars, epoxy CTD (50800205) | LB | 42,490 | $2.05 | $1.80 | $1.80 |
| 53 | Pedestrian rail (50900805) | LF | 55 | $172.10 | $232.00 | $175.00 |
| 54 | Parapet railing (50901750) | LF | 78 | $154.25 | $204.00 | $157.00 |
| 55 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,200.00 | $800.00 |
| 56 | Conc box cul (54003000) | CY | 252 | $1,693.00 | $1,250.00 | $1,650.00 |
| 57 | PRC flar end sec 12 (54213657) | EACH | 1 | $750.00 | $1,500.00 | $2,500.00 |
| 58 | Storm sew CL A 1 12 (550A0050) | LF | 12 | $133.00 | $165.00 | $165.00 |
| 59 | Storm sew CL A 2 12 (550A0340) | LF | 48 | $133.00 | $188.00 | $165.00 |
| 60 | D I water main MJ 12 (56104100) | LF | 153 | $410.00 | $365.00 | $410.00 |
| 61 | Water valves 12 (56105200) | EACH | 2 | $4,000.00 | $4,800.00 | $4,000.00 |
| 62 | Fire hyd W/aux V & VB (56400820) | EACH | 1 | $12,000 | $12,600 | $12,000 |
| 63 | Geocomposite wall DR (59100100) | SY | 223 | $49.30 | $32.00 | $41.00 |
| 64 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $6,000.00 | $7,600.00 | $5,200.00 |
| 65 | Inlets TB T11F&G (60240310) | EACH | 2 | $4,000.00 | $2,800.00 | $2,900.00 |
| 66 | VV TA 5 dia T1F CL (60248900) | EACH | 2 | $4,500.00 | $5,400.00 | $4,500.00 |
| 67 | Comb CC&G TB6.12 (60603800) | LF | 376 | $41.00 | $52.00 | $75.00 |
| 68 | Non SPL waste disposl (66900200) | CY | 46 | $125.00 | $117.00 | $120.00 |
| 69 | Soil disposal analy (66900530) | EACH | 1 | $1,600.00 | $1,800.00 | $1,800.00 |
| 70 | Reg sub P-const plan (66901001) | LS | 1 | $3,900.00 | $3,500.00 | $3,000.00 |
| 71 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,300.00 | $2,000.00 |
| 72 | Reg sub mon (66901006) | CAL DAY | 5 | $1,750.00 | $1,000.00 | $1,400.00 |
| 73 | Mobilization (67100100) | LS | 1 | $54,891 | $84,000 | $100,000 |
| 74 | Reloc sin pan assy TA (72400500) | EACH | 1 | $250.00 | $300.00 | $250.00 |
| 75 | Teles STL sin support (72800100) | LF | 13 | $20.00 | $22.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.