IDOT contract 61L83 bid tabulation
Libertyville, section 23-00127-00-RS. Let by Illinois DOT on November 7, 2025, Lake, District 01. 4 bids received; low bid $774,012 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 56
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $774,012 | Low |
| 2 | Everlast Blacktop Inc. | $1,089,048 | +41% |
| 3 | Schroeder Asphalt Services, Inc. | $1,139,217 | +47% |
| 4 | Builders Paving, LLC | $1,250,922 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Everlast Blacktop Inc. | 3. Schroeder Asphalt Services, Inc. | 4. Builders Paving, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Bike path rem (X0327036) | SY | 61 | $47.60 | $20.00 | $25.00 | $30.00 |
| 2 | HMA driveway pavt 3 (X4060280) | SY | 19 | $50.00 | $65.00 | $175.00 | $140.00 |
| 3 | Temporary ramp SPL (X4060995) | SY | 220 | $1.00 | $56.00 | $60.00 | $31.00 |
| 4 | Curb rem & replacemt < = 10FT (X4400221) | LF | 40 | $75.00 | $150.00 | $85.00 | $100.00 |
| 5 | Curb rem&repl > 10FT (X4400223) | LF | 70 | $65.00 | $150.00 | $74.00 | $100.00 |
| 6 | CC&G RMVL repl < = 10 (X4400501) | LF | 50 | $90.00 | $118.00 | $100.00 | $100.00 |
| 7 | CC&G RMVL repl > 10FT (X4400503) | LF | 85 | $80.00 | $118.00 | $90.00 | $100.00 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 5 | $1,505.00 | $1,200.00 | $1,700.00 | $1,772.00 |
| 9 | Temp info signing (X7200061) | SF | 52 | $16.00 | $22.00 | $28.00 | $25.00 |
| 10 | Construction layout (Z0013798) | LS | 1 | $3,575.00 | $8,000.00 | $8,000.00 | $5,500.00 |
| 11 | Drain util STR adj (Z0017400) | EACH | 5 | $680.00 | $950.00 | $1,150.00 | $525.00 |
| 12 | Earth excavation (20200100) | CY | 50 | $115.35 | $45.00 | $130.00 | $85.00 |
| 13 | Rem & disp uns matl (20201200) | CY | 24 | $217.00 | $45.00 | $150.00 | $150.00 |
| 14 | Topsoil F & P 4 (21101615) | SY | 11 | $100.00 | $8.00 | $100.00 | $125.00 |
| 15 | Sodding salt tolerant (25200110) | SY | 11 | $250.00 | $15.00 | $450.00 | $125.00 |
| 16 | Supple watering (25200200) | UNIT | 1 | $0.10 | $1.00 | $60.00 | $300.00 |
| 17 | Inlet filters (28000510) | EACH | 9 | $225.00 | $200.00 | $400.00 | $155.00 |
| 18 | Agg base cse B (35101500) | CY | 76 | $114.45 | $68.00 | $80.00 | $11.00 |
| 19 | Agg base cse B 3 (35101598) | SY | 60 | $15.00 | $8.00 | $18.00 | $13.00 |
| 20 | Bit matls tack CT (40600290) | LB | 10,961 | $0.01 | $0.01 | $0.01 | $0.10 |
| 21 | Long joint sealant (40600370) | LF | 5,507 | $3.85 | $3.80 | $4.55 | $3.50 |
| 22 | Mix CR JTS flangewys (40600400) | TON | 80 | $100.00 | $220.00 | $375.00 | $300.00 |
| 23 | HMA surf rem butt JT (40600982) | SY | 119 | $1.00 | $32.00 | $35.00 | $30.00 |
| 24 | HMA BC IL-19.0 N50 (40603080) | TON | 2,270 | $95.35 | $89.00 | $95.00 | $144.00 |
| 25 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,362 | $103.85 | $89.00 | $100.00 | $153.00 |
| 26 | Protective coat (42001300) | SY | 67 | $1.50 | $5.00 | $2.00 | $5.00 |
| 27 | PC conc sidewalk 5 (42400200) | SF | 546 | $15.00 | $13.00 | $17.50 | $15.00 |
| 28 | Detectable warnings (42400800) | SF | 101 | $53.95 | $68.00 | $61.00 | $55.00 |
| 29 | HMA surf rem 4 (44000165) | SY | 16,237 | $4.00 | $4.00 | $4.75 | $13.00 |
| 30 | CL D patch T1 8 (44201737) | SY | 844 | $25.00 | $92.00 | $89.00 | $40.00 |
| 31 | CL D patch T2 8 (44201741) | SY | 1,106 | $25.00 | $79.00 | $87.00 | $40.00 |
| 32 | CL D patch T3 8 (44201745) | SY | 1,120 | $25.00 | $79.00 | $85.00 | $40.00 |
| 33 | CL D patch T4 8 (44201747) | SY | 1,553 | $25.00 | $76.00 | $85.00 | $40.00 |
| 34 | Aggregate SHLDS B 4 (48101498) | SY | 1,033 | $26.00 | $11.00 | $16.25 | $22.00 |
| 35 | Engr field office A (67000400) | CAL MO | 6 | $1,500.00 | $3,200.00 | $4,000.00 | $4,000.00 |
| 36 | Mobilization (67100100) | LS | 1 | $45,763 | $59,403 | $25,000 | $73,150 |
| 37 | TR cont & prot 701501 (70102620) | LS | 1 | $7,430.00 | $39,602 | $18,000 | $16,000 |
| 38 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $4,500.00 | $1.00 | $100.00 |
| 39 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $4,500.00 | $1,700.00 | $100.00 |
| 40 | Changeable message SN (70107025) | CAL DAY | 150 | $30.00 | $33.00 | $36.00 | $40.00 |
| 41 | Short term pavt mking (70300100) | LF | 1,502 | $0.75 | $1.00 | $3.50 | $1.20 |
| 42 | SHRT TRM pavt MK rem (70300150) | SF | 500 | $3.50 | $1.00 | $5.00 | $1.38 |
| 43 | Temp PVT MK LTR & sym paint (70300211) | SF | 73 | $0.01 | $3.00 | $4.50 | $1.42 |
| 44 | Temp PVT MK line 4 - paint (70300221) | LF | 21,518 | $0.01 | $0.42 | $0.42 | $0.48 |
| 45 | Temp PVT MK line 6 - paint (70300241) | LF | 134 | $0.01 | $1.00 | $2.20 | $0.74 |
| 46 | Temp PVT MK line 12 - paint (70300261) | LF | 92 | $0.01 | $2.00 | $4.50 | $1.42 |
| 47 | Temp PVT MK line 24 - paint (70300281) | LF | 66 | $0.01 | $2.00 | $6.75 | $2.84 |
| 48 | Sign panel T1 (72000100) | SF | 154 | $38.00 | $33.00 | $32.00 | $25.00 |
| 49 | Remov sin pan assy TA (72400100) | EACH | 32 | $40.00 | $115.00 | $50.00 | $85.00 |
| 50 | Teles STL sin support (72800100) | LF | 273 | $16.00 | $22.00 | $21.50 | $15.00 |
| 51 | THPL PVT MK LTR & sym (78000100) | SF | 146 | $5.75 | $6.15 | $6.75 | $7.50 |
| 52 | THPL PVT MK line 4 (78000200) | LF | 21,753 | $0.72 | $0.80 | $0.88 | $0.77 |
| 53 | THPL PVT MK line 6 (78000400) | LF | 199 | $0.85 | $1.00 | $1.70 | $1.16 |
| 54 | THPL PVT MK line 12 (78000600) | LF | 92 | $3.32 | $4.00 | $3.45 | $3.75 |
| 55 | THPL PVT MK line 24 (78000650) | LF | 103 | $5.75 | $7.00 | $6.75 | $7.50 |
| 56 | PVT MKG rem WTR blast (78300202) | SF | 256 | $7.85 | $19.00 | $13.75 | $17.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.