IDOT contract 61L90 bid tabulation
Forest Park, section 25-00121-00-RS. Let by Illinois DOT on January 16, 2026, Cook, District 01. 1 bid received; low bid $3,554,981 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 136
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $3,554,981 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. |
|---|---|---|---|---|
| 1 | P PL ornament T gal P (K0012990) | UNIT | 0.91 | $2,425.00 |
| 2 | Mulch placement 2 (K0036117) | SY | 50 | $11.50 |
| 3 | Prun safety/equip CLR (K1004595) | LS | 1 | $8,500.00 |
| 4 | Pressure connection (XX002136) | EACH | 1 | $18,900 |
| 5 | Water serv ins 1 comp (XX006243) | EACH | 13 | $4,500.00 |
| 6 | Water serv ins 2 comp (XX006244) | EACH | 1 | $9,125.00 |
| 7 | Shut down connection (XX007762) | EACH | 14 | $4,600.00 |
| 8 | Water valves to BE removed (XX008945) | EACH | 19 | $900.00 |
| 9 | Pipe special 12" (XX009735) | LF | 290 | $360.00 |
| 10 | Pipe special 15" (XX009736) | LF | 45 | $370.00 |
| 11 | Pipe special 18" (XX009737) | LF | 30 | $480.00 |
| 12 | Pipe special 24" (XX009738) | LF | 220 | $377.00 |
| 13 | Pipe special 30" (XX009739) | LF | 20 | $1,150.00 |
| 14 | Pipe special 42" (XX009740) | LF | 14 | $2,300.00 |
| 15 | Pavt imprinting (X0326859) | SY | 545 | $173.65 |
| 16 | Structure adj (X0326862) | EACH | 23 | $840.00 |
| 17 | As-built drawings (X0328034) | LS | 1 | $5,000.00 |
| 18 | Trench backfill SPL (X2080250) | CY | 5,350 | $5.00 |
| 19 | Delineator system (X2600020) | EACH | 14 | $4,900.00 |
| 20 | PCC surf rem 2 (X4406816) | SY | 50 | $10.00 |
| 21 | CL D patch T4 6 SPL (X4420486) | SY | 55 | $84.00 |
| 22 | Cur-in-PL pipe LNR 18 (X5430218) | LF | 200 | $245.00 |
| 23 | Comb sew rem 8 (X5510208) | LF | 35 | $1.00 |
| 24 | Comb sew rem 12 (X5510212) | LF | 290 | $1.00 |
| 25 | Comb sew rem 15 (X5510215) | LF | 45 | $1.00 |
| 26 | Comb sew rem 18 (X5510218) | LF | 30 | $1.00 |
| 27 | Comb sew rem 24 (X5510224) | LF | 220 | $1.00 |
| 28 | Comb sew rem 30 (X5510230) | LF | 20 | $1.00 |
| 29 | Comb sew rem 42 (X5510242) | LF | 14 | $1.00 |
| 30 | Plug water main 4 (X5610644) | EACH | 4 | $650.00 |
| 31 | Plug water main 8 (X5610647) | EACH | 10 | $800.00 |
| 32 | Water main remov 4 (X5610704) | LF | 20 | $13.75 |
| 33 | Water main remov 8 (X5610708) | LF | 50 | $16.50 |
| 34 | Inst wat ser complete (X5620120) | EACH | 1 | $7,850.00 |
| 35 | Man TA 10 dia T1F CL (X6022110) | EACH | 1 | $49,150 |
| 36 | VV removed (X6026622) | EACH | 19 | $625.00 |
| 37 | FR & lids adjust SPL (X6030310) | EACH | 26 | $835.00 |
| 38 | Temp info signing (X7200061) | SF | 51.40 | $15.00 |
| 39 | Construction layout (Z0013798) | LS | 1 | $5,500.00 |
| 40 | Drainage STR cleaned (Z0018500) | EACH | 7 | $500.00 |
| 41 | Drainage STR reconst (Z0018600) | EACH | 10 | $3,300.00 |
| 42 | Drainage STR removed (Z0018700) | EACH | 1 | $755.00 |
| 43 | Rem EX sign post (Z0051398) | EACH | 16 | $50.00 |
| 44 | Storm sew WM req 8 (Z0056604) | LF | 45 | $295.00 |
| 45 | Storm sew WM req 10 (Z0056606) | LF | 145 | $296.00 |
| 46 | Storm sew WM req 12 (Z0056608) | LF | 325 | $297.00 |
| 47 | Storm sew WM req 15 (Z0056610) | LF | 60 | $326.00 |
| 48 | Storm sew WM req 18 (Z0056612) | LF | 105 | $371.00 |
| 49 | Trainees (Z0076600) | HR | 500 | $0.80 |
| 50 | Trainees TPG (Z0076604) | HR | 500 | $15.00 |
| 51 | Tree trunk protection (20101100) | EACH | 48 | $25.00 |
| 52 | Tree root pruning (20101200) | EACH | 48 | $50.00 |
| 53 | Earth excavation (20200100) | CY | 25 | $83.00 |
| 54 | Rem & disp uns matl (20201200) | CY | 25 | $80.00 |
| 55 | Topsoil F & P 4 (21101615) | SY | 859 | $7.75 |
| 56 | Topsoil F & P 12 (21101645) | SY | 40 | $28.00 |
| 57 | Compost F & P 2 (21101805) | SY | 40 | $10.00 |
| 58 | Sodding salt tolerant (25200110) | SY | 859 | $13.05 |
| 59 | Supple watering (25200200) | UNIT | 84 | $50.00 |
| 60 | Sub gran mat B 4 (31101200) | SY | 2,410 | $7.75 |
| 61 | Agg base cse B 2 (35101582) | SY | 45 | $18.50 |
| 62 | Bit matls tack CT (40600290) | LB | 10,565 | $0.01 |
| 63 | Mix CR JTS flangewys (40600400) | TON | 1.25 | $1,650.00 |
| 64 | HMA surf rem butt JT (40600982) | SY | 240 | $17.00 |
| 65 | P HMA BC IL-4.75 N50 (40603200) | TON | 495 | $140.00 |
| 66 | HMA SC IL-9.5 D N50 (40604060) | TON | 990 | $105.00 |
| 67 | PCC driveway pavt 7 (42300300) | SY | 45 | $143.00 |
| 68 | PC conc sidewalk 5 (42400200) | SF | 29,641 | $6.50 |
| 69 | Detectable warnings (42400800) | SF | 500 | $40.00 |
| 70 | HMA surf rem 2 (44000157) | SY | 11,790 | $2.65 |
| 71 | Drive pavement rem (44000200) | SY | 45 | $21.00 |
| 72 | Curb rem (44000300) | LF | 115 | $11.00 |
| 73 | Comb curb gutter rem (44000500) | LF | 1,340 | $11.00 |
| 74 | Sidewalk rem (44000600) | SF | 27,598 | $0.85 |
| 75 | CL C patch T4 12 (44201383) | SY | 55 | $111.00 |
| 76 | CL D patch T1 4 (44201690) | SY | 325 | $30.00 |
| 77 | CL D patch T2 4 (44201692) | SY | 325 | $30.00 |
| 78 | CL D patch T3 4 (44201694) | SY | 325 | $30.00 |
| 79 | CL D patch T4 4 (44201696) | SY | 325 | $30.00 |
| 80 | CL D patch T1 6 (44201713) | SY | 11 | $40.00 |
| 81 | CL D patch T2 6 (44201717) | SY | 117 | $40.00 |
| 82 | CL D patch T3 6 (44201721) | SY | 16 | $40.00 |
| 83 | CL D patch T4 6 (44201723) | SY | 1,785 | $40.00 |
| 84 | Saw cuts (44213200) | LF | 80 | $5.00 |
| 85 | Tie bars 3/4 (44213204) | EACH | 80 | $15.00 |
| 86 | Storm sew CL A 1 12 (550A0050) | LF | 600 | $80.00 |
| 87 | Storm sewer rem 8 (55100300) | LF | 45 | $1.00 |
| 88 | Storm sewer rem 10 (55100400) | LF | 145 | $1.00 |
| 89 | Storm sewer rem 12 (55100500) | LF | 325 | $1.00 |
| 90 | Storm sewer rem 15 (55100700) | LF | 60 | $1.00 |
| 91 | Storm sewer rem 18 (55100900) | LF | 105 | $1.00 |
| 92 | DI wat MN tee, 8X 6 (56100015) | EACH | 10 | $825.00 |
| 93 | DI wat MN tee, 8X 8 (56100020) | EACH | 15 | $975.00 |
| 94 | DI wat MN red, 8 X 4 (56101148) | EACH | 4 | $400.00 |
| 95 | D I water main 6 (56103000) | LF | 140 | $161.00 |
| 96 | D I water main 8 (56103100) | LF | 3,175 | $168.00 |
| 97 | Water valves 8 (56105000) | EACH | 24 | $2,875.00 |
| 98 | DI WT MNF 8 22.50 DB (56109408) | EACH | 1 | $525.00 |
| 99 | DI WT MNF 8 45.0 DB (56109420) | EACH | 38 | $550.00 |
| 100 | Fire hydnts to BE rem (56400500) | EACH | 9 | $775.00 |
| 101 | Fire hyd W/aux V & VB (56400820) | EACH | 10 | $11,230 |
| 102 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $7,825.00 |
| 103 | VV TA 5 dia T1F CL (60248900) | EACH | 24 | $7,125.00 |
| 104 | Valve box adj (60266600) | EACH | 1 | $600.00 |
| 105 | FR & lids T1 OL (60406000) | EACH | 5 | $550.00 |
| 106 | FR & lids T1 CL (60406100) | EACH | 27 | $550.00 |
| 107 | Conc curb TB (60600605) | LF | 115 | $45.50 |
| 108 | Comb CC&G TB6.12 (60603800) | LF | 1,340 | $40.00 |
| 109 | Non SPL waste disposl (66900200) | CY | 85 | $100.00 |
| 110 | Soil disposal analy (66900530) | EACH | 1 | $1,685.00 |
| 111 | Reg sub P-const plan (66901001) | LS | 1 | $3,600.00 |
| 112 | Reg sub F con report (66901003) | LS | 1 | $500.00 |
| 113 | Reg sub mon (66901006) | CAL DAY | 2 | $715.00 |
| 114 | Mobilization (67100100) | LS | 1 | $213,250 |
| 115 | TR cont & prot 701501 (70102620) | LS | 1 | $461,445 |
| 116 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 |
| 117 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 |
| 118 | Changeable message SN (70107025) | CAL DAY | 105 | $30.00 |
| 119 | Short term pavt mking (70300100) | LF | 1,085 | $1.00 |
| 120 | SHRT TRM pavt MK rem (70300150) | SF | 365 | $1.00 |
| 121 | Sign panel T1 (72000100) | SF | 167 | $30.00 |
| 122 | Sign panel T2 (72000200) | SF | 10 | $40.00 |
| 123 | Remov sin pan assy TA (72400100) | EACH | 12 | $100.00 |
| 124 | Remov sin pan assy TB (72400200) | EACH | 4 | $100.00 |
| 125 | Remov sign panel T1 (72400310) | SF | 53 | $10.00 |
| 126 | Teles STL sin support (72800100) | LF | 70 | $20.00 |
| 127 | Metal post TY A (72900100) | LF | 147 | $20.00 |
| 128 | Base tel STL sin supp (73100100) | EACH | 14 | $150.00 |
| 129 | THPL PVT MK LTR & sym (78000100) | SF | 149 | $8.50 |
| 130 | THPL PVT MK line 4 (78000200) | LF | 7,503 | $0.81 |
| 131 | THPL PVT MK line 6 (78000400) | LF | 2,088 | $1.22 |
| 132 | THPL PVT MK line 12 (78000600) | LF | 396 | $4.25 |
| 133 | THPL PVT MK line 24 (78000650) | LF | 266 | $8.50 |
| 134 | Elcbl C lead 14 1PR (87301305) | LF | 120 | $3.65 |
| 135 | Det loop T1 (88600100) | LF | 100 | $42.42 |
| 136 | Rem elcbl FR con (89502300) | LF | 120 | $1.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.