IDOT contract 61M09 bid tabulation

Berwyn, section 23-00177-00-PV. Let by Illinois DOT on January 16, 2026, Cook, District 01. 3 bids received; low bid $7,777,148 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
157
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$7,777,148Low
2Performance Construction and Engineering, LLC$8,764,988+13%
3Schroeder Asphalt Services, Inc.$9,771,081+26%
IDOT contract 61M09: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. Performance Construction and Engineering, LLC3. Schroeder Asphalt Services, Inc.
1T-ginkgo bil AG 2-1/2 (A2004514)EACH6$620.00$1,062.50$1,030.00
2T-gled tri-I SM 2-1/2 (A2004720)EACH4$612.00$618.75$920.00
3P PL ornament T gal P (K0012990)UNIT10$3,400.00$2,200.00$2,400.00
4Test hole (XX003338)EACH3$900.00$425.00$800.00
5Area drain (XX006240)EACH12$800.00$975.00$1,900.00
6Backflow preventer (XX006433)EACH2$750.00$900.00$2,300.00
7Concrete ribbon (XX007079)LF1,559$25.00$26.00$44.00
8Fill valve VLTS (XX009600)EACH19$500.00$2,000.00$275.00
9Biaxial geogrid (X0325110)SY1,661$3.00$6.00$6.00
10Washout basin (X0326806)LS1$4,500.00$1,500.00$1,000.00
11Conc paver pavement (X0327978)SY942$132.00$81.50$130.00
12Solpwr illum sign LED (X1400097)EACH2$9,000.00$5,888.18$9,262.00
13R R FL beacon A comp (X1400326)EACH2$14,000$14,989$14,280
14Decorative stone (X1800024)SF1,455$16.00$23.04$30.00
15PLNTG soil mix F&P 18 (X2111218)SY606$40.00$35.00$70.00
16Agg base cse CA-7 (X3510407)TON1,790$45.00$48.65$46.00
17Temp access- priv ent (X4021000)EACH22$600.00$410.00$100.00
18PC conc sidewalk 5 SP (X4240430)SF154$27.00$30.00$50.00
19Detectable warn SPL (X4240800)SF12$85.00$100.00$62.00
20Cur-in-PL pipe LNR 12 (X5430212)LF1,648$63.00$57.50$65.00
21Cur-in-PL pipe LNR 15 (X5430215)LF340$78.00$64.38$74.00
22Cur-in-PL pipe LNR 18 (X5430218)LF315$122.00$113.31$124.00
23Comb sew rem 10 (X5510210)LF16$30.00$10.00$26.00
24Comb sew rem 12 (X5510212)LF190$30.00$12.00$26.00
25Comb sew rem 15 (X5510215)LF230$30.00$12.00$26.00
26Comb sew rem 18 (X5510218)LF32$30.00$15.00$26.00
27Comb sew rem 21 (X5510221)LF47$50.00$20.00$26.00
28Comb sew rem 24 (X5510224)LF63$50.00$22.00$32.00
29Comb sew rem 30 (X5510230)LF44$50.00$25.00$43.00
30San sew remov 12 (X5510312)LF22$30.00$12.00$33.00
31Cleanouts (X5610001)EACH2$800.00$325.00$1,550.00
32Inst wat ser complete (X5620120)EACH149$4,800.00$5,750.00$4,600.00
33Sanitary sewer conn (X5630212)EACH6$300.00$200.00$4,200.00
34Conn to EX W main 6 (X5630706)EACH9$2,400.00$8,700.00$6,250.00
35Conn to EX W main 8 (X5630708)EACH15$3,200.00$9,000.00$6,250.00
36Conn to EX W main 10 (X5630710)EACH2$4,200.00$9,500.00$8,300.00
37FR & lids adjust SPL (X6030310)EACH4$1,500.00$2,500.00$1,550.00
38Temp info signing (X7200061)SF52$20.00$25.00$24.00
39Paint PVT mark curb (X7800200)LF2,365$1.00$1.20$3.00
40Accessible ped signal (X8760200)EACH8$2,400.00$1,996.74$9,262.00
41Det loop repl (X8860105)LF104$60.00$49.75$60.50
42Construction layout (Z0013798)LS1$60,000$86,427$80,000
43Drainage STR removed (Z0018700)EACH50$600.00$2,500.00$250.00
44Drill-grout #6 T-bar (Z0018911)EACH1,650$14.00$12.00$38.00
45RE-optimize TR sig sys 1 (Z0033044)EACH1$1,300.00$1,072.50$1,335.00
46Storm sew WM req 8 (Z0056604)LF2,556$72.00$177.00$94.00
47San sew 10 (Z0057000)LF16$145.00$1,275.00$800.00
48San sew 12 (Z0057100)LF247$162.00$525.00$530.00
49San sew 15 (Z0057200)LF232$166.00$540.00$560.00
50San sew 18 (Z0057300)LF12$227.00$2,500.00$1,125.00
51San sew 21 (Z0057400)LF26$245.00$1,800.00$615.00
52San sew 24 (Z0057500)LF80$372.00$1,100.00$590.00
53San sew 30 (Z0057700)LF44$525.00$1,500.00$615.00
54Trainees (Z0076600)HR500$0.80$0.80$0.80
55Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
56Tree trunk protection (20101100)EACH19$160.00$100.00$220.00
57Tree root pruning (20101200)EACH19$140.00$105.00$205.00
58Earth excavation (20200100)CY1,490$72.00$40.00$66.00
59Trench backfill (20800150)CY5,522$68.00$47.00$107.00
60Geotech fab F/GR stab (21001000)SY450$3.00$2.45$4.00
61Topsoil F & P 4 (21101615)SY6,098$6.60$6.50$9.00
62Nitrogen fert nutr (25000400)LB76$4.00$4.00$5.00
63Phosphorus fert nutr (25000500)LB76$4.00$4.00$5.00
64Potassium fert nutr (25000600)LB76$4.00$4.00$5.00
65Sodding salt tolerant (25200110)SY6,098$16.00$11.00$19.55
66Supple watering (25200200)UNIT337$0.10$5.00$45.00
67Inlet filters (28000510)EACH111$250.00$225.00$225.00
68Filter fabric (28200200)SY3,813$2.00$2.00$3.00
69Agg subgrade improve (30300001)CY150$65.00$69.50$60.00
70Sub gran mat B 6 (31101400)SY1,856$9.00$16.50$12.00
71Agg base cse B 4 (35101600)SY2,843$6.00$14.00$10.00
72PCC base cse W 10 (35400500)SY1,783$108.00$99.00$120.00
73Bit matls tack CT (40600290)LB12,130$0.10$0.01$0.01
74Mix CR JTS flangewys (40600400)TON36$60.00$370.00$300.00
75HMA surf rem butt JT (40600982)SY424$6.00$20.00$14.00
76P HMA BC IL-4.75 N50 (40603200)TON816$140.00$122.00$119.00
77HMA SC IL-9.5 D N50 (40604060)TON1,661$117.00$104.50$94.00
78PCC driveway pavt 7 (42300300)SY622$102.00$99.00$148.00
79PC conc sidewalk 5 (42400200)SF24,807$11.00$9.00$14.25
80Detectable warnings (42400800)SF1,076$42.00$40.00$40.00
81Pavement rem (44000100)SY3,162$18.00$11.50$19.00
82HMA surf rem 2 1/4 (44000158)SY17,969$7.00$4.70$2.75
83Drive pavement rem (44000200)SY647$15.00$16.58$16.50
84Comb curb gutter rem (44000500)LF9,981$9.00$5.25$10.00
85Sidewalk rem (44000600)SF25,191$2.00$2.15$3.00
86CL B patch T1 10 (44200966)SY180$165.00$99.00$225.00
87CL B patch T2 10 (44200970)SY360$165.00$97.00$225.00
88CL B patch T3 10 (44200974)SY540$152.00$95.00$225.00
89CL B patch T4 10 (44200976)SY3,549$130.00$88.00$225.00
90Dowel bars 1 1/2 (44201299)EACH3,000$28.00$22.00$37.00
91CL D patch T1 10 (44201761)SY90$135.00$85.00$118.00
92CL D patch T2 10 (44201765)SY180$135.00$82.00$115.00
93CL D patch T3 10 (44201769)SY270$122.00$77.00$110.00
94CL D patch T4 10 (44201771)SY710$122.00$75.00$110.00
95Storm sewer rem 6 (55100200)LF221$10.00$8.00$25.00
96Storm sewer rem 8 (55100300)LF1,196$10.00$8.00$25.00
97D I water main 6 (56103000)LF95$150.00$166.00$142.00
98D I water main 8 (56103100)LF6,207$154.00$230.00$145.00
99D I water main 10 (56103200)LF93$192.00$265.00$200.00
100Water valves 8 (56105000)EACH34$2,700.00$2,750.00$5,750.00
101Water valves 10 (56105100)EACH2$3,600.00$3,750.00$7,000.00
102Fire hydnts to BE rem (56400500)EACH12$900.00$550.00$375.00
103Fire hyd W/aux V & VB (56400820)EACH13$10,800$12,500$10,200
104Pipe underdr T 1 4 (60108104)LF1,625$26.00$30.00$23.00
105CB TA 4 dia T1F OL (60200105)EACH39$4,800.00$7,500.00$5,500.00
106CB TC T1F OL (60206905)EACH18$3,600.00$4,100.00$3,650.00
107Man TA 4 dia T1F OL (60218300)EACH3$5,200.00$5,600.00$5,600.00
108Man TA 4 dia T1F CL (60218400)EACH1$5,200.00$7,800.00$5,600.00
109Man TA 5 dia T1F CL (60221100)EACH1$6,800.00$18,300$9,000.00
110Inlets TA T1F OL (60234200)EACH20$2,800.00$3,500.00$2,600.00
111VV TA 5 dia T1F CL (60248900)EACH34$5,600.00$8,000.00$7,100.00
112CB adjust (60250200)EACH6$700.00$2,500.00$400.00
113Man reconst (60257900)EACH17$1,500.00$5,500.00$4,800.00
114Conc curb TB (60600605)LF1,215$33.00$32.00$62.00
115Comb CC&G TB6.12 (60603800)LF9,679$33.00$32.00$56.00
116Comb CC&G TB6.18 (60604400)LF113$54.00$40.00$74.00
117Non SPL waste disposl (66900200)CY10$256.00$320.00$150.00
118Soil disposal analy (66900530)EACH1$1,800.00$5,000.00$1,750.00
119Reg sub P-const plan (66901001)LS1$3,500.00$2,000.00$4,800.00
120Reg sub F con report (66901003)LS1$1,500.00$2,000.00$700.00
121Reg sub mon (66901006)CAL DAY2$1,600.00$1,500.00$900.00
122Mobilization (67100100)LS1$466,000$525,840$905,000
123TR cont & prot 701501 (70102620)LS1$246,000$22,500$18,000
124TR cont & prot 701606 (70102625)LS1$1,000.00$1.00$1.00
125TR cont & prot 701701 (70102635)LS1$2,500.00$14,500$18,000
126TR cont & prot 701801 (70102640)LS1$1,000.00$1.00$18,000
127Short term pavt mking (70300100)LF2,090$1.00$0.60$3.00
128SHRT TRM pavt MK rem (70300150)SF697$4.00$0.88$4.00
129Temp PVT MK line 4 - paint (70300221)LF2,454$0.40$0.50$0.70
130Temp PVT MK line 12 - paint (70300261)LF3,000$0.35$1.00$2.00
131Temp PVT MK line 24 - paint (70300281)LF866$1.00$2.50$1.65
132Sign panel T1 (72000100)SF29$26.00$55.00$35.00
133Remov sin pan assy TA (72400100)EACH2$165.00$60.00$150.00
134Rem & rel sign panel asmbly TA (72400205)EACH39$220.00$175.00$200.00
135Teles STL sin support (72800100)LF672$22.00$14.00$22.00
136THPL PVT MK line 4 (78000200)LF1,227$1.00$1.00$1.00
137THPL PVT MK line 6 (78000400)LF4,989$1.40$1.50$1.45
138THPL PVT MK line 12 (78000600)LF2,814$2.60$3.00$3.25
139THPL PVT MK line 24 (78000650)LF433$6.00$6.00$6.50
140Undrgrd C galvs 3 (81028220)LF7$200.00$142.29$213.00
141Reloc EX LT unit (84400105)EACH6$5,000.00$3,496.46$5,180.00
142Main EX TR sig instal (85000200)EACH1$6,000.00$13,655$6,636.00
143Elcbl C signal 14 2C (87301215)LF1,119$2.20$3.34$2.50
144Elcbl C signal 14 3C (87301225)LF1,140$2.60$3.52$2.75
145Elcbl C signal 14 5C (87301245)LF582$3.70$3.93$4.00
146Elcbl C egrdc 6 1C (87301900)LF18$22.00$5.09$22.00
147Conc FDN TY A (87800100)LF4$580.00$332.37$586.00
148Drill EX handhole (87900200)EACH1$1,050.00$975.49$1,084.00
149Ped SH LED 1F BM CDT (88102717)EACH8$1,260.00$806.34$1,287.00
150Reloc EX sig head (89500100)EACH2$1,500.00$739.12$1,535.00
151Reloc EX TS post (89501150)EACH1$1,240.00$769.12$1,255.00
152Mod EX contr (89502200)EACH1$1,480.00$995.24$1,484.00
153Mod EX contr cab (89502210)EACH1$1,280.00$857.74$1,330.00
154Rem elcbl FR con (89502300)LF904$1.40$2.36$1.50
155Remov EX TS equip (89502375)EACH1$3,000.00$1,890.98$3,158.50
156Rebuild EX handhole (89502376)EACH2$4,500.00$2,790.98$4,657.00
157Remov EX conc FDN (89502385)EACH1$1,050.00$1,005.49$1,075.00
IDOT contract 61M09: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy