IDOT contract 62V39 bid tabulation

Section FAP. Let by Illinois DOT on June 13, 2025, Lake, District 01. 2 bids received; low bid $1,630,685 by Payne & Dolan, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
44
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne & Dolan, Inc.$1,630,685Low
2Peter Baker & Son Co.$2,020,389+24%
IDOT contract 62V39: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne & Dolan, Inc.2. Peter Baker & Son Co.
1Grading & shap SHLDRS (X2020110)UNIT202$24.00$0.01
2Centerln rum strip 16 (X6420114)LF7,665$0.73$1.35
3Engrs FLD ofc TY A D1 (X6700407)CAL MO12$2,200.00$1,000.00
4Temp info signing (X7200061)SF154.20$20.00$20.00
5HS THPL PM LN 4 (X7800815)LF8,133$0.89$0.89
6Earth excavation (20200100)CY4,750$40.00$20.00
7Sub gran mat B 6 (31101400)SY8,549$13.42$40.00
8HMA base cse 6 (35501308)SY166$97.34$98.00
9Bit matls tack CT (40600290)LB12,653$0.01$2.30
10Long joint sealant (40600370)LF10,068$2.69$3.77
11Mix CR JTS flangewys (40600400)TON43$500.00$200.00
12HMA surf rem butt JT (40600982)SY83$82.00$1.00
13HMA SC IL-9.5 D N70 (40604062)TON2,378$82.00$95.00
14Pavement rem (44000100)SY2,142$25.00$135.00
15HMA surf rem 1 1/2 (44000155)SY28,183$2.70$2.70
16Comb curb gutter rem (44000500)LF30$100.00$17.00
17CL D patch T1 12 (44201785)SY71$110.00$50.00
18CL D patch T2 12 (44201789)SY564$110.00$50.00
19CL D patch T3 12 (44201794)SY423$110.00$50.00
20CL D patch T4 12 (44201796)SY353$110.00$50.00
21Agg wedge SHLD type B (48102100)TON364$95.00$63.00
22HMA shoulders 8 (48203029)SY8,549$41.14$45.00
23Shoulder rum strip 8 (64200108)LF20,136$0.60$0.57
24Non SPL waste disposl (66900200)CY1,245$52.95$35.00
25Soil disposal analy (66900530)EACH4$1,200.00$1,300.00
26Reg sub P-const plan (66901001)LS1$4,200.00$4,200.00
27Reg sub F con report (66901003)LS1$1,200.00$1,200.00
28Reg sub mon (66901006)CAL DAY10$1,100.00$1,100.00
29Mobilization (67100100)LS1$145,000$208,012
30Traf cont-prot 701201 (70100450)LS1$7,900.00$61,030
31Traf cont-prot 701306 (70100460)LS1$100.00$100.00
32Traf cont-prot 701326 (70100500)LS1$100.00$100.00
33Short term pavt mking (70300100)LF11,048$0.01$0.01
34SHRT TRM pavt MK rem (70300150)SF736.50$3.23$0.01
35Temp PVT MK LTR & sym paint (70300211)SF232.20$1.35$0.01
36Temp PVT MK line 4 - paint (70300221)LF93,828$0.45$0.01
37Temp PVT MK line 6 - paint (70300241)LF894$0.70$0.01
38Temp PVT MK line 24 - paint (70300281)LF117$2.70$0.01
39THPL PVT MK LTR & sym (78000100)SF77.40$10.00$10.00
40THPL PVT MK line 4 (78000200)LF23,144$1.05$1.05
41THPL PVT MK line 6 (78000400)LF298$1.63$1.63
42THPL PVT MK line 24 (78000650)LF39$6.50$6.50
43Raised refl pavt MKR (78100100)EACH241$54.80$54.80
44Raised ref PVT MK rem (78300200)EACH241$2.86$12.00
IDOT contract 62V39: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy