IDOT contract 62X70 bid tabulation
Section 2024-1030-RS. Let by Illinois DOT on June 13, 2025, Cook, District 01. 2 bids received; low bid $755,632 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 57
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $755,632 | Low |
| 2 | Peter Baker & Son Co. | $975,858 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Peter Baker & Son Co. |
|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $5,000.00 | $3,500.00 |
| 2 | TV inspect of sewer (X0325207) | LF | 100 | $35.00 | $32.00 |
| 3 | CC&G RMVL repl < = 10 (X4400501) | LF | 379 | $70.00 | $120.00 |
| 4 | SS cleaned 12 (X5537800) | LF | 475 | $3.00 | $4.00 |
| 5 | FR & lids adjust SPL (X6030310) | EACH | 26 | $1,250.00 | $1,350.00 |
| 6 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $3,500.00 | $1,000.00 |
| 7 | Temp info signing (X7200061) | SF | 51.40 | $18.00 | $18.00 |
| 8 | Det loop repl (X8860105) | LF | 734 | $79.20 | $27.11 |
| 9 | Drainage STR cleaned (Z0018500) | EACH | 38 | $350.00 | $315.00 |
| 10 | RR prot liability ins (Z0048665) | LS | 1 | $5,000.00 | $10,000 |
| 11 | Earth excavation (20200100) | CY | 20 | $145.00 | $85.00 |
| 12 | Topsoil F & P 4 (21101615) | SY | 64 | $20.00 | $20.00 |
| 13 | Sodding salt tolerant (25200110) | SY | 64 | $35.00 | $60.00 |
| 14 | Bit matls tack CT (40600290) | LB | 7,635 | $0.01 | $0.01 |
| 15 | Long joint sealant (40600370) | LF | 4,840 | $3.36 | $4.50 |
| 16 | Mix CR JTS flangewys (40600400) | TON | 17 | $325.00 | $1,115.00 |
| 17 | HMA surf rem butt JT (40600982) | SY | 444 | $10.00 | $1.00 |
| 18 | P HMA BC IL-4.75 N50 (40603200) | TON | 467 | $155.00 | $150.00 |
| 19 | HMA SC IL-9.5 D N70 (40604062) | TON | 951 | $113.00 | $125.00 |
| 20 | Protective coat (42001300) | SY | 176 | $1.00 | $3.00 |
| 21 | PC conc sidewalk 5 (42400200) | SF | 920 | $12.25 | $17.00 |
| 22 | Detectable warnings (42400800) | SF | 191 | $35.00 | $60.00 |
| 23 | HMA surf rem 2 1/4 (44000158) | SY | 11,311 | $3.50 | $6.50 |
| 24 | Sidewalk rem (44000600) | SF | 920 | $2.50 | $5.00 |
| 25 | CL D patch T2 13 (44201803) | SY | 566 | $50.00 | $250.00 |
| 26 | CL D patch T3 13 (44201807) | SY | 340 | $50.00 | $220.00 |
| 27 | CL D patch T4 13 (44201809) | SY | 227 | $50.00 | $195.00 |
| 28 | Storm sew CL A 1 12 (550A0050) | LF | 16 | $850.00 | $450.00 |
| 29 | Storm sewer rem 12 (55100500) | LF | 16 | $50.00 | $50.00 |
| 30 | FR & grates adjust (60300105) | EACH | 3 | $485.00 | $900.00 |
| 31 | FR & lids adjust (60300305) | EACH | 9 | $550.00 | $900.00 |
| 32 | Non SPL waste disposl (66900200) | CY | 20 | $90.00 | $150.00 |
| 33 | Soil disposal analy (66900530) | EACH | 1 | $1,785.00 | $1,785.00 |
| 34 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,400.00 |
| 35 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 |
| 36 | Reg sub mon (66901006) | CAL DAY | 10 | $700.00 | $700.00 |
| 37 | Mobilization (67100100) | LS | 1 | $45,300 | $99,159 |
| 38 | TR cont & prot 701501 (70102620) | LS | 1 | $147,000 | $51,165 |
| 39 | TR cont & prot 701502 (70102622) | LS | 1 | $2,247.00 | $2,247.00 |
| 40 | TR cont & prot 701701 (70102635) | LS | 1 | $2,247.00 | $2,247.00 |
| 41 | TR cont & prot 701801 (70102640) | LS | 1 | $2,247.00 | $7,619.00 |
| 42 | Short term pavt mking (70300100) | LF | 846 | $0.10 | $0.60 |
| 43 | SHRT TRM pavt MK rem (70300150) | SF | 94 | $0.10 | $20.00 |
| 44 | Temp PVT MK LTR & sym paint (70300211) | SF | 984 | $0.10 | $1.75 |
| 45 | Temp PVT MK line 4 - paint (70300221) | LF | 6,927 | $0.10 | $0.35 |
| 46 | Temp PVT MK line 6 - paint (70300241) | LF | 2,259 | $0.10 | $0.53 |
| 47 | Temp PVT MK line 12 - paint (70300261) | LF | 3,183 | $0.10 | $1.06 |
| 48 | Temp PVT MK line 24 - paint (70300281) | LF | 924 | $0.10 | $1.60 |
| 49 | Temp PVT MK L4 T4 tape (70307120) | LF | 282 | $0.10 | $7.20 |
| 50 | THPL PVT MK LTR & sym (78000100) | SF | 328 | $5.00 | $5.00 |
| 51 | THPL PVT MK line 4 (78000200) | LF | 2,309 | $1.00 | $1.00 |
| 52 | THPL PVT MK line 6 (78000400) | LF | 753 | $2.00 | $2.00 |
| 53 | THPL PVT MK line 12 (78000600) | LF | 1,061 | $4.00 | $4.00 |
| 54 | THPL PVT MK line 24 (78000650) | LF | 308 | $5.00 | $5.00 |
| 55 | Raised refl pavt MKR (78100100) | EACH | 91 | $62.00 | $62.00 |
| 56 | Raised ref PVT MK rem (78300200) | EACH | 82 | $22.00 | $20.00 |
| 57 | PVT MKG rem WTR blast (78300202) | SF | 94 | $48.00 | $48.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.