IDOT contract 62Y32 bid tabulation
Section 2025-1083-GRR. Let by Illinois DOT on September 19, 2025, Various, District 01. 3 bids received; low bid $2,998,621 by Kujo, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 41
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kujo, Inc. | $2,998,621 | Low |
| 2 | RoadSafe Traffic Systems, Inc. | $3,332,990 | +11% |
| 3 | Fence Masters, Inc. | $3,569,182 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kujo, Inc. | 2. RoadSafe Traffic Systems, Inc. | 3. Fence Masters, Inc. |
|---|---|---|---|---|---|---|
| 1 | Reat/RLGN TRM/RL PLTS (X2300019) | EACH | 22 | $850.00 | $1,000.00 | $924.50 |
| 2 | Curb removal part (X4402302) | LF | 149 | $10.00 | $50.00 | $7.53 |
| 3 | Repair SPBGR TY B (X6300162) | LF | 50 | $40.00 | $200.00 | $41.93 |
| 4 | Repair SPBGR TY C (X6300164) | LF | 50 | $30.00 | $60.00 | $34.40 |
| 5 | Guardrail blocks (X6300210) | EACH | 1,630 | $55.00 | $40.00 | $59.13 |
| 6 | Rail element plates (X6300215) | EACH | 2,078 | $240.00 | $230.00 | $272.00 |
| 7 | Rail elem plate rad (X6300217) | EACH | 100 | $300.00 | $200.00 | $23.25 |
| 8 | Connect end section (X6300222) | EACH | 50 | $10.00 | $100.00 | $10.75 |
| 9 | Return end section (X6300224) | EACH | 10 | $200.00 | $250.00 | $215.00 |
| 10 | Single end section (X6300225) | EACH | 17 | $220.00 | $275.00 | $236.50 |
| 11 | Steel posts (X6300230) | EACH | 2,400 | $195.00 | $200.00 | $216.00 |
| 12 | Thrie-BM GDRL ele PLT (X6300610) | EACH | 7 | $320.00 | $350.00 | $344.00 |
| 13 | Thrie-BM mod block (X6300620) | EACH | 7 | $35.00 | $350.00 | $37.63 |
| 14 | Thrie-beam post (X6300630) | EACH | 7 | $200.00 | $350.00 | $215.00 |
| 15 | Thrie-BM radi ele PLT (X6300640) | EACH | 4 | $300.00 | $500.00 | $301.00 |
| 16 | Traf bar term T1 nose (X6310163) | EACH | 10 | $345.00 | $1,000.00 | $371.95 |
| 17 | Traf bar term T3 SPL (X6310177) | EACH | 4 | $2,500.00 | $2,500.00 | $1,075.00 |
| 18 | TBT T3 SPL nose (X6310203) | EACH | 3 | $425.00 | $600.00 | $430.00 |
| 19 | Rep traf B term T1 SP (X6310301) | EACH | 322 | $2,270.00 | $2,250.00 | $2,600.00 |
| 20 | Rep TB term T1 SP PST (X6310306) | EACH | 405 | $30.00 | $225.00 | $145.13 |
| 21 | Rep TB term T1 SP RLP (X6310310) | EACH | 117 | $30.00 | $225.00 | $134.38 |
| 22 | Repair TR bar term T1 (X6310312) | EACH | 9 | $800.00 | $1,250.00 | $880.43 |
| 23 | Repair TR bar term T2 (X6310316) | EACH | 35 | $1,024.00 | $1,000.00 | $1,101.88 |
| 24 | Rep TB term T3 SPL (X6310320) | EACH | 9 | $2,600.00 | $2,500.00 | $2,795.00 |
| 25 | Repair TR bar term T5 (X6310326) | EACH | 4 | $420.00 | $500.00 | $456.88 |
| 26 | Repair TR bar term T6 (X6310330) | EACH | 5 | $3,000.00 | $2,000.00 | $3,226.08 |
| 27 | GDRL post vert adjust (X6330800) | EACH | 23 | $50.00 | $50.00 | $48.38 |
| 28 | Steel posts modified (X6331105) | EACH | 29 | $200.00 | $225.00 | $225.75 |
| 29 | Steel posts special (X6331110) | EACH | 18 | $240.00 | $350.00 | $268.75 |
| 30 | Wood rail (X6640632) | LF | 360 | $10.00 | $15.00 | $10.75 |
| 31 | Steel railing SPL (Z0007124) | LF | 55 | $145.00 | $200.00 | $155.88 |
| 32 | Rem & reset posts (Z0051400) | EACH | 100 | $90.00 | $100.00 | $91.38 |
| 33 | SPBGR TY A 6FT posts (63000001) | LF | 475 | $20.00 | $75.00 | $72.00 |
| 34 | Traf bar term T1B (63100041) | EACH | 3 | $7.00 | $4,000.00 | $3,800.00 |
| 35 | Traf bar term T2 (63100045) | EACH | 20 | $1,400.00 | $4,500.00 | $1,492.10 |
| 36 | Traf bar term T5 (63100070) | EACH | 3 | $1,450.00 | $4,000.00 | $768.63 |
| 37 | Traf bar term T6 (63100085) | EACH | 6 | $4,150.00 | $4,000.00 | $4,622.50 |
| 38 | TR bar TRM T1 SPL tan (63100167) | EACH | 215 | $4,065.00 | $4,625.00 | $5,231.00 |
| 39 | TR bar TRM T1 SPL FLR (63100169) | EACH | 12 | $3,100.00 | $4,500.00 | $3,440.00 |
| 40 | Terminal marker - DA (72501000) | EACH | 100 | $55.00 | $50.00 | $32.75 |
| 41 | Grdrail ref type A (78200005) | EACH | 700 | $25.00 | $20.00 | $43.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.