IDOT contract 64P28 bid tabulation

Section 103RS-3. Let by Illinois DOT on August 1, 2025, Winnebago, District 02. 2 bids received; low bid $1,406,302 by Martin & Company Excavating.

Owner
Illinois DOT
Letting
01 AUG 2025
Pay items
95
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martin & Company Excavating$1,406,302Low
2Alliance Contractors, Inc.$1,545,336+10%
IDOT contract 64P28: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martin & Company Excavating2. Alliance Contractors, Inc.
1Cable splice special (X0322951)EACH1$573.75$573.75
2Geotechnical reinf (X2100104)SY1,337$0.01$5.00
3Prof DMD GRND con PVT (X4202010)SY11,111$9.00$6.71
4HMA surf rem SPL (X4400196)SY1,194$8.80$12.43
5San MH adj new T1F CL (X6026056)EACH2$2,100.00$1,500.00
6Intercept EX conduit (X8100863)EACH1$743.75$743.75
7Accessible ped signal (X8760200)EACH6$1,347.75$1,347.75
8Video veh det sys (X8891001)EACH1$28,500$25,592
9Rem EX TR cont & cab (X8950105)EACH1$1,800.00$1,800.00
10Construction layout (Z0013798)LS1$12,000$5,110.00
11Earth excavation (20200100)CY20$190.00$100.00
12Topsoil F & P 4 (21101615)SY83$14.00$10.00
13Sodding salt tolerant (25200110)SY83$140.00$75.00
14Supple watering (25200200)UNIT3$500.00$1,000.00
15Inlet filters (28000510)EACH4$245.00$500.00
16Agg subgrade improve (30300001)CY134$35.00$100.00
17P bit matls tack CT (40600295)LB7,691$0.10$1.02
18Long joint sealant (40600370)LF9,132$3.17$3.79
19HMA BC HM N50 (40600900)TON15$75.00$305.27
20Temporary ramp (40600990)SY15$12.00$129.54
21HMA SC IL-9.5 D N50 (40604060)TON1,912$162.57$106.55
22Incidental HMA surf (40800050)TON347$169.00$200.00
23Welded wire reinf (42000060)SY535$0.01$10.00
24PC conc sidewalk 5 (42400200)SF1,267$14.50$13.50
25Detectable warnings (42400800)SF90$48.00$40.00
26HMA surf rem 2 (44000157)SY17,092$4.98$4.72
27Comb curb gutter rem (44000500)LF250$14.30$50.00
28Sidewalk rem (44000600)SF1,142$8.30$5.00
29CL B patch T2 9 (44200956)SY802$210.00$150.00
30CL B patch T3 9 (44200962)SY201$210.00$150.00
31CL B patch T4 9 (44200964)SY334$210.00$150.00
32Dowel bars 1 1/4 (44201298)EACH460$35.00$75.00
33Saw cuts (44213200)LF3,342$8.50$20.00
34Tie bars 3/4 (44213204)EACH117$30.00$70.00
35JT CR RT PCC pav/SHLD (45200100)LF8,000$2.38$2.38
36Man adjust (60255500)EACH18$1,900.00$500.00
37Inlets adjust (60260100)EACH1$2,050.00$500.00
38Comb CC&G TY B-6.24 (60605000)LF250$80.00$77.00
39Non SPL waste disposl (66900200)CY11$166.00$220.00
40Soil disposal analy (66900530)EACH2$1,200.00$1,200.00
41Reg sub P-const plan (66901001)LS1$3,000.00$3,000.00
42Reg sub F con report (66901003)LS1$900.00$900.00
43Reg sub mon (66901006)CAL DAY3$880.00$1,880.00
44Engr field office A (67000400)CAL MO5$3,200.00$500.00
45Mobilization (67100100)LS1$80,000$364,836
46Traf cont-prot 701421 (70100310)LS1$14,000$8,000.00
47TR cont & prot 701501 (70102620)LS1$12,800$1,000.00
48TR cont & prot 701502 (70102622)LS1$1.00$1,000.00
49TR cont & prot 701601 (70102630)LS1$12,000$8,000.00
50TR cont & prot 701701 (70102635)LS1$1.00$12,000
51TR cont & prot 701801 (70102640)LS1$1.00$8,000.00
52TR cont surveillance (70103815)CAL DAY25$350.00$800.00
53Changeable message SN (70107025)CAL DAY69$40.00$35.00
54Short term pavt mking (70300100)LF1,791$1.00$2.00
55SHRT TRM pavt MK rem (70300150)SF226$5.00$5.00
56Sign panel T1 (72000100)SF209.40$28.00$30.00
57Sign panel T2 (72000200)SF103.30$35.00$40.00
58Remov sign panel T1 (72400310)SF212$11.80$10.00
59Remov sign panel T2 (72400320)SF103.30$10.00$12.00
60Reloc sign panel T1 (72400710)SF50.60$12.00$35.00
61Teles STL sin support (72800100)LF121$23.00$20.00
62Wood sin support (73000100)LF189$44.00$23.00
63Mod ureth PM LTR-sym (78009000)SF312$5.00$7.00
64Mod ureth PM line 4 (78009004)LF9,911$1.43$0.79
65Mod ureth PM line 6 (78009006)LF464$2.22$1.18
66Mod ureth PM line 8 (78009008)LF1,825$2.96$1.75
67Mod ureth PM line 12 (78009012)LF599$4.43$3.50
68Mod ureth PM line 24 (78009024)LF399$8.87$7.00
69GRV RCSD PM LTR & sym (78011000)SF336$2.00$7.00
70GRV RCSD PVT MRKG 5 (78011025)LF4,130$0.37$0.64
71GRV RCSD PVT MRKG 7 (78011035)LF271$0.56$1.28
72GRV RCSD PVT MRKG 9 (78011045)LF1,369$0.74$1.28
73GRV RCSD PVT MRKG 13 (78011065)LF649$1.11$3.60
74GRV RCSD PVT MRKG 25 (78011125)LF831$2.22$7.00
75Raised refl pavt MKR (78100100)EACH84$118.35$76.00
76Raised ref PVT MK rem (78300200)EACH84$20.00$30.00
77Undrgrd C CNC 2 1/2 (81028760)LF52$6.12$6.12
78Undrgrd C CNC 3 (81028770)LF21$9.26$9.26
79Handhole PCC (81400700)EACH1$3,062.50$3,062.50
80Main EX TR sig instal (85000200)EACH1$4,860.00$4,860.00
81Fac T4 cab (85700200)EACH1$21,930$21,930
82Elcbl C signal 14 2C (87301215)LF159$2.46$2.46
83Elcbl C signal 14 3C (87301225)LF53$3.06$3.06
84Elcbl C signal 14 5C (87301245)LF374$4.26$4.26
85TS post galvs 8 (87502420)EACH2$2,466.00$2,466.00
86Conc FDN TY A (87800100)LF3$918.00$918.00
87Drill EX handhole (87900200)EACH3$978.75$978.75
88SH LED 1F 3S mam (88030020)EACH1$1,062.00$1,062.00
89SH LED 1F 4S BM (88030070)EACH2$1,138.00$1,138.00
90SH LED 1F 4S mam (88030080)EACH2$1,239.60$1,239.60
91Ped SH P LED 1F BM CT (88102825)EACH4$828.00$828.00
92Ped SH P LED 2F BM CT (88102845)EACH1$1,176.00$1,176.00
93Ped push-button (88800100)EACH3$1,467.75$1,467.75
94Remov EX TS equip (89502375)EACH1$1,380.00$1,380.00
95Remov EX handhole (89502380)EACH1$830.00$830.00
IDOT contract 64P28: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy