IDOT contract 66P68 bid tabulation
Section (20)RS-7. Let by Illinois DOT on April 24, 2026, Iroquois, District 03. 1 bid received; low bid $2,884,241 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 89
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $2,884,241 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation |
|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $6,500.00 |
| 2 | Clean EX end section (X0325893) | EACH | 8 | $950.00 |
| 3 | Reattach end section (X0326341) | EACH | 1 | $3,500.00 |
| 4 | HMA surf rem var DP (X4401198) | SY | 986 | $0.01 |
| 5 | Rem conc end sec (X5010523) | EACH | 2 | $1,700.00 |
| 6 | Water valves adj SPL (X5619210) | EACH | 4 | $2,250.00 |
| 7 | Man adjust SPL (X6025600) | EACH | 2 | $2,700.00 |
| 8 | FR & grates adjust SP (X6030205) | EACH | 1 | $3,850.00 |
| 9 | Fill exist culverts (X6050208) | CY | 2 | $12,000 |
| 10 | Linear delin panels 4 (X6350204) | EACH | 14 | $106.00 |
| 11 | Temp info signing (X7200061) | SF | 42 | $40.00 |
| 12 | Conc curb repair (Z0012500) | LF | 24 | $100.00 |
| 13 | Debris removal (Z0015550) | CY | 3 | $625.00 |
| 14 | RR prot liability ins (Z0048665) | LS | 1 | $5,500.00 |
| 15 | Trainees (Z0076600) | HR | 1,000 | $0.80 |
| 16 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 |
| 17 | Earth excavation (20200100) | CY | 495 | $0.01 |
| 18 | Furnished excavation (20400800) | CY | 25 | $125.00 |
| 19 | Trench backfill (20800150) | CY | 5 | $100.00 |
| 20 | Grading & shap ditch (21400100) | LF | 4,400 | $23.50 |
| 21 | Seeding CL 2A (25000210) | ACRE | 1 | $2,100.00 |
| 22 | Nitrogen fert nutr (25000400) | LB | 55 | $8.50 |
| 23 | Phosphorus fert nutr (25000500) | LB | 55 | $8.50 |
| 24 | Potassium fert nutr (25000600) | LB | 55 | $8.50 |
| 25 | Erosion contr blanket (25100630) | SY | 2,933 | $2.35 |
| 26 | Sub gran mat B 4 (31101200) | SY | 20 | $75.00 |
| 27 | Agg base cse B 4 (35101600) | SY | 124 | $44.00 |
| 28 | Agg surf course TY B (40200800) | TON | 50 | $85.00 |
| 29 | Bit matls tack CT (40600290) | LB | 52,412 | $1.25 |
| 30 | Long joint sealant (40600370) | LF | 31,555 | $3.15 |
| 31 | Mix CR JTS flangewys (40600400) | TON | 31.50 | $0.01 |
| 32 | Matl transfer device (40600405) | TON | 8,790 | $17.00 |
| 33 | HMA BC HM N70 (40600901) | TON | 41 | $0.01 |
| 34 | Temporary ramp (40600990) | SY | 1,413 | $0.01 |
| 35 | HMA BC IL-9.5 N70 (40602985) | TON | 238 | $215.00 |
| 36 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,560 | $118.00 |
| 37 | HMA SC IL-9.5 D N90 (40604064) | TON | 4,398 | $118.00 |
| 38 | Incidental HMA surf (40800050) | TON | 556 | $245.00 |
| 39 | PC conc sidewalk 4 (42400100) | SF | 1,096 | $39.75 |
| 40 | Detectable warnings (42400800) | SF | 180 | $23.00 |
| 41 | HMA surf rem 1 1/2 (44000155) | SY | 114,783 | $3.35 |
| 42 | HMA surf rem 6 (44000173) | SY | 34 | $84.00 |
| 43 | Comb curb gutter rem (44000500) | LF | 58 | $48.50 |
| 44 | Sidewalk rem (44000600) | SF | 1,054 | $16.00 |
| 45 | CL D patch T2 6 (44201717) | SY | 12 | $445.00 |
| 46 | CL D patch T4 6 (44201723) | SY | 58 | $265.00 |
| 47 | Saw cuts (44213200) | LF | 82 | $20.00 |
| 48 | Agg wedge SHLD type B (48102100) | TON | 765 | $46.50 |
| 49 | HMA shoulders 1 1/2 (48203003) | SY | 1,803 | $15.75 |
| 50 | Pipe culvert remov (50105220) | LF | 44 | $133.00 |
| 51 | P cul CL A 1 eqrs 24 (542A5479) | LF | 38 | $305.00 |
| 52 | PRCF end S EL eqrs 24 (54214719) | EACH | 2 | $3,600.00 |
| 53 | Insert cul lin 18 (54390140) | LF | 41 | $1,100.00 |
| 54 | Inlets reconst (60262700) | EACH | 1 | $2,800.00 |
| 55 | Comb CC&G TY B-6.24 (60605000) | LF | 117 | $145.00 |
| 56 | Box cul to BE cleaned (60905305) | LF | 256 | $41.25 |
| 57 | Pipe culv cleaned 18 (60920018) | LF | 84 | $41.25 |
| 58 | Delineators (63500105) | EACH | 230 | $74.00 |
| 59 | Perm surv MKRS T1 (66700205) | EACH | 20 | $380.00 |
| 60 | Non SPL waste disposl (66900200) | CY | 84 | $150.00 |
| 61 | Soil disposal analy (66900530) | EACH | 3 | $1,475.00 |
| 62 | Reg sub P-const plan (66901001) | LS | 1 | $2,325.00 |
| 63 | Reg sub F con report (66901003) | LS | 1 | $2,325.00 |
| 64 | Reg sub mon (66901006) | CAL DAY | 5 | $1,475.00 |
| 65 | Engr field office A (67000400) | CAL MO | 5 | $0.01 |
| 66 | Mobilization (67100100) | LS | 1 | $167,750 |
| 67 | Traf cont-prot 701201 (70100450) | LS | 1 | $21,525 |
| 68 | Traf cont-prot 701206 (70100455) | LS | 1 | $500.00 |
| 69 | Traf cont-prot 701306 (70100460) | LS | 1 | $21,525 |
| 70 | TR cont & prot 701501 (70102620) | LS | 1 | $21,525 |
| 71 | TR cont & prot 701801 (70102640) | LS | 1 | $21,525 |
| 72 | Short term pavt mking (70300100) | LF | 4,851 | $0.01 |
| 73 | SHRT TRM pavt MK rem (70300150) | SF | 1,918 | $0.01 |
| 74 | THPL PVT MK line 12 (78000600) | LF | 90 | $5.30 |
| 75 | Pref PL PM TD STD LTR/sym (78004600) | SF | 122 | $60.25 |
| 76 | Pref PL PM TD STD L 6 (78004630) | LF | 151 | $10.50 |
| 77 | Pref PL PM TD STD L24 (78004720) | LF | 220 | $42.25 |
| 78 | Mod ureth PM line 4 (78009004) | LF | 127,489 | $0.65 |
| 79 | Mod ureth PM line 6 (78009006) | LF | 15,215 | $1.05 |
| 80 | Mod ureth PM line 8 (78009008) | LF | 1,024 | $2.10 |
| 81 | Mod ureth PM line 12 (78009012) | LF | 548 | $3.20 |
| 82 | GRV RCSD PM LTR & sym (78011000) | SF | 122 | $12.70 |
| 83 | GRV RCSD PVT MRKG 7 (78011035) | LF | 151 | $3.70 |
| 84 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,024 | $1.60 |
| 85 | GRV RCSD PVT MRKG 25 (78011125) | LF | 220 | $12.70 |
| 86 | Raised refl pavt MKR (78100100) | EACH | 401 | $57.00 |
| 87 | Grdrail ref type B (78200006) | EACH | 14 | $22.00 |
| 88 | Curb reflectors (78200020) | EACH | 30 | $31.75 |
| 89 | Raised ref PVT MK rem (78300200) | EACH | 401 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.