| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stark Excavating, Inc. | $15,389,316 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stark Excavating, Inc. |
|---|---|---|---|---|
| 1 | T-lirioden tul 2 (A2005416) | EACH | 7 | $760.00 |
| 2 | Survey marker T2 SPL (XZ193400) | EACH | 9 | $700.00 |
| 3 | Temporary fence SPL (X2011000) | LF | 1,700 | $8.50 |
| 4 | Temp access- priv ent (X4021000) | EACH | 49 | $6,400.00 |
| 5 | Temp access- com ent (X4022000) | EACH | 24 | $8,850.00 |
| 6 | Pipe handrail SPL (X5091765) | LF | 33 | $475.00 |
| 7 | Pro SS conn to EX SS (X5510012) | EACH | 48 | $2,925.00 |
| 8 | Inlets TA W/SPL F&G (X6023508) | EACH | 1 | $3,000.00 |
| 9 | Man adj F&G SPL (X6025602) | EACH | 6 | $3,150.00 |
| 10 | Man adj new T1F CL SP (X6025800) | EACH | 31 | $3,150.00 |
| 11 | Fence removal (X6640104) | LF | 131 | $50.00 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $290,000 |
| 13 | Temp info signing (X7200061) | SF | 63 | $57.00 |
| 14 | Width restrict sign (X7200201) | LS | 1 | $5,000.00 |
| 15 | Paint new ped P-B PST (X8510204) | EACH | 4 | $400.00 |
| 16 | Fac T4 cab SPL (X8570226) | EACH | 1 | $34,000 |
| 17 | FO CBL CDT 12F SGL MD (X8710013) | LF | 2,552 | $24.00 |
| 18 | Ethernet switch (X8710103) | EACH | 1 | $2,600.00 |
| 19 | Accessible ped signal (X8760200) | EACH | 8 | $2,500.00 |
| 20 | Evp system (X8870300) | EACH | 1 | $16,000 |
| 21 | Video veh det sys (X8891001) | EACH | 1 | $30,000 |
| 22 | Concrete steps (Z0012450) | CY | 12.80 | $3,800.00 |
| 23 | Conc step remov (Z0012455) | EACH | 40 | $310.00 |
| 24 | Construction layout (Z0013798) | LS | 1 | $221,500 |
| 25 | Storm sew WM req 12 (Z0056608) | LF | 261 | $186.00 |
| 26 | Conc retain wall rem (Z0075496) | LF | 92 | $80.00 |
| 27 | Trainees (Z0076600) | HR | 2,500 | $0.80 |
| 28 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 |
| 29 | Tree remov 6-15 (20100110) | UNIT | 35 | $51.00 |
| 30 | Tree remov over 15 (20100210) | UNIT | 142 | $73.00 |
| 31 | Tree trunk protection (20101100) | EACH | 4 | $1,750.00 |
| 32 | Earth excavation (20200100) | CY | 9,649 | $78.00 |
| 33 | Rem & disp uns matl (20201200) | CY | 100 | $85.00 |
| 34 | Trench backfill (20800150) | CY | 100 | $35.00 |
| 35 | Seeding CL 7 (25000350) | ACRE | 2.50 | $800.00 |
| 36 | Nitrogen fert nutr (25000400) | LB | 155 | $3.00 |
| 37 | Phosphorus fert nutr (25000500) | LB | 155 | $3.00 |
| 38 | Potassium fert nutr (25000600) | LB | 155 | $3.00 |
| 39 | Mulch method 2 (25100115) | ACRE | 2.50 | $2,000.00 |
| 40 | Sodding salt tolerant (25200110) | SY | 11,493 | $30.00 |
| 41 | Supple watering (25200200) | UNIT | 77.90 | $155.00 |
| 42 | Temp eros contr seed (28000250) | LB | 2,250 | $2.00 |
| 43 | Perimeter eros bar (28000400) | LF | 3,601 | $4.00 |
| 44 | Inlet filters (28000510) | EACH | 58 | $475.00 |
| 45 | Agg subgrade improve (30300001) | CY | 100 | $120.00 |
| 46 | Agg subgrade impr 12 (30300112) | SY | 31,972 | $45.00 |
| 47 | Agg surf cse A 8 (40200700) | SY | 19 | $140.00 |
| 48 | PCC PVT 9 jointed (42000401) | SY | 26,992 | $195.50 |
| 49 | Protective coat (42001300) | SY | 36,943 | $0.01 |
| 50 | PCC driveway pavt 6 (42300200) | SY | 1,011 | $192.00 |
| 51 | PCC driveway pavt 8 (42300400) | SY | 753 | $195.00 |
| 52 | PC conc sidewalk 5 (42400200) | SF | 30,875 | $21.00 |
| 53 | Detectable warnings (42400800) | SF | 841 | $45.00 |
| 54 | Pavement rem (44000100) | SY | 29,186 | $22.00 |
| 55 | Drive pavement rem (44000200) | SY | 1,689 | $16.00 |
| 56 | Curb rem (44000300) | LF | 1,166 | $2.25 |
| 57 | Comb curb gutter rem (44000500) | LF | 12,508 | $9.50 |
| 58 | Sidewalk rem (44000600) | SF | 22,726 | $1.25 |
| 59 | Structure excavation (50200100) | CY | 53 | $135.00 |
| 60 | Reinforcement bars (50800105) | LB | 4,310 | $7.00 |
| 61 | Conc STR retain wall (52200900) | CY | 59.60 | $5,200.00 |
| 62 | Storm sew CL A 1 12 (550A0050) | LF | 273 | $230.00 |
| 63 | Storm sew CL A 1 15 (550A0070) | LF | 4 | $316.00 |
| 64 | Storm sew CL A 2 12 (550A0340) | LF | 44 | $288.00 |
| 65 | Storm sew CL A 2 15 (550A0360) | LF | 12 | $320.00 |
| 66 | Storm sewer rem 12 (55100500) | LF | 209 | $309.00 |
| 67 | Storm sewer rem 15 (55100700) | LF | 8 | $400.00 |
| 68 | Dom wat ser box adj (56500600) | EACH | 6 | $540.00 |
| 69 | Granular backfill STR (58600101) | CY | 50 | $130.00 |
| 70 | Geocomposite wall DR (59100100) | SY | 53 | $240.00 |
| 71 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $7,700.00 |
| 72 | Man TA 4 dia T3F&G (60218500) | EACH | 1 | $10,500 |
| 73 | Inlets TA T3F&G (60235700) | EACH | 36 | $3,500.00 |
| 74 | Inlets TA T8G (60236200) | EACH | 1 | $3,150.00 |
| 75 | Inlets TA T9F&G (60236600) | EACH | 1 | $3,600.00 |
| 76 | Inlets TB T1F CL (60240215) | EACH | 3 | $4,500.00 |
| 77 | Inlets TB T3F&G (60240220) | EACH | 15 | $4,000.00 |
| 78 | Inlets TB T9F&G (60240303) | EACH | 3 | $4,000.00 |
| 79 | Man adjust (60255500) | EACH | 8 | $2,100.00 |
| 80 | Inlets adjust (60260100) | EACH | 2 | $2,100.00 |
| 81 | Valve box adj (60266600) | EACH | 45 | $825.00 |
| 82 | Remov inlets (60500060) | EACH | 44 | $1,275.00 |
| 83 | Comb CC&G TY B-6.24 (60605000) | LF | 14,266 | $80.00 |
| 84 | Non SPL waste disposl (66900200) | CY | 608 | $98.00 |
| 85 | Soil disposal analy (66900530) | EACH | 4 | $1,000.00 |
| 86 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 |
| 87 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 |
| 88 | Reg sub mon (66901006) | CAL DAY | 43 | $1,000.00 |
| 89 | Engr field office B (67000500) | CAL MO | 17 | $2,800.00 |
| 90 | Mobilization (67100100) | LS | 1 | $922,819 |
| 91 | TR cont surveillance (70103815) | CAL DAY | 457 | $0.01 |
| 92 | Changeable message SN (70107025) | CAL DAY | 133 | $180.00 |
| 93 | Short term pavt mking (70300100) | LF | 660 | $7.00 |
| 94 | SHRT TRM pavt MK rem (70300150) | SF | 220 | $7.00 |
| 95 | Temp PVT MK LTR & sym paint (70300211) | SF | 921 | $7.00 |
| 96 | Temp PVT MK line 6 - paint (70300241) | LF | 23,803 | $1.00 |
| 97 | Temp PVT MK line 12 - paint (70300261) | LF | 2,513 | $4.00 |
| 98 | Temp PVT MK line 24 - paint (70300281) | LF | 352 | $7.00 |
| 99 | Sign panel T1 (72000100) | SF | 359 | $45.00 |
| 100 | Teles STL sin support (72800100) | LF | 643 | $40.00 |
| 101 | Polyurea PM T2 LTR-SY (78008300) | SF | 921 | $9.50 |
| 102 | Polyurea PM T2 LN 6 (78008330) | LF | 11,374 | $2.50 |
| 103 | Polyurea PM T2 LN 12 (78008350) | LF | 2,513 | $5.00 |
| 104 | Polyurea PM T2 LN 24 (78008370) | LF | 352 | $9.50 |
| 105 | GRV RCSD PM LTR & sym (78011000) | SF | 921 | $5.25 |
| 106 | GRV RCSD PVT MRKG 7 (78011035) | LF | 11,314 | $1.00 |
| 107 | GRV RCSD PVT MRKG 13 (78011065) | LF | 2,513 | $3.00 |
| 108 | GRV RCSD PVT MRKG 25 (78011125) | LF | 352 | $5.25 |
| 109 | Raised refl pavt MKR (78100100) | EACH | 142 | $90.00 |
| 110 | PVT MKG rem WTR blast (78300202) | SF | 16,038 | $1.25 |
| 111 | Undrgrd C PVC 2 (81028350) | LF | 2,662 | $40.00 |
| 112 | Undrgrd C PVC 2 1/2 (81028360) | LF | 32 | $72.00 |
| 113 | Undrgrd C PVC 3 (81028370) | LF | 27 | $92.00 |
| 114 | Undrgrd C PVC 4 (81028390) | LF | 255 | $100.00 |
| 115 | Handhole (81400100) | EACH | 8 | $7,700.00 |
| 116 | DBL handhole (81400300) | EACH | 1 | $10,400 |
| 117 | Main EX TR sig instal (85000200) | EACH | 1 | $3,500.00 |
| 118 | PT new traf sig post (85100500) | EACH | 4 | $1,700.00 |
| 119 | PT new MA&P < 40FT (85100600) | EACH | 1 | $4,600.00 |
| 120 | PT new MA&P >=40FT (85100701) | EACH | 2 | $6,600.00 |
| 121 | Uninter power sup STD (86200200) | EACH | 1 | $11,200 |
| 122 | Elcbl C tracer 14 1C (87300925) | LF | 2,520 | $5.00 |
| 123 | Elcbl C signal 14 2C (87301215) | LF | 1,097 | $5.00 |
| 124 | Elcbl C signal 14 3C (87301225) | LF | 1,140 | $5.50 |
| 125 | Elcbl C signal 14 5C (87301245) | LF | 1,748 | $5.50 |
| 126 | Elcbl C signal 14 7C (87301255) | LF | 231 | $6.00 |
| 127 | Elcbl C serv 6 2C (87301805) | LF | 205 | $27.00 |
| 128 | Elcbl C egrdc 6 1C (87301900) | LF | 571 | $5.75 |
| 129 | TS post A 10 (87502640) | EACH | 1 | $1,600.00 |
| 130 | TS post A 14 (87502680) | EACH | 2 | $2,700.00 |
| 131 | TS post A 16 (87502700) | EACH | 1 | $4,000.00 |
| 132 | S maa & P 26 (87700170) | EACH | 1 | $17,400 |
| 133 | S maa & P 46 (87700270) | EACH | 1 | $26,000 |
| 134 | S maa & P 50 (87700290) | EACH | 1 | $31,000 |
| 135 | Conc FDN TY A (87800100) | LF | 15 | $650.00 |
| 136 | Conc FDN TY C (87800150) | LF | 3 | $950.00 |
| 137 | Conc FDN TY E 30D (87800400) | LF | 10 | $1,600.00 |
| 138 | Conc FDN TY E 36D (87800415) | LF | 70 | $2,000.00 |
| 139 | Drill EX handhole (87900200) | EACH | 1 | $1,300.00 |
| 140 | SH P LED 1F 3S BM (88040070) | EACH | 6 | $1,700.00 |
| 141 | SH P LED 1F 3S mam (88040090) | EACH | 6 | $1,900.00 |
| 142 | SH P LED 1F 4S BM (88040110) | EACH | 1 | $1,900.00 |
| 143 | SH P LED 1F 4S mam (88040120) | EACH | 1 | $2,100.00 |
| 144 | Ped SH P LED 1F BM CT (88102825) | EACH | 8 | $1,700.00 |
| 145 | TS backplate (88200100) | EACH | 14 | $300.00 |
| 146 | Mod EX contr (89502200) | EACH | 1 | $3,100.00 |
| 147 | Remov EX TS equip (89502375) | EACH | 1 | $10,400 |
| 148 | Remov EX handhole (89502380) | EACH | 3 | $1,900.00 |
| 149 | Remov EX conc FDN (89502385) | EACH | 7 | $1,900.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.