IDOT contract 72747 bid tabulation
Section (2BR)BDR,BJR. Let by Illinois DOT on January 17, 2025, Pike, District 06. 2 bids received; low bid $272,212 by County Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 20
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | County Contractors, Inc. | $272,212 | Low |
| 2 | Freesen, a div of UCM, Inc. | $331,956 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. County Contractors, Inc. | 2. Freesen, a div of UCM, Inc. |
|---|---|---|---|---|---|
| 1 | Width restrict sign (X7200201) | LS | 1 | $2,450.00 | $2,730.00 |
| 2 | Appr slab repair (PD) (Z0001800) | SY | 13 | $620.00 | $1,050.33 |
| 3 | Deck slab rep (FD-T1) (Z0016001) | SY | 5 | $1,500.00 | $1,677.97 |
| 4 | Deck slab rep (part) (Z0016200) | SY | 127 | $620.00 | $643.79 |
| 5 | Silicone JT seal 2 (Z0021908) | LF | 82 | $52.00 | $167.15 |
| 6 | JT sealing (patches) (Z0032500) | LF | 1,800 | $6.00 | $4.13 |
| 7 | Polymer concrete (Z0041895) | CF | 14 | $920.00 | $1,583.22 |
| 8 | Earth exc wid (20200500) | CY | 55 | $90.00 | $326.67 |
| 9 | Base cse widening 8 (35650300) | SY | 307 | $204.00 | $145.90 |
| 10 | Paved SHLD removal (44004250) | SY | 62 | $55.00 | $122.04 |
| 11 | Agg wedge SHLD type B (48102100) | TON | 15 | $85.00 | $409.80 |
| 12 | Conc rem (50102400) | CY | 0.10 | $37,500 | $85,471 |
| 13 | Protective coat (50300300) | SY | 145 | $16.00 | $17.29 |
| 14 | Mobilization (67100100) | LS | 1 | $14,500 | $22,913 |
| 15 | Traf cont-prot 701316 (70100100) | EACH | 1 | $12,500 | $15,073 |
| 16 | Traf cont-prot 701326 (70100500) | LS | 1 | $2,000.00 | $1,260.00 |
| 17 | Temp BR traf signals (70106500) | EACH | 1 | $25,000 | $28,350 |
| 18 | Temp rumble strips (70106700) | EACH | 6 | $1,100.00 | $735.00 |
| 19 | Mod ureth PM line 5 (78009005) | LF | 1,600 | $4.25 | $9.98 |
| 20 | PVT MKG rem grinding (78300201) | SF | 420 | $4.25 | $15.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.