IDOT contract 72M33 bid tabulation

Section (75-4B-1)BDR,BJR,I. Let by Illinois DOT on September 19, 2025, Pike, District 06. 2 bids received; low bid $2,292,624 by Freesen, a div of UCM, Inc..

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
66
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Freesen, a div of UCM, Inc.$2,292,624Low
2County Contractors, Inc.$2,752,957+20%
IDOT contract 72M33: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Freesen, a div of UCM, Inc.2. County Contractors, Inc.
1Riprap slurry (X2810848)SY708$69.08$82.00
2PCC BR appr SH PVT SP (X4201510)SY34$300.71$165.00
3BR deck grooving long (X5030250)SY1,020$12.53$19.50
4Structural STL removl (X5051204)LB7,730$3.29$3.85
5C&D N-lead PT C RS N1 (X5060601)LS1$17,831$17,920
6C&D N-lead PT C RS N2 (X5060602)LS1$17,831$17,920
7Pipe drain removal (X6010003)LF75$45.60$17.75
8Guardrail remov SPL (X6320100)LF650$8.76$14.85
9Width restrict sign (X7200201)LS1$3,360.00$3,375.00
10BR approach SHLD rem (Z0001495)SY122$113.05$79.00
11Appr slab repair (PD) (Z0001800)SY20$822.01$735.00
12Jack & rem EX bearing (Z0001899)EACH24$1,660.49$2,325.00
13Clean & PT STL BR N1 (Z0010501)LS1$160,335$161,130
14Clean & PT STL BR N2 (Z0010502)LS1$160,335$161,130
15BR deck scar 3/4 (Z0012130)SY1,640$61.13$83.00
16BR DK mic C ovl 2 3/4 (Z0012166)SY1,640$157.97$165.00
17STR rep con DP = < 5 (Z0012754)SF65$267.86$285.00
18Deck slab rep (FD-T2) (Z0016002)SY10$1,851.02$1,625.00
19Diamond grind BR sec (Z0029090)SY1,576$14.44$24.00
20Trainees (Z0076600)HR1,000$0.80$0.80
21Trainees TPG (Z0076604)HR1,000$15.00$15.00
22Earth excavation (20200100)CY519$92.62$55.00
23Channel excavation (20300100)CY1,157$18.14$56.00
24Stone riprap CL A4 (28100207)TON15$190.77$190.00
25Stone riprap CL A5 (28100209)TON913$88.52$140.00
26Filter fabric (28200200)SY1,105$3.62$5.60
27Sub gran mat C 6 (31102300)SY2,336$25.10$25.00
28HMA base cse 10 (35501324)SY1,973$103.02$105.00
29Bit matls tack CT (40600290)LB955$4.36$4.25
30HMA surf rem butt JT (40600982)SY1,244$13.20$12.00
31Temporary ramp (40600990)SY360$17.21$45.00
32P HMA SC IL-9.5 D N70 (40604162)TON285$301.43$272.00
33Comb curb gutter rem (44000500)LF110$36.05$28.00
34Paved SHLD removal (44004250)SY2,336$22.83$31.00
35Agg wedge SHLD type B (48102100)TON34$72.42$95.00
36Conc rem (50102400)CY33.60$2,559.30$3,750.00
37Conc sup-STR (50300255)CY41.40$2,684.44$3,700.00
38Protective coat (50300300)SY1,733$4.65$6.50
39F & E struct steel (50500405)LB10,180$7.98$11.75
40Reinf bars, epoxy CTD (50800205)LB5,500$3.48$3.00
41Bar splicers (50800515)EACH64$51.93$55.00
42Pref JT strip seal (52000110)LF204$242.06$320.00
43Elast bearing assy T2 (52100020)EACH12$2,920.90$1,830.00
44Anchor bolts 1 (52100520)EACH48$174.81$85.00
45Pipe drains 12 (60100945)LF75$76.88$44.00
46Remov inlets (60500060)EACH2$677.91$950.00
47Conc curb TB (60600605)LF60$102.19$85.00
48TY F inlet box 610001 (61000225)EACH2$4,750.61$7,850.00
49SPBGR TY A 6FT posts (63000001)LF500$33.55$33.75
50Traf bar term T6 (63100085)EACH4$4,362.75$4,385.00
51Shoulder rum strip 16 (64200116)LF2,316$6.33$4.85
52Engr field office A (67000400)CAL MO12$4,046.04$2,750.00
53Mobilization (67100100)LS1$69,013$160,000
54Traf cont-prot 701402 (70100207)EACH2$21,449$51,800
55Traf cont-prot 701401 (70100800)LS1$11,760$24,500
56Changeable message SN (70107025)CAL DAY14$78.75$80.00
57Short term pavt mking (70300100)LF527$1.58$2.00
58SHRT TRM pavt MK rem (70300150)SF180$2.58$6.00
59Temp conc barrier (70400100)LF930$46.33$37.00
60Rel temp conc barrier (70400200)LF930$4.08$10.00
61Imp attn temp FRN TL3 (70600260)EACH2$6,941.16$9,850.00
62Imp attn rel FRN TL3 (70600332)EACH2$1,710.21$2,270.00
63Mod ureth PM line 6 (78009006)LF3,943$2.89$2.90
64Grdrail ref type A (78200005)EACH26$10.50$10.50
65Raised ref PVT MK rem (78300200)EACH18$28.75$28.00
66PVT MKG rem WTR blast (78300202)SF1,138$6.30$6.30
IDOT contract 72M33: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy