IDOT contract 76U95 bid tabulation
Section (130-1,130-2)RS-4. Let by Illinois DOT on January 16, 2026, St.Clair, District 08. 2 bids received; low bid $3,475,296 by The Kilian Corporation.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 52
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | The Kilian Corporation | $3,475,296 | Low |
| 2 | Christ Bros. Asphalt, Inc. | $3,699,860 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Kilian Corporation | 2. Christ Bros. Asphalt, Inc. |
|---|---|---|---|---|---|
| 1 | Conc median remov (X4403300) | SF | 75 | $15.00 | $20.00 |
| 2 | Det loop repl (X8860105) | LF | 7,520 | $26.75 | $31.25 |
| 3 | Paint curb (Z0036200) | LF | 1,261 | $2.25 | $5.00 |
| 4 | Trainees (Z0076600) | HR | 1,500 | $0.80 | $0.80 |
| 5 | Trainees TPG (Z0076604) | HR | 1,500 | $15.00 | $15.00 |
| 6 | Bit matls tack CT (40600290) | LB | 31,690 | $2.25 | $2.22 |
| 7 | Long joint sealant (40600370) | LF | 19,274 | $3.55 | $2.65 |
| 8 | Matl transfer device (40600405) | TON | 7,834 | $7.00 | $7.43 |
| 9 | Temporary ramp (40600990) | SY | 1,154 | $0.01 | $0.01 |
| 10 | P HMA BC IL19.0 N90 (40603240) | TON | 5,786 | $154.00 | $154.94 |
| 11 | P HMA SC IL-9.5 E N90 (40604174) | TON | 3,471 | $174.00 | $154.94 |
| 12 | HMA surf rem 4 (44000165) | SY | 48,547 | $11.25 | $11.35 |
| 13 | Comb curb gutter rem (44000500) | LF | 80 | $41.00 | $30.00 |
| 14 | HMA shoulders (48203100) | TON | 1,209 | $159.00 | $169.69 |
| 15 | Conc HDWL for P drain (60100060) | EACH | 1 | $800.00 | $600.00 |
| 16 | Shoulder rem & repl (60100070) | LF | 480 | $40.00 | $215.90 |
| 17 | Pipe underdrain 4 SP (60108100) | LF | 20 | $158.00 | $50.00 |
| 18 | Pipe underdr T 1 4 (60108104) | LF | 480 | $36.00 | $30.00 |
| 19 | Comb CC&G TM6.06 (60608600) | LF | 80 | $136.00 | $150.00 |
| 20 | Conc med TSB6.06 (60619200) | SF | 75 | $60.00 | $50.00 |
| 21 | SPBGR TY A 9FT posts (63000003) | LF | 650 | $40.95 | $39.00 |
| 22 | Traf bar term T6 (63100085) | EACH | 8 | $4,068.75 | $3,875.00 |
| 23 | TR bar TRM T1 SPL tan (63100167) | EACH | 8 | $3,675.00 | $3,500.00 |
| 24 | Guardrail remov (63200310) | LF | 1,323 | $11.03 | $10.50 |
| 25 | Engr field office A (67000400) | CAL MO | 12 | $3,000.00 | $2,500.00 |
| 26 | Mobilization (67100100) | LS | 1 | $208,000 | $336,295 |
| 27 | Traf cont-prot 701411 (70100420) | EACH | 5 | $4,500.00 | $200.00 |
| 28 | Traf cont-prot 701456 (70100825) | LS | 1 | $7,500.00 | $200.00 |
| 29 | TR cont & prot 701601 (70102630) | LS | 1 | $174,000 | $149,806 |
| 30 | TR cont & prot 701701 (70102635) | LS | 1 | $23,000 | $200.00 |
| 31 | TR cont surveillance (70103815) | CAL DAY | 7 | $750.00 | $750.00 |
| 32 | Changeable message SN (70107025) | CAL DAY | 504 | $50.00 | $63.00 |
| 33 | Night work zone light (70200100) | LS | 1 | $30,000 | $154,000 |
| 34 | Short term pavt mking (70300100) | LF | 3,010 | $3.50 | $3.08 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 1,018 | $6.00 | $0.01 |
| 36 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,070 | $0.01 | $0.01 |
| 37 | Temp PVT MK line 6 - paint (70300241) | LF | 26,285 | $0.01 | $0.01 |
| 38 | Temp PVT MK line 8 - paint (70300251) | LF | 1,086 | $0.01 | $0.01 |
| 39 | Temp PVT MK line 12 - paint (70300261) | LF | 1,228 | $0.01 | $0.01 |
| 40 | Temp PVT MK line 24 - paint (70300281) | LF | 731 | $0.01 | $0.01 |
| 41 | Sign panel T1 (72000100) | SF | 20 | $33.00 | $60.00 |
| 42 | Terminal marker - DA (72501000) | EACH | 8 | $44.00 | $42.00 |
| 43 | THPL PVT MK LTR & sym (78000100) | SF | 1,070 | $16.25 | $15.00 |
| 44 | THPL PVT MK line 6 (78000400) | LF | 26,285 | $1.83 | $1.50 |
| 45 | THPL PVT MK line 8 (78000500) | LF | 1,086 | $3.35 | $10.00 |
| 46 | THPL PVT MK line 12 (78000600) | LF | 1,228 | $7.85 | $10.00 |
| 47 | THPL PVT MK line 24 (78000650) | LF | 731 | $17.10 | $15.00 |
| 48 | Raised refl pavt MKR (78100100) | EACH | 260 | $47.50 | $55.40 |
| 49 | Grdrail ref type A (78200005) | EACH | 17 | $12.50 | $12.00 |
| 50 | Curb reflectors (78200020) | EACH | 342 | $8.30 | $9.50 |
| 51 | Raised ref PVT MK rem (78300200) | EACH | 260 | $0.01 | $0.01 |
| 52 | PVT MKG rem WTR blast (78300202) | SF | 17,592 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.