IDOT contract 78B22 bid tabulation

Section (1-LS)RS-1,PP-1. Let by Illinois DOT on June 13, 2025, Jackson, District 09. 2 bids received; low bid $297,405 by E. T. Simonds Construction Company.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
29
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E. T. Simonds Construction Company$297,405Low
2Samron Midwest Contracting, Inc.$308,868+4.0%
IDOT contract 78B22: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E. T. Simonds Construction Company2. Samron Midwest Contracting, Inc.
1HMA surf rem var DP (X4401198)SY44$29.78$4.50
2Bit matls tack CT (40600290)LB4,762$0.01$0.01
3Long joint sealant (40600370)LF4,506$4.38$4.50
4Matl transfer device (40600405)TON858$3.54$3.00
5HMA surf rem butt JT (40600982)SY155$8.38$10.00
6Temporary ramp (40600990)SY67$41.61$15.00
7HMA SC IL-9.5 C N70 (40604052)TON858$80.99$88.00
8Incidental HMA surf (40800050)TON14$255.97$650.00
9HMA surf rem 1/2 (44000151)SY9,769$1.43$2.00
10HMA surf rem 1 1/2 (44000155)SY564$2.81$1.50
11CL C patch T2 12 (44201377)SY14$206.00$180.00
12CL C patch T3 12 (44201381)SY20$204.00$175.00
13CL C patch T4 12 (44201383)SY568$184.00$170.00
14Agg wedge SHLD type B (48102100)TON85$74.70$35.00
15HMA shoulders (48203100)TON20$232.80$400.00
16Mobilization (67100100)LS1$20,350$18,000
17Traf cont-prot 701421 (70100310)LS1$3,804.73$20,000
18Traf cont-prot 701201 (70100450)LS1$0.01$1,000.00
19Traf cont-prot 701306 (70100460)LS1$7,096.53$8,500.00
20Traf cont-prot 701336 (70100600)LS1$8,070.83$0.01
21TR cont & prot 701701 (70102635)LS1$0.01$1,000.00
22Changeable message SN (70107025)CAL DAY28$37.65$75.00
23Short term pavt mking (70300100)LF1,874$0.01$1.75
24SHRT TRM pavt MK rem (70300150)SF625$0.01$3.00
25Temp PVT MK line 4 - paint (70300221)LF14,404$0.01$0.01
26Paint PVT MK line 4 (78001110)LF14,404$0.47$0.28
27Paint PVT MK line 24 (78001180)LF25$3.91$17.50
28Raised refl pavt MKR (78100100)EACH56$189.57$76.00
29PVT MKG rem grinding (78300201)SF4,852$0.01$0.01
IDOT contract 78B22: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy