IDOT contract 78B53 bid tabulation

Section (5,6,7)RS-5,SW-1,SR-1. Let by Illinois DOT on January 16, 2026, Perry, District 09. 2 bids received; low bid $2,709,114 by E. T. Simonds Construction Company.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
47
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E. T. Simonds Construction Company$2,709,114Low
2Samron Midwest Contracting, Inc.$2,752,043+2.0%
IDOT contract 78B53: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E. T. Simonds Construction Company2. Samron Midwest Contracting, Inc.
1PC conc sidewalk 4 SP (X4240420)SF25$79.32$120.00
2Centerln rum strip 8 (X6420112)LF7,467$1.25$1.10
3Construction layout (Z0013798)LS1$11,521$25,000
4RR prot liability ins (Z0048665)LS1$5,401.20$10,000
5Exc & GR EX shoulder (20200600)UNIT194$463.73$280.00
6Bit matls tack CT (40600290)LB88,812$0.01$0.01
7Long joint sealant (40600370)LF35,660$2.61$2.40
8Matl transfer device (40600405)TON14,862$3.71$1.80
9HMA surf rem butt JT (40600982)SY985$18.59$5.00
10Temporary ramp (40600990)SY814$23.67$15.00
11HMA BC IL-9.5FG N70 (40602970)TON6,452$83.92$88.00
12HMA SC IL-9.5 C N70 (40604052)TON8,385$82.82$91.00
13Incidental HMA surf (40800050)TON69$365.96$575.00
14Protective coat (42001300)SY2$0.01$0.01
15Detectable warnings (42400800)SF8$20.95$25.00
16HMA surf rem 1 1/2 (44000155)SY104,420$1.42$1.75
17HMA surf rem 2 1/2 (44000159)SY46,140$0.01$0.01
18Gutter rem (44000400)LF1,271$17.79$5.00
19Comb curb gutter rem (44000500)LF4$207.10$20.00
20Sidewalk rem (44000600)SF25$33.14$15.00
21Agg wedge SHLD type B (48102100)TON732$57.29$65.00
22HMA shoulders 8 (48203029)SY8,591$37.60$45.00
23HMA shoulders (48203100)TON2,752$86.84$90.00
24Comb CC&G TB6.12 (60603800)LF4$439.13$30.00
25Shoulder rum strip 8 (64200108)LF59,415$0.19$0.19
26Engr field office A (67000400)CAL MO5$2,100.00$1,600.00
27Mobilization (67100100)LS1$212,753$164,000
28Traf cont-prot 701306 (70100460)LS1$60,374$25,000
29Traf cont-prot 701326 (70100500)LS1$15,094$5,500.00
30Traf cont-prot 701336 (70100600)LS1$0.01$0.01
31TR cont & prot 701501 (70102620)LS1$0.01$2,500.00
32TR cont & prot 701801 (70102640)LS1$0.01$0.01
33TR cont surveillance (70103815)CAL DAY5$0.01$0.01
34Changeable message SN (70107025)CAL DAY28$39.28$100.00
35Short term pavt mking (70300100)LF9,439$1.38$1.65
36SHRT TRM pavt MK rem (70300150)SF3,147$0.01$1.20
37Temp PVT MK LTR & sym paint (70300211)SF124$0.01$0.01
38Temp PVT MK line 4 - paint (70300221)LF71,208$0.01$0.01
39Temp PVT MK line 6 - paint (70300241)LF90$0.01$0.01
40Temp PVT MK line 24 - paint (70300281)LF216$0.01$0.01
41THPL PVT MK LTR & sym (78000100)SF124$27.04$26.25
42THPL PVT MK line 6 (78000400)LF90$6.73$6.50
43THPL PVT MK line 24 (78000650)LF216$27.56$26.50
44Paint PVT MK line 4 (78001110)LF71,208$0.12$0.13
45Raised refl pavt MKR (78100100)EACH427$38.48$37.50
46Raised ref PVT MK rem (78300200)EACH425$9.88$10.00
47PVT MKG rem grinding (78300201)SF24,337$0.01$0.01
IDOT contract 78B53: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy