IDOT contract 99718 bid tabulation
Carbondale, section 22-00149-00-PV. Let by Illinois DOT on January 16, 2026, Jackson, District 09. 2 bids received; low bid $1,171,867 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 51
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $1,171,867 | Low |
| 2 | E. T. Simonds Construction Company | $1,383,263 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Potholing (X1700066) | EACH | 50 | $200.00 | $69.83 |
| 2 | HMA surf rem var DP (X4401198) | SY | 1,020 | $15.00 | $14.12 |
| 3 | Pavement patching SPL (X4420201) | SY | 203 | $120.00 | $183.98 |
| 4 | Wov W fence rem & RE (X6650206) | LF | 2,119 | $10.50 | $15.63 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $45,000 | $101,093 |
| 6 | Relocate sign SPL (X7240502) | EACH | 2 | $10,000 | $4,968.18 |
| 7 | Illuminated sign SPL (X8910050) | EACH | 2 | $3,500.00 | $4,699.02 |
| 8 | Construction layout (Z0013798) | LS | 1 | $43,500 | $13,393 |
| 9 | Tree remov over 15 (20100210) | UNIT | 33 | $25.00 | $150.81 |
| 10 | Earth excavation (20200100) | CY | 2,090 | $30.00 | $31.90 |
| 11 | Seeding CL 1A (25000110) | ACRE | 1 | $4,000.00 | $4,357.50 |
| 12 | Nitrogen fert nutr (25000400) | LB | 100 | $1.15 | $1.73 |
| 13 | Phosphorus fert nutr (25000500) | LB | 100 | $1.15 | $1.73 |
| 14 | Potassium fert nutr (25000600) | LB | 100 | $1.15 | $1.73 |
| 15 | Mulch method 2 (25100115) | ACRE | 1 | $1,250.00 | $2,887.50 |
| 16 | Temp eros contr seed (28000250) | LB | 220 | $3.00 | $2.20 |
| 17 | Temp ditch checks (28000305) | LF | 36 | $15.00 | $30.74 |
| 18 | Perimeter eros bar (28000400) | LF | 985 | $4.60 | $6.80 |
| 19 | Inlet & pipe protect (28000500) | EACH | 7 | $125.00 | $201.78 |
| 20 | Stone riprap CL A3 (28100105) | SY | 76 | $45.00 | $28.73 |
| 21 | Stone riprap CL A4 (28100107) | SY | 108 | $46.00 | $46.18 |
| 22 | Filter fabric (28200200) | SY | 184 | $5.00 | $5.88 |
| 23 | Agg base cse A 4 (35100300) | SY | 1,610 | $11.00 | $17.53 |
| 24 | Agg base cse A 12 (35101100) | SY | 1,227 | $34.00 | $40.16 |
| 25 | Bit matls tack CT (40600290) | LB | 4,988 | $0.01 | $3.17 |
| 26 | HMA BC IL-19.0 N70 (40603085) | TON | 2,848 | $82.00 | $84.47 |
| 27 | HMA SC IL-9.5 C N70 (40604052) | TON | 637 | $96.00 | $94.42 |
| 28 | PCC driveway pavt 6 (42300200) | SY | 35 | $160.00 | $138.31 |
| 29 | PCC driveway pavt 8 (42300400) | SY | 143 | $140.00 | $169.22 |
| 30 | Drive pavement rem (44000200) | SY | 108 | $15.00 | $19.92 |
| 31 | HMA shoulders 8 (48203029) | SY | 4,869 | $38.00 | $42.95 |
| 32 | Pipe culvert remov (50105220) | LF | 284 | $5.00 | $15.23 |
| 33 | P cul CL A 1 12 (542A0217) | LF | 48 | $75.00 | $130.68 |
| 34 | P cul CL A 1 24 (542A0229) | LF | 104 | $115.00 | $186.21 |
| 35 | P cul CL A 1 30 (542A0235) | LF | 176 | $125.00 | $180.64 |
| 36 | P cul CL A 1 42 (542A0247) | LF | 96 | $200.00 | $311.11 |
| 37 | PRC flar end sec 12 (54213657) | EACH | 2 | $2,000.00 | $1,970.62 |
| 38 | PRC flar end sec 24 (54213669) | EACH | 4 | $3,650.00 | $3,085.65 |
| 39 | PRC flar end sec 30 (54213675) | EACH | 4 | $3,000.00 | $3,833.04 |
| 40 | PRC flar end sec 42 (54213687) | EACH | 4 | $3,750.00 | $4,592.07 |
| 41 | Water valves adjust (56109210) | EACH | 1 | $350.00 | $55.55 |
| 42 | Class SI conc outlet (60600095) | CY | 39 | $950.00 | $987.69 |
| 43 | Concrete gutter TY A (60602500) | LF | 3,088 | $33.00 | $52.33 |
| 44 | Mobilization (67100100) | LS | 1 | $70,000 | $72,781 |
| 45 | Sign panel T1 (72000100) | SF | 4 | $20.00 | $48.41 |
| 46 | Remov sin pan assy TA (72400100) | EACH | 2 | $150.00 | $211.28 |
| 47 | Reloc sin pan assy TA (72400500) | EACH | 2 | $450.00 | $211.28 |
| 48 | THPL PVT MK line 4 (78000200) | LF | 5,554 | $0.94 | $0.98 |
| 49 | THPL PVT MK line 6 (78000400) | LF | 5,412 | $1.40 | $1.47 |
| 50 | THPL PVT MK line 24 (78000650) | LF | 65 | $5.51 | $5.78 |
| 51 | PVT MKG rem WTR blast (78300202) | SF | 74 | $74.00 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.