IDOT contract 99749 bid tabulation
Project Number: N425-927 / /, section 19-00147-00-BR. Let by Illinois DOT on September 19, 2025, Perry, District 09. 3 bids received; low bid $2,286,217 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 71
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $2,286,217 | Low |
| 2 | C-Hill Civil Contractors, Inc. | $2,399,465 | +5.0% |
| 3 | E. T. Simonds Construction Company | $2,447,572 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. C-Hill Civil Contractors, Inc. | 3. E. T. Simonds Construction Company |
|---|---|---|---|---|---|---|
| 1 | STL railing TY SM SPL (X2300017) | LF | 166 | $243.00 | $259.00 | $257.25 |
| 2 | Seeding CL 2 SPL (X2501000) | ACRE | 10.25 | $4,280.00 | $4,070.00 | $4,068.75 |
| 3 | SPBGR (short radius) (X6330725) | LF | 25 | $46.00 | $44.00 | $63.79 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $12,000 | $54,000 | $47,595 |
| 5 | Construction layout (Z0013798) | LS | 1 | $28,000 | $31,500 | $41,767 |
| 6 | RR prot liability ins (Z0048665) | LS | 1 | $5,600.00 | $10,000 | $5,608.90 |
| 7 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 8 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 9 | Tree remov acres (20100500) | ACRE | 1.25 | $15,000 | $19,300 | $13,497 |
| 10 | Earth excavation (20200100) | CY | 2,605 | $16.50 | $10.80 | $12.96 |
| 11 | Exc & GR EX shoulder (20200600) | UNIT | 211 | $223.00 | $459.00 | $437.08 |
| 12 | Rem & disp uns matl (20201200) | CY | 13 | $22.00 | $40.00 | $106.15 |
| 13 | Channel excavation (20300100) | CY | 760 | $24.00 | $30.00 | $31.92 |
| 14 | Furnished excavation (20400800) | CY | 8,789 | $18.00 | $20.70 | $19.90 |
| 15 | Porous gran embank (20700220) | CY | 90 | $86.00 | $160.00 | $77.57 |
| 16 | Trench backfill (20800150) | CY | 43 | $52.00 | $113.00 | $72.40 |
| 17 | Grading & shap ditch (21400100) | LF | 5,563 | $8.00 | $7.75 | $3.06 |
| 18 | Temp eros contr seed (28000250) | LB | 1,025 | $2.55 | $0.01 | $5.25 |
| 19 | Temp ditch checks (28000305) | LF | 800 | $12.10 | $10.50 | $10.84 |
| 20 | Perimeter eros bar (28000400) | LF | 5,000 | $3.50 | $4.50 | $4.44 |
| 21 | Inlet & pipe protect (28000500) | EACH | 35 | $56.00 | $200.00 | $183.75 |
| 22 | Stone riprap CL A4 (28100207) | TON | 330 | $50.00 | $88.00 | $92.40 |
| 23 | Filter fabric (28200200) | SY | 490 | $2.00 | $3.00 | $3.15 |
| 24 | Agg base cse A 10 (35100900) | SY | 6,570 | $18.00 | $14.50 | $19.49 |
| 25 | Agg surf course TY B (40200800) | TON | 188 | $43.00 | $52.00 | $58.48 |
| 26 | Bit matls PR CT (40600275) | LB | 14,783 | $0.55 | $0.01 | $0.01 |
| 27 | Bit matls tack CT (40600290) | LB | 1,503 | $1.07 | $0.01 | $0.01 |
| 28 | Long joint sealant (40600370) | LF | 2,486 | $8.00 | $8.85 | $8.43 |
| 29 | HMA BC IL-19.0 N70 (40603085) | TON | 1,170 | $93.00 | $98.00 | $93.27 |
| 30 | HMA SC IL-9.5 C N70 (40604052) | TON | 749 | $108.00 | $121.00 | $115.48 |
| 31 | Incidental HMA surf (40800050) | TON | 43 | $401.00 | $338.00 | $322.08 |
| 32 | Pavement rem (44000100) | SY | 4,740 | $6.00 | $10.45 | $9.92 |
| 33 | HMA surf rem 2 (44000157) | SY | 286 | $30.00 | $8.00 | $7.28 |
| 34 | Aggregate SHLDS A 6 (48100500) | SY | 6,071 | $12.42 | $13.80 | $13.14 |
| 35 | HMA shoulders 6 (48203021) | SY | 5,734 | $42.00 | $34.00 | $32.36 |
| 36 | Rem exist struct (50100100) | EACH | 1 | $12,000 | $10,500 | $11,025 |
| 37 | Pipe culvert remov (50105220) | LF | 257 | $0.01 | $36.00 | $21.33 |
| 38 | Structure excavation (50200100) | CY | 70 | $44.00 | $42.00 | $44.10 |
| 39 | Conc struct (50300225) | CY | 42.80 | $900.00 | $925.00 | $971.25 |
| 40 | Concrete encasement (50300280) | CY | 5 | $565.00 | $925.00 | $971.25 |
| 41 | P P conc DK BM 33 DP (50400605) | SF | 2,895 | $139.00 | $127.00 | $127.00 |
| 42 | Reinforcement bars (50800105) | LB | 22,350 | $1.50 | $1.65 | $2.04 |
| 43 | Fur STL pile HP10X42 (51201400) | LF | 336 | $40.00 | $37.00 | $38.85 |
| 44 | Driving piles (51202305) | LF | 336 | $0.01 | $0.01 | $0.01 |
| 45 | Test pile ST HP10X42 (51203400) | EACH | 2 | $10,000 | $12,500 | $13,125 |
| 46 | Pile shoes (51204650) | EACH | 14 | $127.00 | $127.00 | $133.35 |
| 47 | Name plates (51500100) | EACH | 1 | $1,500.00 | $900.00 | $945.00 |
| 48 | Expan bolts 3/4 (54002020) | EACH | 56 | $17.00 | $67.00 | $35.21 |
| 49 | Conc box cul (54003000) | CY | 58.60 | $1,360.00 | $1,885.00 | $2,079.07 |
| 50 | P cul CL A 1 15 (542A0220) | LF | 80 | $97.00 | $78.00 | $103.55 |
| 51 | P cul CL A 1 24 (542A0229) | LF | 68 | $130.00 | $124.00 | $121.09 |
| 52 | P cul CL A 1 48 (542A0253) | LF | 58 | $270.00 | $295.00 | $193.54 |
| 53 | PRC flar end sec 15 (54213660) | EACH | 4 | $1,545.00 | $1,540.00 | $2,098.95 |
| 54 | PRC flar end sec 24 (54213669) | EACH | 4 | $2,100.00 | $2,050.00 | $3,134.25 |
| 55 | PRC flar end sec 48 (54213693) | EACH | 2 | $4,200.00 | $4,000.00 | $5,379.15 |
| 56 | Waterprf membrane sys (58100200) | SY | 332 | $50.00 | $77.00 | $75.03 |
| 57 | Concrete gutter TY A (60602500) | LF | 666 | $53.00 | $59.00 | $82.46 |
| 58 | SPBGR TY A 9FT posts (63000003) | LF | 2,312.50 | $43.00 | $40.75 | $40.79 |
| 59 | Traf bar term T6A (63100087) | EACH | 2 | $5,250.00 | $4,900.00 | $4,824.75 |
| 60 | TR bar TRM T1 SPL tan (63100167) | EACH | 9 | $4,000.00 | $3,700.00 | $3,916.50 |
| 61 | Guardrail remov (63200310) | LF | 2,650 | $8.00 | $6.00 | $9.71 |
| 62 | Shoulder rum strip 8 (64200108) | LF | 25,801 | $0.62 | $0.25 | $0.23 |
| 63 | Mobilization (67100100) | LS | 1 | $112,000 | $110,000 | $143,636 |
| 64 | Changeable message SN (70107025) | CAL DAY | 42 | $100.00 | $140.00 | $41.25 |
| 65 | Sign panel T1 (72000100) | SF | 128 | $31.00 | $33.00 | $45.02 |
| 66 | Remov sin pan assy TA (72400100) | EACH | 3 | $56.00 | $81.00 | $525.00 |
| 67 | Terminal marker - DA (72501000) | EACH | 12 | $46.00 | $44.00 | $52.50 |
| 68 | Teles STL sin support (72800100) | LF | 282 | $31.00 | $31.50 | $26.88 |
| 69 | Paint PVT MK line 4 (78001110) | LF | 7,931 | $0.35 | $0.60 | $0.59 |
| 70 | Paint PVT MK line 24 (78001180) | LF | 56 | $22.00 | $3.75 | $3.68 |
| 71 | Grdrail ref type A (78200005) | EACH | 33 | $13.00 | $13.00 | $10.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way