IDOT contract 99753 bid tabulation

Project Number: Bkn1-076 / /, section 23-00090-00-RS. Let by Illinois DOT on June 13, 2025, Gallatin, District 09. 2 bids received; low bid $741,652 by Samron Midwest Contracting, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
20
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Samron Midwest Contracting, Inc.$741,652Low
2E. T. Simonds Construction Company$757,614+2.0%
IDOT contract 99753: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Samron Midwest Contracting, Inc.2. E. T. Simonds Construction Company
1Area ref CR CTRL TRMT (X4430201)SY1,467$9.25$7.67
2Rem/rep SPBGR RL elem (X6331007)LF25$38.00$66.00
3Traf bar term rem (X6333500)EACH3$820.00$825.00
4Traf cont & prot SPL (X7010216)LS1$34,000$19,352
5Cold mill EX surface (Z0011500)SY39,466$1.25$1.64
6Bit matls tack CT (40600290)LB18,924$0.01$0.01
7Long joint sealant (40600370)LF15,915$3.50$3.50
8HMA SC IL-9.5 C N70 (40604052)TON4,790$92.00$94.49
9CL D patch T2 9 (44201753)SY11$260.00$225.00
10CL D patch T3 9 (44201757)SY62$255.00$223.00
11CL D patch T4 9 (44201759)SY47$250.00$212.73
12Aggregate SHLDS A (48100100)TON653$45.00$36.61
13TR bar TRM T1 SPL FLR (63100169)EACH3$5,450.00$6,600.00
14Mobilization (67100100)LS1$43,000$53,935
15Short term pavt mking (70300100)LF2,894$3.00$2.55
16Sign panel T1 (72000100)SF15.70$30.00$123.56
17Teles STL sin support (72800100)LF28$35.00$11.00
18Paint PVT MK line 4 (78001110)LF59,991$0.13$0.13
19Paint PVT MK line 24 (78001180)LF27$3.00$3.30
20Raised refl pavt MKR (78100100)EACH200$38.00$41.03
IDOT contract 99753: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy