America'S Parking Remarking, LLC: INDOT bid record

America'S Parking Remarking, LLC submitted 14 bids on Indiana DOT contracts in the data, from 11 FEB 2026 to 05 NOV 2026, and was the low bidder on 4 of them (29%). When it was not low, its total sat a median +37% above the low bid.

Owner
Indiana DOT
Low bid volume
$2,748,432
Latest bid
05 NOV 2026
Data through
05 NOV 2026
14Bids
4Low bids
29Win rate, percent
+37%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
202614429%
America'S Parking Remarking, LLC, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Wayne6117%
LaPorte3133%
Crawfordsville3133%
Greenfield100%
Vincennes11100%
America'S Parking Remarking, LLC, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL1414 (100%)$1.00$1.00
Contract liens109-08360DOL1414 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL1414 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices and markings109-08443DOL99 (100%)$1.00$1.00
Law enforcement officer801-12324HRS66 (100%)$67.50$60.00
Truck mounted attenuator801-12042DAY125 (42%)$81.00$450.00
Quality adjustments, temporary traffic control devices109-08443DOL55 (100%)$1.00$1.00
Quality adjustments, pavement traffic markings109-09377DOL55 (100%)$1.00$1.00
Flashing arrow sign801-06710DAY93 (33%)$10.00$17.00
Construction signs mobile801-92448DAY83 (38%)$7.50$7.25
Snowplowable raised pavement marker808-75998EACH63 (50%)$30.00$89.00
Prismatic reflector808-75994EACH72 (29%)$7.25$15.00
America'S Parking Remarking, LLC, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Gridlock Traffic Systems Inc122 of 12
Ce Hughes Milling Inc85 of 8
A & A Safety Inc74 of 7
Roadsafe Traffic Systems, Inc.60 of 6
K & S Markers, Inc.55 of 5
Highway Safety Services, Inc.32 of 3
The Aero-Mark Company LLC10 of 1
Atlantic Construction Company Inc10 of 1
America'S Parking Remarking, LLC, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026T-44553-AFort WayneRAISED PAVEMENT MARKINGS, REFURBISHED3 of 4$764,000+77%
05 NOV 2026T-46088-ACrawfordsvilleRAISED PAVEMENT MARKINGS, REFURBISHED3 of 5$350,559+143%
07 OCT 2026R-46042-ALaPortePAVEMENT MARKINGS4 of 5$150,688+11%
07 OCT 2026T-45532-AFort WaynePAVEMENT MARKINGS5 of 6$457,238+83%
02 SEP 2026T-46103-ALaPorteRAISED PAVEMENT MARKINGS, REFURBISHED1 of 3$531,000Low, 47% under the second
05 AUG 2026T-44982-AVincennesRAISED PAVEMENT MARKINGS, REFURBISHED1 of 3$1,591,254Low, 8.0% under the second
08 JUL 2026R-45915-ACrawfordsvilleRAISED PAVEMENT MARKINGS, NEW1 of 5$119,845Low, 26% under the second
08 JUL 2026T-45902-AFort WaynePAVEMENT MARKINGS2 of 4$62,366+39%
08 JUL 2026T-46141-AGreenfieldRAISED PAVEMENT MARKINGS, REFURBISHED2 of 4$151,913+3.0%
08 APR 2026T-43855-AFort WaynePAVEMENT MARKINGS1 of 4$506,333Low, 52% under the second
11 MAR 2026T-43851-AFort WayneRAISED PAVEMENT MARKINGS, REFURBISHED3 of 4$881,008+62%
11 MAR 2026T-45469-ACrawfordsvilleRAISED PAVEMENT MARKINGS, REFURBISHED2 of 4$197,644+2.0%
11 FEB 2026T-45895-AFort WaynePAVEMENT MARKINGS2 of 3$112,646+10%
11 FEB 2026T-46041-ALaPortePAVEMENT MARKINGS2 of 3$399,921+35%
America'S Parking Remarking, LLC: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy