INDOT contract B-40997-A bid tabulation

BRIDGE DECK OVERLAY. Let by Indiana DOT on July 9, 2025, Clark, Seymour. 3 bids received; low bid $2,082,733 by Ragle, Inc..

Owner
Indiana DOT
Letting
09 JUL 2025
Pay items
83
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ragle, Inc.$2,082,733Low
2E & B Paving LLC$2,106,705+1.0%
3American Contracting & Services Inc$2,321,221+11%
INDOT contract B-40997-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ragle, Inc.2. E & B Paving LLC3. American Contracting & Services Inc
0001Construction engineering (105-06845)LS1$20,000$25,000$20,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00
0004Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0007Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00
0008Mobilization and demobilization (110-01001)LS1$103,000$105,335$116,061
0009Clearing right-of-way (201-52370)LS1$35,000$21,066$23,212
0010Pavement removal (202-02240)SYS508$35.00$70.00$35.00
0011Present structure, remove portions, structure no. 1 (202-51328)LS1$90,000$153,000$130,000
0012Bridge railing, remove (202-62420)LFT556$10.00$15.00$17.00
0013Excavation, common (203-02000)CYS745$40.00$50.00$100.00
0014Linear grading (203-08607)LFT300$7.50$12.00$30.00
0015Stormwater management budget (205-12108)DOL28,550$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$20,000$28,000$30,000
0017Cofferdam (206-51235)LS1$85,000$50,000$35,000
0018Subgrade treatment, type IC (207-09935)SYS1,028$43.00$55.00$65.00
0019Aggregate for end bent backfill (211-06467)CYS34$175.00$135.00$200.00
0020Geotextile for pavement, type 2B (214-12239)SYS1,028$4.00$5.00$6.00
0021Subbase for PCCP (302-06464)CYS238$100.00$205.00$140.00
0022Compacted aggregate, no. 53 (303-01180)TON135$45.00$80.00$60.00
0023PCCP, 12 in. (502-06329)SYS344$225.00$350.00$335.00
0024Retrofitted tie bars (503-03489)EACH252$35.00$81.00$90.00
0025D-1 contraction joint (503-05240)LFT264$28.00$22.00$90.00
0026Jointed reinforced concrete pavement, 12 in. (503-12476)SYS392$250.00$360.00$380.00
0027Terminal joint, type PCCP (503-12478)LFT88$370.00$115.00$380.00
0028Expansion joint with load transfer (503-12479)LFT88$120.00$19.00$200.00
0029Guardrail, remove (601-02241)LFT468$4.00$4.00$4.00
0030Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT75$19.00$19.00$19.00
0031Guardrail transition, MGS without curb (601-12292)EACH4$3,225.00$3,225.00$3,225.00
0032Guardrail end treatment, type OS (601-94689)EACH4$3,025.00$3,025.00$3,025.00
0033Barrier delineator (602-06729)EACH16$20.00$30.00$50.00
0034Reinforced concrete bridge approach, 12 in. (609-06259)SYS210$285.00$305.00$315.00
0035Riprap, class 1 (616-05688)TON1,578$110.00$100.00$95.00
0036Riprap, class 2 (616-05689)TON101$110.00$115.00$120.00
0037Riprap, revetment (616-06405)TON116$70.00$90.00$95.00
0038Geotextile for riprap, type 1A (616-12246)SYS2,193$4.00$4.50$4.00
0039Mobilization and demobilization for seeding (621-01004)EACH1$975.00$1,000.00$1,000.00
0040Mulched seeding, type U (621-06560)SYS83$48.60$25.00$35.00
0041Water (621-06567)KGAL1$2.00$10.00$0.01
0042Sodding (621-06574)SYS58$88.00$90.00$100.00
0043Articulated concrete block (621-09815)SYS199$270.00$470.00$355.00
0044Seed mixture, floodplain (621-12612)LBS2$1,313.00$350.00$800.00
0045Field office, type C (628-09403)MOS15$2,750.00$3,500.00$3,800.00
0046Computer system equipment (628-11976)EACH3$1,000.00$250.00$1,000.00
0047Field drilled hole in concrete (702-51863)EACH1,680$22.00$15.00$25.00
0048Reinforcing bars, epoxy coated (703-06029)LBS30,814$2.05$2.00$1.60
0049Threaded tie bar assembly, epoxy coated (703-97936)EACH188$61.00$35.00$50.00
0050Concrete, C, superstructure (704-51002)CYS47.20$2,600.00$1,800.00$2,100.00
0051Railing, concrete type FC (706-11600)CYS57$813.00$813.00$813.00
0052Concrete bridge railing transition, type TFC (706-11620)EACH4$1,300.00$1,300.00$1,300.00
0053Surface seal , bridge no. 1 (709-51821)LS1$5,000.00$2,500.00$9,000.00
0054Temporary causeway (713-04331)LS1$100,000$20,000$55,000
0055Geotextile for underdrains, type 2A (718-12307)SYS96$4.00$11.00$10.00
0056Hydrodemolition (722-01066)SYS1,298$75.00$70.00$100.00
0057Bridge deck overlay budget (722-12380)DOL20,800$1.00$1.00$1.00
0058Bridge deck, remove concrete surface (722-12464)SYS1,298$9.00$9.00$15.00
0059Longitudinal grooving (722-12732)SYS1,432$5.50$5.00$10.00
0060Bridge deck patching, full depth (722-51401)SFT350$75.00$50.00$50.00
0061Construction sign, type D (801-03291)EACH2$281.00$281.00$200.00
0062Temporary pavement marking, removable, 6 in. (801-06209)LFT7,732$1.77$1.77$2.15
0063Temporary transverse pavement marking, removable, 24 in. (801-06218)LFT39$12.28$12.28$10.00
0064Construction sign, type A (801-06640)EACH42$224.00$224.00$200.00
0065Construction sign, type B (801-06645)EACH2$224.00$98.00$100.00
0066Maintaining traffic (801-06775)LS1$30,000$61,400$55,000
0067Energy absorbing terminal, CZ, TL-3 (801-07024)EACH2$5,900.00$5,900.00$9,000.00
0068Barricade, type III-A (801-07118)LFT24$15.94$15.94$20.00
0069Temporary traffic barrier, anchored, type 2 (801-08508)LFT780$55.00$50.00$65.00
0070Portable signal (801-12081)LS1$40,000$45,000$25,000
0071Driveway assistance device (801-12482)EACH2$10,000$12,500$7,500.00
0072Temporary worksite speed limit sign assembly, continuous (801-12883)EACH4$1,337.00$1,337.00$400.00
0073Sign, ground mounted, reset (802-91122)EACH4$300.00$300.00$300.00
0074Line, remove (808-06716)LFT2,282$0.61$0.61$0.75
0075Line, multi-component, solid, white, 6 in. (808-10049)LFT1,816$1.21$1.21$4.11
0076Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,044$1.21$1.21$4.11
0077Grooving for pavement markings (808-12032)LFT2,281$1.08$1.08$2.00
0078Line, multi-component, broken, yellow, 6 in. (808-12841)LFT301$3.11$3.11$4.11
0079Snowplowable raised pavement marker, remove (808-75996)EACH4$15.00$50.00$50.00
0080Bridge deck overlay, latex modified (722-51842)SYS1,334$120.00
0081Bridge deck overlay, silica fume modified (722-01061)SYS1,334$129.25$85.00
0082Inertial profiler, bridge encounter (704-000080)LS1$4,000.00$3,500.00$10,000
0083Corrective grinding, bridge encounter (704-000082)LS1$10,000$7,000.00$25,000
INDOT contract B-40997-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy