INDOT contract B-42072-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on October 8, 2025, Wayne, Greenfield. 3 bids received; low bid $2,025,285 by Beaty Construction Inc.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 84
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beaty Construction Inc | $2,025,285 | Low |
| 2 | Milestone Contractors LP | $2,149,500 | +6.0% |
| 3 | Pontem Contractors Inc | $2,200,600 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beaty Construction Inc | 2. Milestone Contractors LP | 3. Pontem Contractors Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $13,856 | $18,500 | $16,223 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $95,000 | $110,000 | $110,030 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $38,000 | $44,000 | $43,500 |
| 0011 | Curb, concrete, remove (202-02278) | LFT | 116 | $18.00 | $25.00 | $15.68 |
| 0012 | Present structure, remove portions, structure no. 89-00720 (202-51328) | LS | 1 | $205,709 | $127,917 | $224,303 |
| 0013 | Sidewalk concrete, remove (202-52710) | SYS | 147 | $16.00 | $30.00 | $19.44 |
| 0014 | Inlet, remove (202-91385) | EACH | 1 | $570.00 | $1,300.00 | $560.21 |
| 0015 | Excavation, common (203-02000) | CYS | 852 | $1.00 | $45.00 | $74.74 |
| 0016 | Excavation, rock (203-02010) | CYS | 290 | $240.00 | $300.00 | $85.75 |
| 0017 | Borrow (203-02070) | CYS | 288 | $34.00 | $25.00 | $34.26 |
| 0018 | Excavation, waterway (203-51223) | CYS | 249 | $37.00 | $80.00 | $67.86 |
| 0019 | Stormwater management budget (205-12108) | DOL | 5,603 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $7,200.00 | $2,800.00 | $6,111.41 |
| 0021 | Cofferdam (206-51235) | LS | 1 | $46,000 | $50,000 | $149,280 |
| 0022 | Subgrade treatment, type II (207-08264) | SYS | 52 | $29.00 | $50.00 | $32.97 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 841 | $34.00 | $55.00 | $46.21 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 45 | $60.00 | $100.00 | $88.43 |
| 0025 | Structure backfill, type 3 (211-09266) | CYS | 460 | $81.00 | $105.00 | $98.18 |
| 0026 | Structure backfill, type 5 (211-09268) | CYS | 53 | $280.00 | $250.00 | $186.40 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,070 | $5.00 | $5.00 | $4.39 |
| 0028 | Subbase for PCCP (302-06464) | CYS | 58 | $160.00 | $225.00 | $183.72 |
| 0029 | Dense graded subbase (302-07455) | CYS | 9 | $173.00 | $225.00 | $147.50 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 82 | $65.00 | $88.00 | $68.94 |
| 0031 | Widening with HMA, type C (304-07494) | TON | 4 | $237.00 | $1,200.00 | $183.75 |
| 0032 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 17 | $218.00 | $150.00 | $266.09 |
| 0033 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 71 | $175.00 | $300.00 | $183.75 |
| 0034 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 90 | $175.00 | $270.00 | $183.75 |
| 0035 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 217 | $175.00 | $250.00 | $183.75 |
| 0036 | Joint adhesive (401-11526) | LFT | 1,044 | $0.50 | $2.50 | $0.53 |
| 0038 | Asphalt for tack coat (406-05520) | TON | 1 | $600.00 | $750.00 | $630.00 |
| 0039 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $2,950.00 | $3,400.00 | $3,045.00 |
| 0040 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $2,200.00 | $3,000.00 | $3,150.00 |
| 0041 | Impact attenuator, LS-W1, TL-1 (601-07009) | EACH | 1 | $25,450 | $25,400 | $26,985 |
| 0042 | Guardrail transition, MGS with curb (601-12291) | EACH | 2 | $3,475.00 | $3,650.00 | $3,150.00 |
| 0043 | Guardrail transition, MGS without curb (601-12292) | EACH | 1 | $3,400.00 | $3,550.00 | $3,045.00 |
| 0044 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 1 | $1,250.00 | $1,200.00 | $1,023.75 |
| 0045 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $2,300.00 | $3,150.00 | $3,045.00 |
| 0046 | Barrier delineator (602-06729) | EACH | 8 | $18.00 | $25.00 | $52.79 |
| 0047 | Sidewalk, concrete (604-06070) | SYS | 186 | $82.00 | $90.00 | $87.94 |
| 0048 | Curb and gutter, concrete (605-06140) | LFT | 294 | $63.00 | $60.00 | $47.86 |
| 0049 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 225.70 | $172.00 | $225.00 | $231.28 |
| 0050 | PCCP for approaches, 6 in. (610-08446) | SYS | 49 | $95.00 | $32.00 | $86.07 |
| 0051 | Monument, type B (615-06505) | EACH | 5 | $1,225.00 | $900.00 | $892.50 |
| 0052 | Riprap, revetment (616-06405) | TON | 280 | $50.00 | $100.00 | $60.86 |
| 0053 | Geotextile for riprap, type 2B (616-12249) | SYS | 347 | $4.25 | $5.00 | $6.84 |
| 0054 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $925.00 | $925.00 | $971.25 |
| 0055 | Erosion control blanket (621-02770) | SYS | 721 | $3.15 | $3.15 | $3.31 |
| 0056 | Seed mixture, type U (621-06554) | LBS | 27 | $12.15 | $12.15 | $12.76 |
| 0057 | Sodding (621-06574) | SYS | 8 | $52.00 | $52.00 | $101.89 |
| 0058 | Sodding, nursery (621-06575) | SYS | 57 | $52.00 | $52.00 | $77.25 |
| 0059 | Field office, type C (628-09403) | MOS | 16 | $3,200.00 | $4,500.00 | $2,942.64 |
| 0060 | Computer system equipment (628-11976) | EACH | 1 | $1,200.00 | $1,000.00 | $1,190.22 |
| 0061 | Concrete, A, substructure (702-51005) | CYS | 295 | $1,325.00 | $925.00 | $981.42 |
| 0062 | Concrete, B, footings (702-51015) | CYS | 289.60 | $600.00 | $600.00 | $532.57 |
| 0063 | Threaded tie bar assembly (703-01540) | EACH | 36 | $42.00 | $50.00 | $63.51 |
| 0064 | Reinforcing bars (703-06028) | LBS | 67,252 | $1.18 | $1.60 | $1.35 |
| 0065 | Reinforcing bars, epoxy coated (703-06029) | LBS | 95,776 | $1.30 | $1.70 | $1.44 |
| 0066 | Concrete, C, superstructure (704-51002) | CYS | 221.20 | $1,150.00 | $996.23 | $1,309.71 |
| 0067 | Concrete bridge railing transition, type TTX (706-06372) | EACH | 4 | $7,900.00 | $10,455 | $8,131.31 |
| 0068 | Railing, concrete type TX (706-09965) | LFT | 122 | $193.00 | $577.00 | $406.83 |
| 0069 | Surface seal (709-51821) | LS | 1 | $1.00 | $7,000.00 | $9,065.30 |
| 0070 | Safety metal end section, 6:1, diameter 12 in. (715-03321) | EACH | 1 | $1,394.00 | $1,000.00 | $1,256.20 |
| 0071 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 201 | $96.00 | $115.00 | $57.90 |
| 0072 | Video inspection for pipe (715-09064) | LFT | 201 | $7.00 | $16.20 | $17.01 |
| 0073 | Geotextile for underdrains, type 2A (718-12307) | SYS | 515 | $3.75 | $3.00 | $2.39 |
| 0074 | Manhole, type C2 (720-90984) | EACH | 1 | $6,075.00 | $4,500.00 | $4,042.04 |
| 0075 | Catch basin, type B15 (720-99416) | EACH | 2 | $4,980.00 | $4,000.00 | $3,432.71 |
| 0076 | Road closure sign assembly (801-04308) | EACH | 4 | $305.00 | $338.00 | $320.25 |
| 0077 | Detour route marker assembly (801-06625) | EACH | 32 | $155.00 | $186.00 | $162.75 |
| 0078 | Construction sign, type A (801-06640) | EACH | 12 | $267.00 | $298.00 | $280.35 |
| 0079 | Construction sign, type B (801-06645) | EACH | 2 | $134.00 | $86.00 | $140.70 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $5,000.00 | $10,000 | $13,730 |
| 0081 | Barricade, type III-A (801-07118) | LFT | 48 | $17.32 | $16.00 | $18.19 |
| 0082 | Barricade, type III-B (801-07119) | LFT | 48 | $17.32 | $19.00 | $18.19 |
| 0083 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 852 | $1.27 | $3.30 | $1.33 |
| 0084 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 852 | $1.27 | $3.30 | $1.33 |
| 0085 | Fertilizer for permanent seeding (621-06545) | TON | 0.15 | $1,455.00 | $1,455.00 | $1,527.73 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.