Milestone Contractors LP: INDOT bid record
Milestone Contractors LP submitted 850 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 228 of them (27%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $1,306,813,109
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 127 | 45 | 35% |
| 2023 | 131 | 48 | 37% |
| 2024 | 228 | 62 | 27% |
| 2025 | 178 | 35 | 20% |
| 2026 | 186 | 38 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 182 | 34 | 19% |
| Greenfield | 166 | 52 | 31% |
| LaPorte | 165 | 33 | 20% |
| Fort Wayne | 139 | 46 | 33% |
| Crawfordsville | 132 | 49 | 37% |
| Vincennes | 59 | 14 | 24% |
| Crawfordsville, Greenfield | 4 | 0 | 0% |
| Fort Wayne, Greenfield | 2 | 0 | 0% |
| Fort Wayne, LaPorte | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 823 | 823 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 823 | 823 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 819 | 819 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 729 | 729 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 725 | 725 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 713 | 713 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 711 | 711 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 579 | 579 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 643 | 373 (58%) | $500.00 | $525.00 |
| Construction sign, type A | 801-06640 | EACH | 634 | 363 (57%) | $200.00 | $200.00 |
| Project estimate adjustment | 109-08463 | DOL | 352 | 352 (100%) | $1.00 | $1.00 |
| Detour route marker assembly | 801-06625 | EACH | 566 | 279 (49%) | $148.00 | $140.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & B Paving LLC | 343 | 196 of 343 |
| Rieth-Riley Construction Co., Inc. | 343 | 170 of 343 |
| Morphey Construction Inc. | 152 | 58 of 152 |
| Beaty Construction Inc | 147 | 56 of 147 |
| Force Construction Co Inc | 112 | 71 of 112 |
| Dave Omara Contractor Inc | 91 | 52 of 91 |
| Superior Construction Co Inc | 87 | 47 of 87 |
| R L McCoy Inc | 79 | 35 of 79 |
| Duncan Robertson Inc | 78 | 50 of 78 |
| His Constructors Inc | 73 | 39 of 73 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-39073-A | Greenfield | BIKE AND PEDESTRIAN FACILITIES | 3 of 7 | $2,098,534 | +3.0% |
| 05 NOV 2026 | R-42227-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY | 4 of 7 | $3,970,000 | +10% |
| 05 NOV 2026 | R-43746-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 3 of 3 | $1,457,414 | +36% |
| 05 NOV 2026 | R-44293-A | Seymour | BIKE AND PEDESTRIAN FACILITIES | 7 of 7 | $2,172,739 | +60% |
| 05 NOV 2026 | R-44392-A | Crawfordsville | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 5 | $895,287 | +3.0% |
| 05 NOV 2026 | R-44432-A | Seymour | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 3 of 4 | $1,447,961 | +29% |
| 05 NOV 2026 | R-44492-A | Vincennes | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 4 of 7 | $898,280 | +13% |
| 05 NOV 2026 | R-44635-A | LaPorte | HMA OVERLAY, MINOR STRUCTURAL AND BRIDGE THIN DECK OVERLAY | 2 of 2 | $17,375,085 | +3.0% |
| 05 NOV 2026 | R-45794-A | Greenfield | PAVEMENT PATCHING | 1 of 3 | $4,428,621 | Low, 3.0% under the second |
| 05 NOV 2026 | R-46147-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 1 of 3 | $5,192,777 | Low, 2.0% under the second |
| 05 NOV 2026 | R-46447-A | LaPorte | SIDEWALK CONSTRUCTION AND DRAINAGE IMPROVEMENTS | 1 of 3 | $1,417,399 | Low, 10% under the second |
| 05 NOV 2026 | B-44260-A | Crawfordsville | BRIDGE DECK OVERLAY AND REHABILITATION OR REPAIR | 2 of 5 | $1,859,950 | +12% |
| 05 NOV 2026 | B-44266-A | Greenfield | BRIDGE REPLACEMENT | 1 of 2 | $1,189,800 | Low, 3.0% under the second |
| 05 NOV 2026 | B-44268-A | Greenfield | BRIDGE REHABILITATION OR REPAIR | 2 of 5 | $677,409 | +6.0% |
| 05 NOV 2026 | B-44466-A | Seymour | BRIDGE DECK OVERLAY AND COPING REPLACEMENT | 2 of 7 | $1,296,800 | +1.0% |
| 05 NOV 2026 | B-44533-A | Fort Wayne | REPLACE SUPERSTRUCTURE | 2 of 4 | $5,373,088 | +2.0% |
| 05 NOV 2026 | B-44534-A | Fort Wayne | BRIDGE DECK OVERLAY | 2 of 4 | $6,790,093 | +21% |
| 05 NOV 2026 | B-44536-A | Fort Wayne | BRIDGE DECK OVERLAY | 1 of 3 | $604,720 | Low, 19% under the second |
| 05 NOV 2026 | B-44548-A | Fort Wayne | BRIDGE REPLACEMENT AND REHABILITATION | 5 of 5 | $1,741,197 | +11% |
| 05 NOV 2026 | B-45063-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 6 | $1,989,782 | +5.0% |
| 05 NOV 2026 | B-46218-A | Seymour | SMALL STRUCTURE REPLACEMENT | 6 of 7 | $534,826 | +20% |
| 05 NOV 2026 | T-46195-A | Crawfordsville | TRAFFIC SIGNALS MODERNIZATION | 2 of 3 | $2,016,821 | +2.0% |
| 07 OCT 2026 | R-43027-C | LaPorte | HMA OVERLAY, SMALL STRUCTURE REPLACEMENT, TRAFFIC SIGNALS | 2 of 2 | $16,046,758 | +18% |
| 07 OCT 2026 | R-43748-A | Seymour | SMALL STRUCTURE REPLACEMENT | 3 of 5 | $1,227,977 | +14% |
| 07 OCT 2026 | R-43918-A | LaPorte | INTERCHANGE MODIFICATION | 2 of 3 | $7,441,984 | 0.0% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.