INDOT contract B-44533-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on November 5, 2026, Allen, Fort Wayne. 4 bids received; low bid $5,288,075 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 83
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $5,288,075 | Low |
| 2 | Milestone Contractors LP | $5,373,088 | +2.0% |
| 3 | Beaty Construction Inc | $5,481,910 | +4.0% |
| 4 | R L McCoy Inc | $7,487,177 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Milestone Contractors LP | 3. Beaty Construction Inc | 4. R L McCoy Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $35,000 | $30,000 | $18,000 | $48,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $250,000 | $268,654 | $274,096 | $374,000 |
| 0010 | Pavement removal (202-02240) | SYS | 520 | $5.00 | $75.00 | $50.50 | $45.00 |
| 0011 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $363,780 | $180,000 | $280,003 | $980,000 |
| 0012 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $356,986 | $180,000 | $280,003 | $980,000 |
| 0013 | Excavation, common (203-02000) | CYS | 335 | $100.00 | $78.00 | $41.75 | $107.00 |
| 0014 | Subgrade treatment, type IC (207-09935) | SYS | 30 | $200.00 | $72.00 | $150.00 | $150.00 |
| 0015 | Aggregate for end bent backfill (211-06467) | CYS | 100 | $120.00 | $123.00 | $130.00 | $120.00 |
| 0016 | Flowable backfill, non- removable (213-09269) | CYS | 30 | $300.00 | $490.00 | $570.00 | $575.00 |
| 0017 | Geogrid, type IB (214-11796) | SYS | 30 | $20.00 | $11.00 | $15.05 | $30.00 |
| 0018 | Geotextile for pavement, type 2B (214-12239) | SYS | 692 | $5.00 | $6.50 | $6.25 | $7.00 |
| 0019 | Subbase for PCCP (302-06464) | CYS | 124 | $100.00 | $200.00 | $135.00 | $170.00 |
| 0020 | Compacted aggregate, no. 53 (303-01180) | TON | 185 | $60.00 | $68.00 | $66.00 | $48.00 |
| 0021 | HMA patching, full depth, type B (304-12623) | TON | 20 | $440.00 | $250.00 | $250.00 | $250.00 |
| 0022 | Milling, transition (306-08043) | SYS | 488 | $15.00 | $25.00 | $14.00 | $13.00 |
| 0023 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 42 | $312.00 | $250.00 | $250.00 | $250.00 |
| 0024 | Joint adhesive (401-11526) | LFT | 212 | $2.75 | $0.25 | $0.25 | $0.25 |
| 0025 | Asphalt for tack coat (406-05520) | TON | 2 | $1.00 | $500.00 | $500.00 | $500.00 |
| 0026 | Guardrail, remove (601-02241) | LFT | 855 | $8.00 | $5.00 | $10.25 | $5.00 |
| 0027 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 488 | $25.00 | $24.00 | $27.25 | $24.00 |
| 0028 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,285.00 | $3,091.00 | $3,500.00 | $3,091.00 |
| 0029 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,800.00 | $2,900.00 | $3,150.00 | $2,900.00 |
| 0030 | Barrier delineator (602-06729) | EACH | 26 | $20.00 | $15.00 | $35.00 | $35.00 |
| 0031 | Paved side ditch, type A , modified (607-06335) | LFT | 214 | $75.00 | $140.00 | $93.25 | $120.00 |
| 0032 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 490 | $200.00 | $195.00 | $203.50 | $280.00 |
| 0033 | Inspection hole (616-93772) | EACH | 8 | $100.00 | $450.00 | $700.00 | $800.00 |
| 0034 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $155,000 | $155,000 | $173,600 | $155,000 |
| 0035 | Clean steel bridge, QP-2, bridge no. 2 (619-11052) | LS | 1 | $155,000 | $155,000 | $172,000 | $155,000 |
| 0036 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $4,000.00 | $4,000.00 | $14,400 | $4,000.00 |
| 0037 | Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459) | LS | 1 | $4,000.00 | $4,000.00 | $14,000 | $4,000.00 |
| 0038 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $68,000 | $68,000 | $60,000 | $68,000 |
| 0039 | Coat steel bridge, bridge no. 2 (619-51859) | LS | 1 | $68,000 | $68,000 | $60,000 | $68,000 |
| 0040 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $600.00 | $600.00 | $525.00 | $600.00 |
| 0041 | Mulched seeding, type R (621-06559) | SYS | 1,085 | $3.50 | $3.50 | $3.98 | $3.50 |
| 0042 | Field office, type E (628-12684) | MOS | 18 | $4,500.00 | $6,200.00 | $7,625.00 | $3,700.00 |
| 0043 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $3,000.00 | $2,400.00 | $2,950.00 | $3,000.00 |
| 0044 | Concrete, A, substructure (702-51005) | CYS | 68.20 | $1,000.00 | $1,200.00 | $1,550.00 | $1,300.00 |
| 0045 | Field drilled hole in concrete (702-51863) | EACH | 474 | $20.00 | $15.00 | $32.50 | $35.00 |
| 0046 | Reinforcing bars, epoxy coated (703-06029) | LBS | 351,024 | $1.75 | $1.75 | $1.50 | $1.70 |
| 0047 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 224 | $20.00 | $45.00 | $50.75 | $62.00 |
| 0048 | Concrete, C, superstructure (704-51002) | CYS | 726.60 | $750.00 | $1,300.00 | $1,210.00 | $1,600.00 |
| 0049 | Railing, concrete type FC (706-11600) | CYS | 79.20 | $715.00 | $525.00 | $635.00 | $715.00 |
| 0050 | Railing, concrete type FC , modified (706-11600) | CYS | 2 | $715.00 | $2,100.00 | $1,240.00 | $715.00 |
| 0051 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,000.00 | $3,000.00 | $2,825.00 | $2,000.00 |
| 0052 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $2,000.00 | $1.00 | $500.00 |
| 0053 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $1.00 | $2,000.00 | $1.00 | $500.00 |
| 0054 | Concrete surface coating (709-96826) | LS | 1 | $20,000 | $54,780 | $3,000.00 | $65,000 |
| 0055 | Patching concrete structures (710-09158) | SFT | 200 | $184.00 | $184.00 | $184.00 | $170.00 |
| 0056 | Structural steel, field cut (711-04297) | SQIN | 1,168 | $48.00 | $48.00 | $48.00 | $48.00 |
| 0057 | Structural steel (711-51035) | LBS | 207,430 | $7.50 | $7.10 | $6.50 | $7.25 |
| 0058 | Drilled hole (711-51864) | EACH | 1,088 | $77.00 | $48.00 | $77.00 | $77.00 |
| 0059 | Stud shear connectors (711-96800) | EACH | 1,242 | $4.15 | $4.15 | $4.75 | $6.00 |
| 0060 | Longitudinal grooving (722-12732) | SYS | 3,396 | $4.00 | $4.00 | $6.45 | $5.50 |
| 0061 | Bridge expansion joint, type PCF, replace (724-12776) | LFT | 222 | $60.00 | $100.00 | $57.50 | $120.00 |
| 0062 | Bearing assembly, elastomeric (726-92406) | EACH | 16 | $3,500.00 | $4,200.00 | $3,750.00 | $4,000.00 |
| 0063 | Road closure sign assembly (801-04308) | EACH | 8 | $225.00 | $350.00 | $225.00 | $350.00 |
| 0065 | Detour route marker assembly (801-06625) | EACH | 58 | $145.00 | $175.00 | $145.00 | $175.00 |
| 0066 | Construction sign, type A (801-06640) | EACH | 70 | $170.00 | $400.00 | $170.00 | $400.00 |
| 0067 | Construction sign, type B (801-06645) | EACH | 20 | $120.00 | $250.00 | $120.00 | $250.00 |
| 0068 | Flashing arrow sign (801-06710) | DAY | 112 | $15.00 | $20.00 | $35.00 | $20.00 |
| 0069 | Maintaining traffic (801-06775) | LS | 1 | $107,500 | $54,324 | $225,000 | $124,000 |
| 0070 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $4,765.00 | $8,505.00 | $11,285 | $8,505.00 |
| 0071 | Barricade, type III-A (801-07118) | LFT | 288 | $12.00 | $17.00 | $12.00 | $17.00 |
| 0072 | Barricade, type III-B (801-07119) | LFT | 64 | $12.00 | $17.00 | $12.00 | $17.00 |
| 0073 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,070 | $46.50 | $55.00 | $53.81 | $85.00 |
| 0074 | Law enforcement officer (801-12324) | HRS | 400 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0075 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $850.00 | $650.00 | $850.00 | $650.00 |
| 0076 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 242 | $2.00 | $0.30 | $2.00 | $0.30 |
| 0077 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,200 | $2.00 | $0.30 | $2.00 | $0.30 |
| 0078 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,200 | $2.00 | $0.30 | $2.00 | $0.30 |
| 0079 | Transverse marking, paint, crosshatch line, yellow, 12 in. (808-75078) | LFT | 530 | $9.00 | $1.00 | $9.00 | $1.00 |
| 0080 | Temporary pavement marking, 6 in. (801-06206) | LFT | 72,500 | $0.34 | $0.30 | $0.34 | $0.30 |
| 0081 | Line, remove (808-06716) | LFT | 93,290 | $0.22 | $0.50 | $0.22 | $0.50 |
| 0082 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 5,690 | $1.40 | $1.00 | $1.40 | $1.00 |
| 0083 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 4,720 | $1.40 | $1.00 | $1.40 | $1.00 |
| 0084 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 2,000 | $1.40 | $1.00 | $1.40 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.