R L McCoy Inc submitted 83 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 22 of them (27%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $51,418,574
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 10 | 5 | 50% |
| 2023 | 14 | 5 | 36% |
| 2024 | 27 | 3 | 11% |
| 2025 | 16 | 6 | 38% |
| 2026 | 16 | 3 | 19% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 81 | 81 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 81 | 81 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 81 | 81 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 70 | 70 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 68 | 68 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 68 | 68 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 68 | 68 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Road closure sign assembly | 801-04308 | EACH | 70 | 55 (79%) | $259.50 | $280.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 68 | 55 (81%) | $475.00 | $525.00 |
| Detour route marker assembly | 801-06625 | EACH | 66 | 48 (73%) | $140.00 | $140.00 |
| Reinforcing bars, epoxy coated | 703-06029 | LBS | 74 | 45 (61%) | $1.51 | $1.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Milestone Contractors LP | 79 | 44 of 79 |
| Pioneer Associates Inc | 28 | 15 of 28 |
| Beaty Construction Inc | 23 | 9 of 23 |
| E & B Paving LLC | 23 | 17 of 23 |
| Miller Bros Construction Inc | 19 | 11 of 19 |
| Rieth-Riley Construction Co., Inc. | 15 | 3 of 15 |
| Duncan Robertson Inc | 14 | 8 of 14 |
| Icc Group Inc | 7 | 2 of 7 |
| His Constructors Inc | 5 | 3 of 5 |
| Laporte Construction Company Inc | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | B-44533-A | Fort Wayne | REPLACE SUPERSTRUCTURE | 4 of 4 | $7,487,177 | +42% |
| 05 NOV 2026 | B-44534-A | Fort Wayne | BRIDGE DECK OVERLAY | 4 of 4 | $7,828,363 | +40% |
| 05 NOV 2026 | B-44536-A | Fort Wayne | BRIDGE DECK OVERLAY | 2 of 3 | $722,340 | +19% |
| 05 NOV 2026 | B-45063-A | Fort Wayne | BRIDGE REPLACEMENT | 6 of 6 | $2,550,200 | +35% |
| 07 OCT 2026 | B-44289-A | Fort Wayne | REPLACE SUPERSTRUCTURE | 3 of 3 | $2,723,750 | +19% |
| 07 OCT 2026 | B-44530-A | Fort Wayne | BRIDGE DECK OVERLAY | 4 of 4 | $642,827 | +8.0% |
| 07 OCT 2026 | B-44532-A | Fort Wayne | BRIDGE DECK OVERLAY | 4 of 4 | $2,733,217 | +16% |
| 07 OCT 2026 | B-45067-A | Fort Wayne | BRIDGE DECK OVERLAY | 1 of 3 | $3,276,869 | Low, 1.0% under the second |
| 02 SEP 2026 | B-42374-A | Fort Wayne | BRIDGE REPLACEMENT | 1 of 3 | $7,491,183 | Low, 9.0% under the second |
| 02 SEP 2026 | B-45066-A | Fort Wayne | BRIDGE DECK OVERLAY | 4 of 5 | $1,750,565 | +24% |
| 08 JUL 2026 | B-44339-A | Fort Wayne | BRIDGE REPLACEMENT | 5 of 6 | $1,525,107 | +28% |
| 08 JUL 2026 | B-44515-A | Fort Wayne | BRIDGE REPLACEMENT AND DECK OVERLAY | 2 of 5 | $4,427,416 | +5.0% |
| 08 JUL 2026 | B-45531-A | Fort Wayne | BRIDGE REPLACEMENT | 4 of 4 | $1,479,881 | +7.0% |
| 11 MAR 2026 | B-42777-A | Fort Wayne | BRIDGE REPLACEMENT | 1 of 4 | $3,652,797 | Low, 3.0% under the second |
| 11 FEB 2026 | B-42775-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 6 | $1,541,001 | +11% |
| 14 JAN 2026 | B-45637-A | Fort Wayne | REPAIR OR REPLACE JOINTS | 5 of 5 | $1,346,609 | +81% |
| 10 DEC 2025 | B-43610-A | Fort Wayne | BRIDGE REPLACEMENT | 5 of 8 | $3,081,194 | +17% |
| 10 DEC 2025 | B-43742-A | Fort Wayne | BRIDGE DECK OVERLAY | 4 of 6 | $7,836,771 | +9.0% |
| 13 NOV 2025 | B-43624-A | Fort Wayne | BRIDGE REPLACEMENT | 6 of 6 | $1,328,183 | +35% |
| 10 SEP 2025 | B-42783-A | Fort Wayne | REPLACE SUPERSTRUCTURE | 4 of 5 | $4,366,036 | +8.0% |
| 10 SEP 2025 | B-42838-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 5 | $1,385,298 | +7.0% |
| 06 AUG 2025 | B-42780-A | Fort Wayne | BRIDGE REPLACEMENT | 1 of 5 | $3,686,941 | Low, 7.0% under the second |
| 06 AUG 2025 | B-42843-A | Fort Wayne | BRIDGE SUPERSTRUCTURE REPLACEMENT | 3 of 5 | $1,064,494 | +23% |
| 06 AUG 2025 | B-43796-A | Fort Wayne | BRIDGE DECK OVERLAY AND BRIDGE COATING | 1 of 3 | $2,271,604 | Low, 6.0% under the second |
| 06 AUG 2025 | B-43797-A | Fort Wayne | BRIDGE DECK OVERLAY | 1 of 3 | $1,986,768 | Low, 7.0% under the second |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.