INDOT contract B-42783-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on September 10, 2025, Wells, Fort Wayne. 5 bids received; low bid $4,028,138 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 92
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $4,028,138 | Low |
| 2 | Beaty Construction Inc | $4,042,418 | 0.0% |
| 3 | Milestone Contractors LP | $4,049,620 | +1.0% |
| 4 | R L McCoy Inc | $4,366,036 | +8.0% |
| 5 | E & B Paving LLC | $4,465,000 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Beaty Construction Inc | 3. Milestone Contractors LP | 4. R L McCoy Inc | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $30,211 | $30,000 | $40,000 | $50,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $200,000 | $396,596 | $202,481 | $218,000 | $220,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $80,000 | $21,496 | $80,992 | $87,000 | $88,080 |
| 0011 | Present structure, remove, structure no. 90-00054 (202-51330) | LS | 1 | $200,000 | $180,000 | $247,257 | $450,000 | $392,177 |
| 0012 | Pipe, remove (202-96133) | LFT | 30 | $40.00 | $35.64 | $100.00 | $100.00 | $35.64 |
| 0013 | Excavation, common (203-02000) | CYS | 1,204 | $25.00 | $85.70 | $65.00 | $65.00 | $85.70 |
| 0014 | Borrow (203-02070) | CYS | 6,131 | $15.00 | $21.27 | $25.00 | $25.00 | $21.27 |
| 0015 | Excavation, waterway (203-51223) | CYS | 283 | $25.00 | $47.04 | $60.00 | $65.00 | $100.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 37,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $40,000 | $26,902 | $4,600.00 | $15,000 | $100,000 |
| 0018 | SWQCP preparation (205-12618) | LS | 1 | $2,000.00 | $2,000.00 | $1,500.00 | $3,200.00 | $15,000 |
| 0019 | Excavation, foundation, unclassified (206-51230) | CYS | 192 | $25.00 | $28.00 | $100.00 | $100.00 | $120.00 |
| 0020 | Cofferdam (206-51235) | LS | 1 | $30,000 | $294,000 | $215,000 | $300,000 | $250,000 |
| 0021 | Subgrade treatment, type ibc (207-12635) | SYS | 4,786 | $20.00 | $14.00 | $15.65 | $16.00 | $13.94 |
| 0022 | B borrow (211-02050) | CYS | 18 | $100.00 | $58.29 | $75.00 | $75.00 | $120.00 |
| 0023 | Aggregate for end bent backfill (211-06467) | CYS | 40 | $115.00 | $125.00 | $140.00 | $170.00 | $250.00 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 402 | $115.00 | $50.80 | $55.00 | $55.00 | $50.80 |
| 0025 | Geotextile for pavement, type 2B (214-12239) | SYS | 8,149 | $5.00 | $3.21 | $6.00 | $6.00 | $3.21 |
| 0026 | Compacted aggregate, no. 5 (301-12232) | CYS | 660 | $100.00 | $67.70 | $80.00 | $80.00 | $67.70 |
| 0027 | Compacted aggregate, no. 8 (301-12233) | CYS | 5 | $115.00 | $115.69 | $100.00 | $100.00 | $115.69 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 412 | $110.00 | $58.17 | $75.00 | $75.00 | $58.17 |
| 0029 | Subbase for PCCP (302-06464) | CYS | 54 | $140.00 | $216.00 | $205.00 | $110.00 | $100.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 480 | $48.50 | $44.00 | $44.00 | $44.00 | $48.00 |
| 0031 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 319 | $128.00 | $117.00 | $117.00 | $117.00 | $140.00 |
| 0032 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 1,213 | $100.00 | $91.00 | $91.00 | $91.00 | $110.00 |
| 0033 | Joint adhesive (401-11526) | LFT | 3,006 | $0.37 | $0.34 | $0.34 | $0.34 | $1.05 |
| 0034 | Asphalt for tack coat (406-05521) | SYS | 7,986 | $0.31 | $0.28 | $0.28 | $0.28 | $0.01 |
| 0035 | Terminal joint, type HMA (503-12477) | LFT | 62 | $250.00 | $430.00 | $344.00 | $530.00 | $150.00 |
| 0036 | Guardrail terminal system, W-beam curved, type 5 (601-01848) | EACH | 1 | $3,190.00 | $3,100.00 | $2,800.00 | $3,100.00 | $2,900.00 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 82 | $31.00 | $27.00 | $20.00 | $27.00 | $28.00 |
| 0038 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $4,015.00 | $2,782.00 | $3,300.00 | $2,782.00 | $3,650.00 |
| 0039 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,465.00 | $3,100.00 | $2,900.00 | $3,100.00 | $3,150.00 |
| 0040 | Barrier delineator (602-06729) | EACH | 14 | $35.00 | $25.00 | $17.00 | $28.00 | $30.00 |
| 0041 | Fence, farm field, 47 in. (603-06040) | LFT | 278 | $34.00 | $29.00 | $15.00 | $29.00 | $30.75 |
| 0042 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 198 | $250.00 | $190.00 | $148.00 | $240.00 | $200.00 |
| 0043 | Right-of-way marker (615-06490) | EACH | 19 | $220.00 | $189.00 | $160.00 | $189.00 | $200.00 |
| 0045 | Benchmark post (615-06530) | EACH | 1 | $825.00 | $400.00 | $1,000.00 | $1,200.00 | $750.00 |
| 0046 | Riprap, class 1 (616-05688) | TON | 1,840 | $95.00 | $82.80 | $85.00 | $110.00 | $82.80 |
| 0047 | Riprap, revetment (616-06405) | TON | 230 | $80.00 | $57.30 | $50.00 | $60.00 | $57.30 |
| 0048 | Geotextile for riprap, type 1A (616-12246) | SYS | 2,494 | $3.50 | $3.98 | $6.00 | $4.00 | $3.98 |
| 0049 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $577.00 | $525.00 | $525.00 | $525.00 | $525.00 |
| 0050 | Sodding (621-06574) | SYS | 82 | $33.00 | $29.95 | $29.95 | $29.95 | $29.95 |
| 0051 | Seed mixture, floodplain (621-12612) | LBS | 105 | $143.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 0052 | Sign, 'DO not spray' (621-52448) | EACH | 14 | $110.00 | $135.00 | $100.00 | $100.00 | $100.00 |
| 0053 | Field office, type A (628-09401) | MOS | 12 | $2,500.00 | $3,600.00 | $2,400.00 | $2,850.00 | $3,000.00 |
| 0054 | Cellular telephone, type A (628-11729) | EACH | 1 | $1,250.00 | $125.00 | $350.00 | $550.00 | $1.00 |
| 0055 | Cellular telephone, additional data (628-11731) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0056 | Cellular telephone, additional minutes (628-11732) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0057 | Cellular telephone service, 1000 min. (628-11782) | MOS | 12 | $150.00 | $50.00 | $300.00 | $125.00 | $1.00 |
| 0058 | Computer system equipment (628-11976) | EACH | 1 | $750.00 | $550.00 | $620.00 | $850.00 | $500.00 |
| 0059 | Computer system (628-11977) | EACH | 1 | $750.00 | $2,400.00 | $2,700.00 | $1,500.00 | $500.00 |
| 0060 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 12 | $225.00 | $146.00 | $220.00 | $200.00 | $120.00 |
| 0061 | Pile shoe, HP 12 X 84 (701-09891) | EACH | 26 | $225.00 | $146.00 | $220.00 | $200.00 | $100.00 |
| 0062 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 702 | $75.00 | $90.00 | $91.00 | $97.00 | $75.00 |
| 0063 | Pile, steel H, HP, 12 X 84 (701-95782) | LFT | 1,105 | $125.00 | $150.00 | $140.00 | $131.00 | $110.00 |
| 0064 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $3,000.00 | $2,130.00 | $1,900.00 | $2,200.00 | $5,000.00 |
| 0065 | Concrete, A, substructure (702-51005) | CYS | 178 | $900.00 | $1,050.00 | $1,050.00 | $975.00 | $750.00 |
| 0066 | Concrete, B, footings (702-51015) | CYS | 8.80 | $1,500.00 | $1,500.00 | $1,520.00 | $2,200.00 | $500.00 |
| 0068 | Reinforcing bars (703-06028) | LBS | 41,766 | $1.50 | $1.23 | $2.10 | $1.50 | $1.25 |
| 0069 | Reinforcing bars, epoxy coated (703-06029) | LBS | 118,228 | $1.50 | $1.34 | $1.80 | $1.60 | $1.45 |
| 0070 | Concrete, C, superstructure (704-51002) | CYS | 337.50 | $1,400.00 | $1,100.00 | $1,250.00 | $1,100.00 | $1,200.00 |
| 0071 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $1,750.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0072 | Railing, concrete type C (706-51020) | CYS | 46.60 | $1,350.00 | $833.00 | $480.00 | $677.00 | $677.00 |
| 0073 | Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865) | LFT | 953 | $675.00 | $560.00 | $510.00 | $572.00 | $800.00 |
| 0074 | Surface seal , structure no. 90-00054 (709-51821) | LS | 1 | $5,000.00 | $1.00 | $4,000.00 | $500.00 | $1.00 |
| 0075 | Structure, reinforced concrete, box sections, 18 FT X 4 FT (714-11091) | LFT | 61 | $2,500.00 | $2,060.00 | $2,500.00 | $2,500.00 | $2,060.00 |
| 0076 | Structure, reinforced concrete, box sections, 18 FT X 8 FT (714-11138) | LFT | 62 | $5,000.00 | $3,486.00 | $4,500.00 | $3,620.00 | $3,486.00 |
| 0077 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 53 | $85.00 | $90.00 | $72.00 | $72.00 | $90.00 |
| 0078 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 115 | $15.00 | $11.00 | $14.00 | $28.00 | $10.00 |
| 0079 | Pipe, roadway drain casting extension (715-10238) | EACH | 4 | $1,000.00 | $1,015.00 | $705.00 | $850.00 | $500.00 |
| 0080 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $500.00 | $1,688.00 | $1,000.00 | $1,000.00 | $1,688.00 |
| 0081 | Geotextile for underdrains, type 2A (718-12307) | SYS | 90 | $3.50 | $5.00 | $8.85 | $10.00 | $10.00 |
| 0082 | Longitudinal grooving (722-12732) | SYS | 996 | $6.00 | $3.50 | $2.00 | $10.00 | $5.00 |
| 0083 | Bearing assembly, elastomeric (726-92406) | EACH | 24 | $2,000.00 | $1,980.00 | $1,900.00 | $1,850.00 | $5,000.00 |
| 0084 | Road closure sign assembly (801-04308) | EACH | 4 | $330.00 | $341.00 | $300.00 | $300.00 | $490.00 |
| 0085 | Detour route marker assembly (801-06625) | EACH | 92 | $105.00 | $181.00 | $95.00 | $95.00 | $197.00 |
| 0086 | Construction sign, type A (801-06640) | EACH | 15 | $220.00 | $264.00 | $200.00 | $200.00 | $253.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $20,000 | $25,000 | $5,200.00 | $5,000.00 | $10,000 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 48 | $24.00 | $17.51 | $22.00 | $22.00 | $26.00 |
| 0089 | Barricade, type III-B (801-07119) | LFT | 48 | $24.00 | $17.51 | $22.00 | $22.00 | $26.00 |
| 0090 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 168 | $25.00 | $20.00 | $24.00 | $20.00 | $23.00 |
| 0091 | Sign, ground mounted, reset (802-91122) | EACH | 8 | $440.00 | $300.00 | $450.00 | $300.00 | $400.00 |
| 0092 | Monument, section corner (615-06527) | EACH | 2 | $770.00 | $940.00 | $750.00 | $940.00 | $700.00 |
| 0093 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 1,503 | $11.80 | $10.75 | $10.75 | $10.75 | $4.00 |
| 0095 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 34 | $65.00 | $42.00 | $43.00 | $58.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.