INDOT contract B-42843-A bid tabulation
BRIDGE SUPERSTRUCTURE REPLACEMENT. Let by Indiana DOT on August 6, 2025, Allen, Fort Wayne. 5 bids received; low bid $862,017 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 06 AUG 2025
- Pay items
- 70
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $862,017 | Low |
| 2 | Miller Bros Construction Inc | $993,597 | +15% |
| 3 | R L McCoy Inc | $1,064,494 | +23% |
| 4 | Milestone Contractors LP | $1,155,932 | +34% |
| 5 | Beaty Construction Inc | $1,295,193 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Miller Bros Construction Inc | 3. R L McCoy Inc | 4. Milestone Contractors LP | 5. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $8,000.00 | $8,800.00 | $12,000 | $15,000 | $10,250 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $42,500 | $49,680 | $53,000 | $57,797 | $64,760 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $17,000 | $2,476.23 | $21,000 | $23,119 | $25,904 |
| 0011 | Pavement removal (202-02240) | SYS | 880 | $40.00 | $42.45 | $40.00 | $73.25 | $40.00 |
| 0012 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $70,000 | $102,721 | $95,000 | $110,301 | $238,193 |
| 0013 | Excavation, common (203-02000) | CYS | 80 | $110.00 | $63.86 | $128.00 | $162.25 | $78.00 |
| 0014 | Borrow (203-02070) | CYS | 170 | $1.00 | $31.32 | $62.00 | $93.25 | $45.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 9,914 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $8,000.00 | $6,975.15 | $5,000.00 | $3,000.00 | $17,250 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 20 | $140.00 | $70.33 | $72.00 | $111.25 | $55.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $10,000 | $9,457.45 | $16,000 | $29,500 | $50,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 681 | $40.00 | $24.67 | $45.00 | $57.25 | $40.25 |
| 0020 | Structure backfill, type 4 (211-09267) | CYS | 20 | $300.00 | $244.50 | $250.00 | $356.50 | $225.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 929 | $5.00 | $5.01 | $4.00 | $6.25 | $5.75 |
| 0022 | Subbase for PCCP (302-06464) | CYS | 62 | $110.00 | $152.22 | $160.00 | $131.00 | $152.50 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 18 | $60.00 | $83.74 | $112.00 | $119.50 | $62.25 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 151 | $30.00 | $32.73 | $30.00 | $29.75 | $37.00 |
| 0025 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 59 | $154.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 0026 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 91 | $115.00 | $105.00 | $105.00 | $105.00 | $105.00 |
| 0027 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 184 | $115.00 | $105.00 | $105.00 | $105.00 | $105.00 |
| 0028 | Joint adhesive, surface (401-10258) | LFT | 536 | $0.58 | $0.53 | $0.53 | $0.53 | $0.53 |
| 0029 | Joint adhesive, intermediate (401-10259) | LFT | 386 | $0.82 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,806 | $0.38 | $0.35 | $0.35 | $0.35 | $0.35 |
| 0031 | Guardrail, remove (601-02241) | LFT | 400 | $5.00 | $4.50 | $4.50 | $4.50 | $8.00 |
| 0032 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,850.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,350.00 |
| 0033 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,245.00 | $2,950.00 | $2,950.00 | $2,950.00 | $3,350.00 |
| 0034 | Sidewalk, concrete (604-06070) | SYS | 113 | $90.00 | $92.00 | $92.00 | $111.50 | $135.00 |
| 0035 | Curb ramp, concrete (604-08086) | SYS | 33 | $135.00 | $216.00 | $216.00 | $194.00 | $206.50 |
| 0036 | Detectable warning surfaces (604-12083) | SYS | 6 | $225.00 | $180.00 | $180.00 | $390.50 | $275.00 |
| 0037 | Curb and gutter, concrete, type C , modified (605-06150) | LFT | 183 | $85.00 | $103.00 | $103.00 | $73.00 | $96.75 |
| 0038 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 252 | $185.00 | $158.78 | $200.00 | $165.00 | $197.50 |
| 0039 | Monument, type B (615-06505) | EACH | 2 | $1,070.00 | $975.00 | $975.00 | $975.00 | $2,000.00 |
| 0040 | Riprap, class 1 (616-05688) | TON | 478 | $75.00 | $90.50 | $110.00 | $73.00 | $91.75 |
| 0041 | Riprap, revetment (616-06405) | TON | 54 | $55.00 | $58.20 | $75.00 | $110.00 | $128.00 |
| 0042 | Geotextile for riprap, type 2A (616-12248) | SYS | 554 | $4.00 | $3.70 | $5.00 | $4.25 | $6.00 |
| 0043 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $2,200.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0044 | Erosion control blanket (621-02770) | SYS | 719 | $2.20 | $3.25 | $3.25 | $3.25 | $3.25 |
| 0045 | Mulched seeding, type U (621-06560) | SYS | 719 | $5.20 | $1.66 | $1.66 | $1.66 | $1.66 |
| 0046 | Water (621-06567) | KGAL | 1 | $0.10 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0047 | Sodding (621-06574) | SYS | 35 | $137.00 | $44.50 | $44.50 | $44.50 | $44.50 |
| 0048 | Field office, type A (628-09401) | MOS | 9 | $2,250.00 | $3,441.66 | $3,650.00 | $3,500.00 | $2,950.00 |
| 0049 | Field drilled hole in concrete (702-51863) | EACH | 132 | $13.00 | $28.44 | $24.00 | $13.50 | $32.00 |
| 0050 | Reinforcing bars, epoxy coated (703-06029) | LBS | 85,617 | $1.30 | $1.47 | $1.35 | $1.75 | $1.55 |
| 0051 | Embedded galvanic anode (703-08247) | EACH | 4 | $43.00 | $39.00 | $39.00 | $21.00 | $39.00 |
| 0052 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 42 | $60.00 | $63.37 | $53.00 | $50.00 | $45.50 |
| 0053 | Concrete, C, superstructure (704-51002) | CYS | 251.50 | $700.00 | $940.85 | $950.00 | $925.00 | $980.00 |
| 0054 | Concrete bridge railing transition, type TTX (706-06372) | EACH | 4 | $2,650.00 | $6,284.87 | $8,000.00 | $6,750.00 | $5,600.00 |
| 0055 | Railing, concrete type TX , modified (706-09965) | LFT | 164 | $160.00 | $324.04 | $400.00 | $480.00 | $265.00 |
| 0056 | Fiber wrap concrete casing system (709-12077) | SFT | 83 | $57.00 | $39.00 | $39.00 | $39.00 | $39.00 |
| 0057 | Surface seal , STR no 1 (709-51821) | LS | 1 | $2,250.00 | $3,954.17 | $1.00 | $1,500.00 | $1.00 |
| 0058 | Patching concrete structures (710-09158) | SFT | 15 | $211.00 | $192.00 | $192.00 | $192.00 | $192.00 |
| 0059 | Pipe, type 4, circular, diameter 12 in. (715-05052) | LFT | 35 | $70.00 | $72.56 | $100.00 | $66.00 | $165.00 |
| 0060 | Casting, manhole, adjust to grade (720-12798) | EACH | 1 | $1,750.00 | $941.40 | $1,000.00 | $575.00 | $950.00 |
| 0061 | Longitudinal grooving (722-12732) | SYS | 396 | $15.00 | $10.20 | $16.00 | $10.00 | $14.50 |
| 0062 | Road closure sign assembly (801-04308) | EACH | 4 | $381.00 | $347.00 | $347.00 | $350.00 | $347.00 |
| 0063 | Detour route marker assembly (801-06625) | EACH | 14 | $195.00 | $178.00 | $178.00 | $150.00 | $178.00 |
| 0064 | Construction sign, type A (801-06640) | EACH | 15 | $276.00 | $251.00 | $251.00 | $200.00 | $251.00 |
| 0065 | Construction sign, type B (801-06645) | EACH | 4 | $138.00 | $126.00 | $126.00 | $150.00 | $126.00 |
| 0066 | Maintaining traffic (801-06775) | LS | 1 | $12,500 | $6,209.42 | $500.00 | $2,000.00 | $45,000 |
| 0067 | Barricade, type III-A (801-07118) | LFT | 48 | $17.00 | $15.74 | $15.74 | $20.00 | $15.74 |
| 0068 | Barricade, type III-B (801-07119) | LFT | 48 | $17.00 | $15.74 | $15.74 | $20.00 | $15.74 |
| 0069 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 760 | $1.17 | $1.07 | $1.07 | $3.50 | $1.07 |
| 0070 | Line, multi-component, broken, yellow, 4 in. (808-10036) | LFT | 95 | $1.70 | $1.57 | $1.57 | $3.50 | $1.57 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.