By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 1 | 33% |
| 2023 | 3 | 0 | 0% |
| 2024 | 6 | 3 | 50% |
| 2025 | 5 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 18 | 16 (89%) | $475.00 | $525.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Sodding | 621-06574 | SYS | 15 | 15 (100%) | $42.50 | $27.00 |
| Barricade, type III-B | 801-07119 | LFT | 15 | 13 (87%) | $15.74 | $16.00 |
| Guardrail, remove | 601-02241 | LFT | 15 | 12 (80%) | $5.00 | $5.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Milestone Contractors LP | 20 | 11 of 20 |
| R L McCoy Inc | 19 | 8 of 19 |
| Duncan Robertson Inc | 6 | 2 of 6 |
| Beaty Construction Inc | 4 | 1 of 4 |
| Pioneer Associates Inc | 4 | 0 of 4 |
| E & B Paving LLC | 4 | 2 of 4 |
| Icc Group Inc | 2 | 0 of 2 |
| Rieth-Riley Construction Co., Inc. | 2 | 1 of 2 |
| Phend & Brown Inc | 1 | 1 of 1 |
| R G Zachrich Construction Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | B-45063-A | Fort Wayne | BRIDGE REPLACEMENT | 3 of 6 | $2,045,212 | +8.0% |
| 08 JUL 2026 | B-44339-A | Fort Wayne | BRIDGE REPLACEMENT | 3 of 6 | $1,421,154 | +20% |
| 08 JUL 2026 | B-45531-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 4 | $1,391,949 | +1.0% |
| 10 DEC 2025 | B-43742-A | Fort Wayne | BRIDGE DECK OVERLAY | 3 of 6 | $7,738,222 | +8.0% |
| 13 NOV 2025 | B-43624-A | Fort Wayne | BRIDGE REPLACEMENT | 4 of 6 | $1,159,916 | +18% |
| 10 SEP 2025 | B-42838-A | Fort Wayne | BRIDGE REPLACEMENT | 3 of 5 | $1,447,167 | +12% |
| 06 AUG 2025 | B-42843-A | Fort Wayne | BRIDGE SUPERSTRUCTURE REPLACEMENT | 2 of 5 | $993,597 | +15% |
| 15 JAN 2025 | B-42842-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 4 | $994,677 | +4.0% |
| 11 DEC 2024 | B-42840-A | Fort Wayne | BRIDGE REPLACEMENT | 3 of 4 | $1,613,785 | +8.0% |
| 14 NOV 2024 | B-41854-A | Fort Wayne | NEW BRIDGE, OTHER | 4 of 4 | $6,587,715 | +27% |
| 09 OCT 2024 | B-42841-A | Fort Wayne | BRIDGE REPLACEMENT | 1 of 6 | $920,166 | Low, 1.0% under the second |
| 14 AUG 2024 | B-42165-A | Fort Wayne | BRIDGE WIDENING, INTERSECTION IMPROVEMENT WITH NEW SIGNALS | 1 of 5 | $4,986,702 | Low, 7.0% under the second |
| 10 APR 2024 | B-42357-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT AND DEBRIS REMOVAL | 3 of 3 | $6,899,746 | +18% |
| 10 APR 2024 | B-42376-A | Fort Wayne | BRIDGE REPLACEMENT | 1 of 3 | $1,697,884 | Low, 1.0% under the second |
| 13 DEC 2023 | B-42839-A | Fort Wayne | BRIDGE REPLACEMENT | 2 of 3 | $1,933,598 | +4.0% |
| 12 APR 2023 | B-41547-A | Fort Wayne | BRIDGE REPLACEMENT | 3 of 3 | $5,069,641 | +9.0% |
| 19 JAN 2023 | B-41140-A | Fort Wayne | BRIDGE DECK REPLACEMENT | 3 of 3 | $1,949,777 | +24% |
| 16 NOV 2022 | B-41545-A | Fort Wayne | BRIDGE REPLACEMENT AND REPLACE SUPERSTRUCTURE | 1 of 3 | $5,985,759 | Low, 7.0% under the second |
| 16 NOV 2022 | B-41847-A | Fort Wayne | NEW BRIDGE CONSTRUCTION | 2 of 4 | $7,698,771 | +5.0% |
| 09 FEB 2022 | B-42474-B | Fort Wayne | BRIDGE REPLACEMENT | 2 of 2 | $1,847,142 | +4.0% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.