By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 118 | 42 | 36% |
| 2023 | 111 | 40 | 36% |
| 2024 | 148 | 46 | 31% |
| 2025 | 106 | 22 | 21% |
| 2026 | 125 | 44 | 35% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| LaPorte | 286 | 103 | 36% |
| Greenfield | 115 | 32 | 28% |
| Crawfordsville | 108 | 36 | 33% |
| Fort Wayne | 58 | 19 | 33% |
| Seymour | 31 | 1 | 3% |
| Crawfordsville, Greenfield | 5 | 2 | 40% |
| Vincennes | 4 | 1 | 25% |
| Fort Wayne, LaPorte | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 583 | 583 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 583 | 583 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 581 | 581 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 520 | 520 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 480 | 480 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 478 | 478 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 457 | 457 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 349 | 349 (100%) | $1.00 | $1.00 |
| Construction sign, type A | 801-06640 | EACH | 413 | 299 (72%) | $199.00 | $200.00 |
| Road closure sign assembly | 801-04308 | EACH | 392 | 298 (76%) | $281.00 | $280.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 407 | 292 (72%) | $475.00 | $525.00 |
| Detour route marker assembly | 801-06625 | EACH | 373 | 268 (72%) | $145.00 | $140.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Milestone Contractors LP | 343 | 173 of 343 |
| E & B Paving LLC | 170 | 105 of 170 |
| F H Paschen S N Nielsen & Associates LLC | 95 | 50 of 95 |
| Superior Construction Co Inc | 94 | 58 of 94 |
| Morphey Construction Inc. | 74 | 31 of 74 |
| Dunnet Bay Construction Company | 72 | 43 of 72 |
| Calumet Civil Contractors Inc | 66 | 40 of 66 |
| Milestone Contractors North Inc | 59 | 29 of 59 |
| Beaty Construction Inc | 56 | 23 of 56 |
| Laporte Construction Company Inc | 45 | 24 of 45 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-39073-A | Greenfield | BIKE AND PEDESTRIAN FACILITIES | 2 of 7 | $2,066,420 | +1.0% |
| 05 NOV 2026 | R-42227-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY | 1 of 7 | $3,622,453 | Low, 4.0% under the second |
| 05 NOV 2026 | R-43809-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 3 of 3 | $8,124,698 | +98% |
| 05 NOV 2026 | R-43915-A | LaPorte | SMALL STRUCTURE PIPE LINING | 4 of 4 | $1,479,514 | +98% |
| 05 NOV 2026 | R-44008-A | LaPorte | BIKE AND PEDESTRIAN FACILITIES | 3 of 3 | $4,291,268 | +10% |
| 05 NOV 2026 | R-44392-A | Crawfordsville | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 4 of 5 | $1,172,716 | +35% |
| 05 NOV 2026 | R-44635-A | LaPorte | HMA OVERLAY, MINOR STRUCTURAL AND BRIDGE THIN DECK OVERLAY | 1 of 2 | $16,813,862 | Low, 3.0% under the second |
| 05 NOV 2026 | R-45794-A | Greenfield | PAVEMENT PATCHING | 3 of 3 | $6,843,450 | +55% |
| 05 NOV 2026 | R-46447-A | LaPorte | SIDEWALK CONSTRUCTION AND DRAINAGE IMPROVEMENTS | 2 of 3 | $1,563,548 | +10% |
| 05 NOV 2026 | B-43912-A | LaPorte | BRIDGE THIN DECK OVERLAY | 4 of 4 | $138,860 | +60% |
| 05 NOV 2026 | B-44260-A | Crawfordsville | BRIDGE DECK OVERLAY AND REHABILITATION OR REPAIR | 4 of 5 | $2,025,425 | +21% |
| 05 NOV 2026 | B-44466-A | Seymour | BRIDGE DECK OVERLAY AND COPING REPLACEMENT | 4 of 7 | $1,409,771 | +10% |
| 05 NOV 2026 | B-45648-A | LaPorte | BRIDGE THIN DECK OVERLAY | 4 of 4 | $504,566 | +18% |
| 05 NOV 2026 | T-46195-A | Crawfordsville | TRAFFIC SIGNALS MODERNIZATION | 1 of 3 | $1,969,089 | Low, 2.0% under the second |
| 07 OCT 2026 | R-43027-C | LaPorte | HMA OVERLAY, SMALL STRUCTURE REPLACEMENT, TRAFFIC SIGNALS | 1 of 2 | $13,597,654 | Low, 18% under the second |
| 07 OCT 2026 | R-43918-A | LaPorte | INTERCHANGE MODIFICATION | 3 of 3 | $7,978,587 | +7.0% |
| 07 OCT 2026 | R-44109-A | LaPorte | INTERSECTION IMPROVEMENT, ROUNDABOUT | 1 of 4 | $3,109,890 | Low, 3.0% under the second |
| 07 OCT 2026 | R-44384-A | Crawfordsville | SLIDE CORRECTION | 2 of 5 | $1,391,265 | +8.0% |
| 07 OCT 2026 | R-44395-A | Crawfordsville | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 3 of 3 | $468,355 | +18% |
| 07 OCT 2026 | R-44564-A | Greenfield | BRIDGE DECK OVERLAY, SMALL STRUCTURES AND DRAINS CONSTR | 1 of 1 | $2,446,125 | Low |
| 07 OCT 2026 | R-44572-A | Fort Wayne | SMALL STRUCTURE PIPE LINING | 3 of 3 | $503,418 | +61% |
| 07 OCT 2026 | R-44607-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 4 | $468,538 | Low, 5.0% under the second |
| 07 OCT 2026 | R-44652-A | LaPorte | HMA OVERLAY, PREVENTIVE MAINTENANCE | 1 of 2 | $3,909,490 | Low, 2.0% under the second |
| 07 OCT 2026 | R-44658-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 4 of 6 | $1,143,494 | +27% |
| 07 OCT 2026 | R-44721-A | Seymour | INTERSECTION MODERNIZATIONS AND MULTI-USE PATH | 2 of 4 | $4,830,306 | +10% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.