F H Paschen S N Nielsen & Associates LLC: INDOT bid record
F H Paschen S N Nielsen & Associates LLC submitted 106 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 26 of them (25%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $165,720,307
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 24 | 9 | 38% |
| 2023 | 25 | 4 | 16% |
| 2024 | 31 | 7 | 23% |
| 2025 | 14 | 4 | 29% |
| 2026 | 12 | 2 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| LaPorte | 101 | 25 | 25% |
| Crawfordsville | 2 | 1 | 50% |
| Fort Wayne | 2 | 0 | 0% |
| Fort Wayne, LaPorte | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 104 | 104 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 104 | 104 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 104 | 104 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 96 | 96 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 94 | 94 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 93 | 93 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 81 | 81 (100%) | $1.00 | $1.00 |
| Road closure sign assembly | 801-04308 | EACH | 77 | 66 (86%) | $282.00 | $280.00 |
| Detour route marker assembly | 801-06625 | EACH | 75 | 65 (87%) | $152.00 | $140.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 86 | 63 (73%) | $500.00 | $525.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 61 | 61 (100%) | $1.00 | $1.00 |
| Construction sign, type A | 801-06640 | EACH | 70 | 58 (83%) | $209.50 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rieth-Riley Construction Co., Inc. | 95 | 45 of 95 |
| Milestone Contractors LP | 55 | 27 of 55 |
| Superior Construction Co Inc | 40 | 22 of 40 |
| Dunnet Bay Construction Company | 39 | 27 of 39 |
| Milestone Contractors North Inc | 15 | 10 of 15 |
| Ellas Construction Company Inc | 14 | 10 of 14 |
| Gariup Construction Co Inc | 13 | 3 of 13 |
| Laporte Construction Company Inc | 11 | 7 of 11 |
| Icc Group Inc | 10 | 5 of 10 |
| Grimmer Construction Inc | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-43809-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 1 of 3 | $4,100,554 | Low, 11% under the second |
| 05 NOV 2026 | R-43915-A | LaPorte | SMALL STRUCTURE PIPE LINING | 3 of 4 | $1,090,806 | +46% |
| 07 OCT 2026 | R-43918-A | LaPorte | INTERCHANGE MODIFICATION | 1 of 3 | $7,430,731 | Low, 0.0% under the second |
| 07 OCT 2026 | R-44109-A | LaPorte | INTERSECTION IMPROVEMENT, ROUNDABOUT | 3 of 4 | $3,287,033 | +6.0% |
| 02 SEP 2026 | R-42311-A | LaPorte | BIKE AND PEDESTRIAN FACILITIES | 2 of 5 | $2,784,812 | +9.0% |
| 02 SEP 2026 | B-44107-A | LaPorte | BRIDGE REPLACEMENT | 4 of 6 | $1,560,821 | +11% |
| 02 SEP 2026 | B-44108-A | LaPorte | BRIDGE REPLACEMENT | 7 of 7 | $2,041,446 | +23% |
| 08 JUL 2026 | B-42442-A | LaPorte | BRIDGE REPLACEMENT | 2 of 4 | $8,262,151 | +2.0% |
| 07 MAY 2026 | R-44001-B | LaPorte | PAVEMENT REPLACEMENT | 3 of 3 | $14,808,993 | +12% |
| 08 APR 2026 | R-43381-A | Fort Wayne, LaPorte | UNBONDED CONCRETE OVERLAY AND SHOULDER REHABILITATION | 3 of 5 | $25,558,472 | +11% |
| 11 FEB 2026 | B-43916-A | LaPorte | REPLACE SUPERSTRUCTURE | 2 of 7 | $1,950,567 | +12% |
| 14 JAN 2026 | B-43431-C | Crawfordsville | TRUSS RECONSTRUCTION OR REPAIR | 2 of 2 | $10,387,053 | +13% |
| 10 DEC 2025 | B-43917-A | LaPorte | REPLACE SUPERSTRUCTURE, BRIDGE DECK OVERLAY AND PIPE LINING | 3 of 5 | $10,411,064 | +7.0% |
| 13 NOV 2025 | R-43902-A | LaPorte | SMALL STRUCTURE PIPE LINING | 7 of 7 | $1,322,000 | +30% |
| 13 NOV 2025 | R-45408-A | LaPorte | AUXILIARY LANES, TWO-WAY LEFT TURN LANES | 3 of 3 | $10,986,891 | +16% |
| 08 OCT 2025 | B-43921-A | LaPorte | BRIDGE DECK REPLACEMENT | 1 of 5 | $2,322,506 | Low, 6.0% under the second |
| 07 MAY 2025 | R-35981-A | LaPorte | ADDED TRAVEL LANES | 1 of 4 | $16,480,172 | Low, 10% under the second |
| 07 MAY 2025 | B-41844-A | LaPorte | GRADE SEPARATION AND NEW BRIDGE | 1 of 4 | $11,592,365 | Low, 3.0% under the second |
| 07 MAY 2025 | B-41850-A | LaPorte | NEW BRIDGE CONSTRUCTION AND GRADE SEPARATION | 1 of 4 | $17,446,034 | Low, 0.0% under the second |
| 07 MAY 2025 | B-43636-A | LaPorte | BRIDGE AND ROAD REPLACEMENT | 3 of 5 | $13,894,516 | +14% |
| 12 MAR 2025 | R-41437-A | LaPorte | AUXILIARY LANES AND TWO-WAY LEFT TURN LANES | 3 of 3 | $36,848,125 | +26% |
| 12 MAR 2025 | B-43364-A | LaPorte | REPLACE SUPERSTRUCTURE | 2 of 5 | $3,761,005 | +3.0% |
| 12 FEB 2025 | R-43358-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 2 of 3 | $2,109,284 | +36% |
| 15 JAN 2025 | R-43004-A | LaPorte | CONCRETE PAVEMENT RESTORATION AND BRIDGE DECK REPLACEMENT | 4 of 5 | $12,097,313 | +13% |
| 15 JAN 2025 | B-42829-A | LaPorte | BRIDGE REPLACEMENT | 4 of 4 | $3,651,119 | +20% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.