INDOT contract R-43381-A bid tabulation

UNBONDED CONCRETE OVERLAY AND SHOULDER REHABILITATION. Let by Indiana DOT on April 8, 2026, Elkhart, Marshall, Fort Wayne, LaPorte. 5 bids received; low bid $22,992,007 by E & B Paving LLC.

Owner
Indiana DOT
Letting
08 APR 2026
Pay items
160
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E & B Paving LLC$22,992,007Low
2Rieth-Riley Construction Co., Inc.$25,397,998+10%
3F H Paschen S N Nielsen & Associates LLC$25,558,472+11%
4Milestone Contractors LP$26,635,143+16%
5Walsh Construction Company II LLC$28,960,929+26%
INDOT contract R-43381-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E & B Paving LLC2. Rieth-Riley Construction Co., Inc.3. F H Paschen S N Nielsen & Associates LLC4. Milestone Contractors LP5. Walsh Construction Company II LLC
0001Construction engineering (105-06845)LS1$447,609$375,300$1,500,000$355,000$807,739
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, pavement traffic markings (109-09377)DOL1$1.00$1.00$1.00$1.00$1.00
0010Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00
0011Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00
0012Mobilization and demobilization (110-01001)LS1$1,100,000$857,981$1,277,923$1,331,757$1,400,000
0013Clearing right-of-way (201-52370)LS1$440,000$45,000$500,000$296,802$550,000
0014Pavement removal (202-02240)SYS3,944$46.39$32.33$32.24$15.50$55.00
0015Curb and gutter, remove (202-02279)LFT300$13.30$21.74$7.74$17.67$13.00
0016Catch basin, remove (202-02928)EACH1$1,498.90$1,630.80$730.85$600.00$850.00
0017Sign, remove (202-74035)EACH2$221.25$322.74$270.15$250.00$900.00
0018Pipe, remove (202-96133)LFT244$32.52$41.00$41.71$25.00$62.00
0019Fence and posts, remove (202-96430)LS1$47,500$47,500$47,500$47,500$50,000
0020Concrete, remove (202-99080)CYS11$81.66$261.21$172.55$200.00$750.00
0021Excavation, common (203-02000)CYS82,170$32.00$30.85$20.00$31.35$32.00
0022Stormwater management budget (205-12108)DOL140,647.50$1.00$1.00$1.00$1.00$1.00
0023Stormwater management implementation (205-12616)LS1$55,768$85,975$75,000$7,375.00$300,000
0024SWQCP preparation (205-12618)LS1$2,500.00$4,800.00$2,500.00$5,000.00$50,000
0025Subgrade treatment, type II (207-08264)SYS79,395$16.58$21.87$21.08$23.25$28.00
0026Structure backfill, type 2 (211-09265)CYS765$91.07$90.58$89.88$98.00$50.00
0027Geogrid, type IB (214-11796)SYS73,061$7.00$0.74$2.00$5.05$4.00
0028Geotextile for pavement, type 2A (214-12238)SYS20,814$5.26$1.67$3.02$5.00$4.50
0029Geotextile for pavement, type 2B (214-12239)SYS69,909$2.12$2.03$2.76$4.10$4.80
0030Compacted aggregate, no. 2 (301-12231)CYS13$155.20$258.84$181.07$150.00$375.00
0031Compacted aggregate, no. 8 (301-12233)CYS6,951$90.95$87.44$86.85$111.00$120.00
0032Compacted aggregate, no. 53 (301-12234)CYS7,373$137.00$107.17$96.81$95.00$100.00
0033Dense graded subbase (302-07455)CYS169$121.56$135.80$182.50$124.00$190.00
0034Compacted aggregate, no. 53 (303-01180)TON411$17.00$75.16$131.73$52.50$100.00
0035Compacted aggregate, no. 73 (303-07449)TON25,854$17.00$66.46$49.76$35.50$38.00
0036Widening with HMA, type B (304-07493)TON23,553$84.12$110.01$100.49$110.00$120.00
0037HMA patching, full depth, type C (304-12625)TON1,742$158.38$170.02$107.35$240.00$213.42
0038Milling, asphalt removal (306-08039)SYS76,733$8.53$8.62$6.10$13.00$10.00
0039Milling, PCCP , variable depth milling (306-08041)SYS1,600$6.66$11.71$2.22$7.00$5.00
0040Milling, scarification (306-08042)SYS76,733$1.26$1.84$0.85$1.70$2.50
0041Milling, approach (306-08432)SYS307$6.58$13.73$7.79$7.00$6.00
0042QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON609$130.63$175.55$175.55$130.00$177.32
0043QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON1,014$109.26$135.50$136.50$114.00$137.88
0044QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON2,433$90.07$118.40$118.40$104.00$119.60
0045Joint adhesive (401-11526)LFT5,948$1.35$2.00$2.00$1.20$2.02
0046HMA wedge and level, type B (402-07451)TON10,643$86.67$89.65$89.65$93.40$90.56
0047Asphalt for tack coat (406-05520)TON72$1.00$1.00$664.60$1,000.00$671.31
0048QC/QA-PCCP, 10 in. (501-06321)SYS76,733$67.36$77.43$66.00$81.00$78.00
0049Inertial profiler, PCCP (501-12171)LS1$10,958$4,993.39$5,706.71$12,000$34,538
0050D-1 contraction joint (503-05240)LFT46,131$10.74$16.42$15.69$19.50$20.00
0051Guardrail terminal system, W-beam, curved, type 6 (601-01839)EACH1$3,100.00$2,875.00$3,100.00$3,100.00$3,115.58
0052Guardrail terminal system, W-beam, curved, type 3 (601-01846)EACH1$2,950.00$2,650.00$2,950.00$2,950.00$2,964.82
0053Guardrail, W-beam, shop curved, 6 FT 3 in. spacing (601-02103)LFT138$32.00$43.50$32.00$32.00$32.16
0054Guardrail, remove (601-02241)LFT2,125$4.25$3.25$4.25$4.25$4.27
0055Guardrail terminal system, W-beam, curved, type 9 (601-05586)EACH1$3,300.00$3,350.00$3,300.00$3,300.00$3,316.58
0056Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT1,731.25$23.00$23.75$23.00$23.00$23.12
0057Guardrail height transition, MGS (601-12289)EACH4$1,000.00$1,000.00$1,000.00$1,000.00$1,005.03
0058Guardrail end treatment, type OS (601-94689)EACH10$3,000.00$2,550.00$3,000.00$3,000.00$3,015.08
0059Fence, relocate (603-03398)LFT291$42.00$42.00$42.00$42.00$42.21
0060Fence , wood fence and white vinyl fence (603-03829)LFT598$54.00$54.00$54.00$54.00$54.27
0061Fence, farm field, 47 in. (603-06040)LFT2,322$12.50$12.50$12.50$12.50$12.56
0062Fence, farm field, barbed wire , 36 FT, 48 FT and 54 FT fence height (603-06042)LFT3,031$13.25$16.00$16.00$16.00$16.08
0063Fence, chain link, 72 in. (603-92636)LFT818$42.00$42.00$42.00$42.00$42.21
0064Fence gate, farm field, 47 in. X 24 FT (603-96042)EACH3$3,050.00$3,050.00$3,050.00$3,050.00$3,065.33
0065Curb, integral concrete, type B (605-06095)LFT260$125.00$34.69$47.84$34.25$67.59
0066Milled PCCP corrugations, conventional (606-11064)LFT28,861$0.74$0.65$0.55$1.35$1.00
0067Milled HMA corrugations, sinusoidal (606-12400)LFT54,003$0.68$0.56$0.55$0.70$1.00
0068HMA for approaches, type B (610-07487)TON2,659$138.89$136.25$179.20$130.00$146.45
0069PCCP for approaches, 6 in. (610-08446)SYS256$119.08$81.00$141.43$95.00$107.59
0070PCCP for approaches, 9 in. (610-09108)SYS781$116.83$96.92$108.09$113.00$76.67
0071Mailbox assembly, reset, single (611-08232)EACH12$425.00$425.00$425.00$425.00$427.14
0072Mailbox assembly, reset, double (611-08233)EACH3$475.00$475.00$475.00$475.00$477.39
0073Right-of-way marker (615-06490)EACH81$225.00$200.00$225.00$225.00$226.13
0074Monument, type C (615-06510)EACH3$650.00$1,075.00$650.00$650.00$653.27
0075Monument, type D (615-06515)EACH29$200.00$150.00$200.00$200.00$201.01
0076Riprap, class 1 (616-05688)TON160$113.59$125.82$230.16$140.00$100.48
0077Riprap, uniform (616-06451)TON1,256$115.54$74.00$122.83$91.00$54.56
0078Geotextile for riprap, type 2A (616-12248)SYS2,764$9.32$1.19$3.68$5.00$7.62
0079Mobilization and demobilization for seeding (621-01004)EACH3$400.00$400.00$400.00$400.00$400.00
0080Erosion control blanket (621-02770)SYS7,593$1.86$1.86$1.86$1.86$1.86
0081Mulched seeding, type R (621-06559)SYS55,384$0.78$0.78$0.78$0.78$0.78
0082Sodding (621-06574)SYS8,080$7.15$9.35$9.35$7.15$7.15
0083Trash rack (626-08394)EACH2$1,205.48$2,892.72$1,909.56$3,500.00$2,000.00
0084Field office, type D (628-12683)MOS24$4,166.67$5,576.81$3,750.00$5,575.00$4,800.00
0085Topsoil processing and distribution (629-000149)SYS70,026$0.28$8.27$4.62$7.67$10.00
0086Topsoil amendment budget (629-000150)DOL140,052$1.00$1.00$1.00$1.00$1.00
0087Structure, reinforced concrete, box sections, 5 FT X 2 FT (714-11102)LFT75$1,113.99$854.65$611.41$1,300.00$800.00
0088Pipe end section, diameter 84 in. (715-000098)EACH2$9,099.17$10,093$13,817$11,000$2,000.00
0089Safety metal end section, 4:1, diameter 36 in. (715-02397)EACH6$6,336.01$6,411.36$4,426.03$7,500.00$4,800.00
0090Safety metal end section, 4:1, diameter 42 in. (715-02399)EACH2$7,646.71$7,824.50$4,900.80$8,000.00$2,250.00
0091Safety metal end section, 4:1, diameter 15 in. (715-03475)EACH46$1,888.19$1,420.13$1,162.30$2,200.00$1,500.00
0092Safety metal end section, 4:1, diameter 24 in. (715-03476)EACH14$5,200.00$2,641.97$1,818.58$3,500.00$3,500.00
0093Safety metal end section, 4:1, diameter 30 in. (715-03487)EACH12$4,833.24$5,036.89$3,542.93$5,000.00$4,400.00
0094Safety metal end section, 4:1, diameter 18 in. (715-03584)EACH15$1,888.00$2,007.30$1,393.68$2,500.00$2,000.00
0095Pipe end section, diameter 42 in. (715-04522)EACH1$2,993.87$3,357.51$3,983.59$5,000.00$12,000
0096Safety metal end section, 4:1, diameter 12 in. (715-04611)EACH28$2,600.00$1,420.13$1,148.63$1,300.00$900.00
0097Pipe, type 1, circular, diameter 36 in. (715-05019)LFT72$243.71$207.94$181.83$200.00$200.00
0098Pipe, type 2, circular, diameter 36 in. (715-05024)LFT107$223.60$199.73$206.54$220.00$270.00
0099Pipe, type 4, circular, diameter 6 in. (715-05048)LFT100$93.55$118.33$77.36$20.00$54.00
0100Pipe, type 4, circular, diameter 8 in. (715-05049)LFT100$94.47$121.09$78.28$28.00$58.00
0101Pipe, type 4, circular, diameter 10 in. (715-05051)LFT100$96.92$124.04$80.73$40.00$90.00
0102Pipe, type 4, circular, diameter 12 in. (715-05052)LFT100$98.16$124.02$81.97$55.00$102.00
0103Pipe, type 1, circular, diameter 15 in. (715-05119)LFT139$129.17$99.21$79.51$110.00$75.00
0104Pipe, type 1, circular, diameter 18 in. (715-05121)LFT88$109.32$95.24$84.17$125.00$87.00
0105Pipe, type 1, circular, diameter 24 in. (715-05123)LFT112$211.48$120.99$116.48$135.00$170.00
0106Pipe, type 1, circular, diameter 30 in. (715-05125)LFT109$238.00$170.91$138.79$175.00$165.00
0107Pipe, type 1, circular, diameter 42 in. (715-05127)LFT42$231.10$422.17$496.43$400.00$285.00
0108Pipe, type 1, circular, diameter 84 in. (715-05141)LFT94$628.84$897.96$803.74$1,050.00$1,400.00
0109Pipe, type 2, circular, diameter 6 in. (715-05146)LFT62$187.63$338.81$208.66$65.00$78.00
0110Pipe, type 2, circular, diameter 8 in. (715-05147)LFT11$185.99$543.29$214.96$70.00$92.00
0111Pipe, type 2, circular, diameter 12 in. (715-05149)LFT266$126.29$136.91$83.10$100.00$76.00
0112Pipe, type 2, circular, diameter 15 in. (715-05151)LFT488$107.65$105.51$84.19$108.00$75.00
0113Pipe, type 2, circular, diameter 18 in. (715-05152)LFT92$117.94$115.53$90.62$120.00$90.00
0114Pipe, type 2, circular, diameter 24 in. (715-05154)LFT107$146.40$150.81$102.62$150.00$112.00
0115Pipe, type 2, circular, diameter 30 in. (715-05156)LFT582$159.55$140.88$136.17$190.00$160.00
0116Pipe, type 2, circular, diameter 42 in. (715-05159)LFT11$338.90$429.13$416.67$270.00$280.00
0117Pipe, type 3, circular, diameter 12 in. (715-05168)LFT245$125.00$72.54$71.15$95.00$59.00
0118Pipe, type 3, circular, diameter 15 in. (715-05169)LFT631$110.33$69.01$79.14$110.00$83.00
0119Pipe, type 3, circular, diameter 18 in. (715-05171)LFT134$121.75$107.54$84.05$115.00$80.00
0120Pipe, type 3, circular, diameter 24 in. (715-05173)LFT149$145.90$122.19$108.83$135.00$115.00
0121Pipe, type 3, circular, diameter 30 in. (715-05175)LFT70$192.39$168.45$118.65$165.00$140.00
0122Pipe, type 3, circular, diameter 36 in. (715-05177)LFT29$214.04$277.18$168.32$200.00$260.00
0123Pipe, type 1, deformed, min. area 15.6 SFT (715-05247)LFT61$539.17$555.94$201.52$525.00$230.00
0124Pipe extension, circular, diameter 18 in. , 18 FT pipe extension (715-05596)LFT14$194.40$583.26$315.28$145.00$820.00
0125Pipe extension, circular, diameter 24 in. , 24 FT pipe extension (715-05597)LFT31$189.21$223.36$173.71$175.00$500.00
0126HMA for structure installation, type C (715-08306)TON248$85.00$193.40$193.40$215.00$195.35
0127Video inspection for pipe (715-09064)LFT3,828$1.60$1.60$1.60$1.60$1.80
0128Safety metal end section, 4:1, min. area 12.9 SFT (715-11576)EACH2$4,626.15$5,935.84$1,756.06$4,000.00$2,600.00
0129Pipe end section, diameter 12 in. (715-46000)EACH5$940.19$2,311.56$815.72$950.00$865.00
0130Pipe end section, diameter 18 in. (715-46010)EACH3$1,186.39$2,635.05$916.61$1,400.00$1,200.00
0131Pipe end section, diameter 24 in. (715-46020)EACH3$1,645.76$3,054.07$1,220.43$1,800.00$1,600.00
0132Pipe end section, diameter 36 in. (715-46040)EACH2$2,385.56$4,324.17$2,837.06$3,900.00$2,500.00
0133Casting, inlet, adjust to grade (720-12797)EACH1$1,623.33$1,139.36$1,884.10$1,200.00$900.00
0134Pipe catch basin, 12 in. (720-45260)EACH1$2,824.20$2,962.54$11,369$2,850.00$5,900.00
0135Manhole, type C4, modified (720-45510)EACH1$6,007.48$5,957.56$9,372.41$6,500.00$5,700.00
0136Manhole, type D2 (720-92025)EACH8$10,200$4,607.13$10,812$11,000$6,400.00
0137Manhole, type C2, modified (720-97865)EACH32$5,683.82$4,579.99$6,012.22$5,600.00$6,000.00
0138Manhole, type E2 (720-98068)EACH2$9,227.93$9,364.07$24,756$7,500.00$9,000.00
0139Road closure sign assembly (801-04308)EACH16$653.00$288.00$288.00$625.00$288.00
0140Detour route marker assembly (801-06625)EACH50$216.00$164.00$164.00$319.00$164.00
0141Construction sign, type A (801-06640)EACH24$315.00$224.00$224.00$450.00$224.00
0142Construction sign, type B (801-06645)EACH6$124.00$112.00$112.00$319.00$112.00
0143Maintaining traffic (801-06775)LS1$511,098$485,980$1,574,508$136,958$800,000
0144Barricade, type III-B (801-07119)LFT300$33.00$16.88$16.88$34.00$16.88
0145Temporary traffic barrier, anchored, type 2 (801-08508)LFT931$25.00$60.00$55.00$32.50$80.00
0146Sign, panel, remove (802-03783)EACH1$1,508.65$1,437.91$2,500.00$2,200.00$2,352.01
0147Sign post, square, type 2, reinforced anchor base (802-05702)LFT650$22.00$23.00$22.00$16.00$22.11
0148Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT558$28.00$26.00$28.00$21.00$28.14
0149Retro-reflectivity testing (808-09381)LS1$2,000.00$2,000.00$2,000.00$4,000.00$2,000.00
0150Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038)LFT471$14.00$9.44$9.44$15.00$9.44
0151Line, multi-component, solid, white, 6 in. (808-10049)LFT60,286$0.40$0.84$0.84$1.05$0.84
0152Line, multi-component, solid, yellow, 6 in. (808-10057)LFT23,587$0.40$0.84$0.84$1.05$0.84
0153Grooving for pavement markings (808-12032)LFT89,707$0.38$0.65$0.65$0.61$0.65
0154Line, multi-component, solid, white, 10 in. (808-12781)LFT974$1.00$1.79$1.79$2.00$1.79
0155Line, multi-component, broken, yellow, 6 in. (808-12841)LFT4,860$0.40$0.84$0.84$1.10$0.84
0156Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297)LFT226$14.00$10.02$10.02$15.00$10.02
0157Snowplowable raised pavement marker, remove (808-75996)EACH405$7.00$18.00$18.00$22.25$18.00
0158Snowplowable raised pavement marker (808-75998)EACH405$20.00$38.00$38.00$70.00$38.00
0159Pump around (205-11626)EACH1$16,806$26,635$27,668$25,000$50,000
0160Seed mixture, floodplain (621-12612)LBS28$200.00$200.00$200.00$200.00$200.00
INDOT contract R-43381-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy