INDOT contract R-43381-A bid tabulation
UNBONDED CONCRETE OVERLAY AND SHOULDER REHABILITATION. Let by Indiana DOT on April 8, 2026, Elkhart, Marshall, Fort Wayne, LaPorte. 5 bids received; low bid $22,992,007 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 08 APR 2026
- Pay items
- 160
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $22,992,007 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $25,397,998 | +10% |
| 3 | F H Paschen S N Nielsen & Associates LLC | $25,558,472 | +11% |
| 4 | Milestone Contractors LP | $26,635,143 | +16% |
| 5 | Walsh Construction Company II LLC | $28,960,929 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Rieth-Riley Construction Co., Inc. | 3. F H Paschen S N Nielsen & Associates LLC | 4. Milestone Contractors LP | 5. Walsh Construction Company II LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $447,609 | $375,300 | $1,500,000 | $355,000 | $807,739 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $1,100,000 | $857,981 | $1,277,923 | $1,331,757 | $1,400,000 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $440,000 | $45,000 | $500,000 | $296,802 | $550,000 |
| 0014 | Pavement removal (202-02240) | SYS | 3,944 | $46.39 | $32.33 | $32.24 | $15.50 | $55.00 |
| 0015 | Curb and gutter, remove (202-02279) | LFT | 300 | $13.30 | $21.74 | $7.74 | $17.67 | $13.00 |
| 0016 | Catch basin, remove (202-02928) | EACH | 1 | $1,498.90 | $1,630.80 | $730.85 | $600.00 | $850.00 |
| 0017 | Sign, remove (202-74035) | EACH | 2 | $221.25 | $322.74 | $270.15 | $250.00 | $900.00 |
| 0018 | Pipe, remove (202-96133) | LFT | 244 | $32.52 | $41.00 | $41.71 | $25.00 | $62.00 |
| 0019 | Fence and posts, remove (202-96430) | LS | 1 | $47,500 | $47,500 | $47,500 | $47,500 | $50,000 |
| 0020 | Concrete, remove (202-99080) | CYS | 11 | $81.66 | $261.21 | $172.55 | $200.00 | $750.00 |
| 0021 | Excavation, common (203-02000) | CYS | 82,170 | $32.00 | $30.85 | $20.00 | $31.35 | $32.00 |
| 0022 | Stormwater management budget (205-12108) | DOL | 140,647.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $55,768 | $85,975 | $75,000 | $7,375.00 | $300,000 |
| 0024 | SWQCP preparation (205-12618) | LS | 1 | $2,500.00 | $4,800.00 | $2,500.00 | $5,000.00 | $50,000 |
| 0025 | Subgrade treatment, type II (207-08264) | SYS | 79,395 | $16.58 | $21.87 | $21.08 | $23.25 | $28.00 |
| 0026 | Structure backfill, type 2 (211-09265) | CYS | 765 | $91.07 | $90.58 | $89.88 | $98.00 | $50.00 |
| 0027 | Geogrid, type IB (214-11796) | SYS | 73,061 | $7.00 | $0.74 | $2.00 | $5.05 | $4.00 |
| 0028 | Geotextile for pavement, type 2A (214-12238) | SYS | 20,814 | $5.26 | $1.67 | $3.02 | $5.00 | $4.50 |
| 0029 | Geotextile for pavement, type 2B (214-12239) | SYS | 69,909 | $2.12 | $2.03 | $2.76 | $4.10 | $4.80 |
| 0030 | Compacted aggregate, no. 2 (301-12231) | CYS | 13 | $155.20 | $258.84 | $181.07 | $150.00 | $375.00 |
| 0031 | Compacted aggregate, no. 8 (301-12233) | CYS | 6,951 | $90.95 | $87.44 | $86.85 | $111.00 | $120.00 |
| 0032 | Compacted aggregate, no. 53 (301-12234) | CYS | 7,373 | $137.00 | $107.17 | $96.81 | $95.00 | $100.00 |
| 0033 | Dense graded subbase (302-07455) | CYS | 169 | $121.56 | $135.80 | $182.50 | $124.00 | $190.00 |
| 0034 | Compacted aggregate, no. 53 (303-01180) | TON | 411 | $17.00 | $75.16 | $131.73 | $52.50 | $100.00 |
| 0035 | Compacted aggregate, no. 73 (303-07449) | TON | 25,854 | $17.00 | $66.46 | $49.76 | $35.50 | $38.00 |
| 0036 | Widening with HMA, type B (304-07493) | TON | 23,553 | $84.12 | $110.01 | $100.49 | $110.00 | $120.00 |
| 0037 | HMA patching, full depth, type C (304-12625) | TON | 1,742 | $158.38 | $170.02 | $107.35 | $240.00 | $213.42 |
| 0038 | Milling, asphalt removal (306-08039) | SYS | 76,733 | $8.53 | $8.62 | $6.10 | $13.00 | $10.00 |
| 0039 | Milling, PCCP , variable depth milling (306-08041) | SYS | 1,600 | $6.66 | $11.71 | $2.22 | $7.00 | $5.00 |
| 0040 | Milling, scarification (306-08042) | SYS | 76,733 | $1.26 | $1.84 | $0.85 | $1.70 | $2.50 |
| 0041 | Milling, approach (306-08432) | SYS | 307 | $6.58 | $13.73 | $7.79 | $7.00 | $6.00 |
| 0042 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 609 | $130.63 | $175.55 | $175.55 | $130.00 | $177.32 |
| 0043 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 1,014 | $109.26 | $135.50 | $136.50 | $114.00 | $137.88 |
| 0044 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 2,433 | $90.07 | $118.40 | $118.40 | $104.00 | $119.60 |
| 0045 | Joint adhesive (401-11526) | LFT | 5,948 | $1.35 | $2.00 | $2.00 | $1.20 | $2.02 |
| 0046 | HMA wedge and level, type B (402-07451) | TON | 10,643 | $86.67 | $89.65 | $89.65 | $93.40 | $90.56 |
| 0047 | Asphalt for tack coat (406-05520) | TON | 72 | $1.00 | $1.00 | $664.60 | $1,000.00 | $671.31 |
| 0048 | QC/QA-PCCP, 10 in. (501-06321) | SYS | 76,733 | $67.36 | $77.43 | $66.00 | $81.00 | $78.00 |
| 0049 | Inertial profiler, PCCP (501-12171) | LS | 1 | $10,958 | $4,993.39 | $5,706.71 | $12,000 | $34,538 |
| 0050 | D-1 contraction joint (503-05240) | LFT | 46,131 | $10.74 | $16.42 | $15.69 | $19.50 | $20.00 |
| 0051 | Guardrail terminal system, W-beam, curved, type 6 (601-01839) | EACH | 1 | $3,100.00 | $2,875.00 | $3,100.00 | $3,100.00 | $3,115.58 |
| 0052 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $2,950.00 | $2,650.00 | $2,950.00 | $2,950.00 | $2,964.82 |
| 0053 | Guardrail, W-beam, shop curved, 6 FT 3 in. spacing (601-02103) | LFT | 138 | $32.00 | $43.50 | $32.00 | $32.00 | $32.16 |
| 0054 | Guardrail, remove (601-02241) | LFT | 2,125 | $4.25 | $3.25 | $4.25 | $4.25 | $4.27 |
| 0055 | Guardrail terminal system, W-beam, curved, type 9 (601-05586) | EACH | 1 | $3,300.00 | $3,350.00 | $3,300.00 | $3,300.00 | $3,316.58 |
| 0056 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,731.25 | $23.00 | $23.75 | $23.00 | $23.00 | $23.12 |
| 0057 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,005.03 |
| 0058 | Guardrail end treatment, type OS (601-94689) | EACH | 10 | $3,000.00 | $2,550.00 | $3,000.00 | $3,000.00 | $3,015.08 |
| 0059 | Fence, relocate (603-03398) | LFT | 291 | $42.00 | $42.00 | $42.00 | $42.00 | $42.21 |
| 0060 | Fence , wood fence and white vinyl fence (603-03829) | LFT | 598 | $54.00 | $54.00 | $54.00 | $54.00 | $54.27 |
| 0061 | Fence, farm field, 47 in. (603-06040) | LFT | 2,322 | $12.50 | $12.50 | $12.50 | $12.50 | $12.56 |
| 0062 | Fence, farm field, barbed wire , 36 FT, 48 FT and 54 FT fence height (603-06042) | LFT | 3,031 | $13.25 | $16.00 | $16.00 | $16.00 | $16.08 |
| 0063 | Fence, chain link, 72 in. (603-92636) | LFT | 818 | $42.00 | $42.00 | $42.00 | $42.00 | $42.21 |
| 0064 | Fence gate, farm field, 47 in. X 24 FT (603-96042) | EACH | 3 | $3,050.00 | $3,050.00 | $3,050.00 | $3,050.00 | $3,065.33 |
| 0065 | Curb, integral concrete, type B (605-06095) | LFT | 260 | $125.00 | $34.69 | $47.84 | $34.25 | $67.59 |
| 0066 | Milled PCCP corrugations, conventional (606-11064) | LFT | 28,861 | $0.74 | $0.65 | $0.55 | $1.35 | $1.00 |
| 0067 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 54,003 | $0.68 | $0.56 | $0.55 | $0.70 | $1.00 |
| 0068 | HMA for approaches, type B (610-07487) | TON | 2,659 | $138.89 | $136.25 | $179.20 | $130.00 | $146.45 |
| 0069 | PCCP for approaches, 6 in. (610-08446) | SYS | 256 | $119.08 | $81.00 | $141.43 | $95.00 | $107.59 |
| 0070 | PCCP for approaches, 9 in. (610-09108) | SYS | 781 | $116.83 | $96.92 | $108.09 | $113.00 | $76.67 |
| 0071 | Mailbox assembly, reset, single (611-08232) | EACH | 12 | $425.00 | $425.00 | $425.00 | $425.00 | $427.14 |
| 0072 | Mailbox assembly, reset, double (611-08233) | EACH | 3 | $475.00 | $475.00 | $475.00 | $475.00 | $477.39 |
| 0073 | Right-of-way marker (615-06490) | EACH | 81 | $225.00 | $200.00 | $225.00 | $225.00 | $226.13 |
| 0074 | Monument, type C (615-06510) | EACH | 3 | $650.00 | $1,075.00 | $650.00 | $650.00 | $653.27 |
| 0075 | Monument, type D (615-06515) | EACH | 29 | $200.00 | $150.00 | $200.00 | $200.00 | $201.01 |
| 0076 | Riprap, class 1 (616-05688) | TON | 160 | $113.59 | $125.82 | $230.16 | $140.00 | $100.48 |
| 0077 | Riprap, uniform (616-06451) | TON | 1,256 | $115.54 | $74.00 | $122.83 | $91.00 | $54.56 |
| 0078 | Geotextile for riprap, type 2A (616-12248) | SYS | 2,764 | $9.32 | $1.19 | $3.68 | $5.00 | $7.62 |
| 0079 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 0080 | Erosion control blanket (621-02770) | SYS | 7,593 | $1.86 | $1.86 | $1.86 | $1.86 | $1.86 |
| 0081 | Mulched seeding, type R (621-06559) | SYS | 55,384 | $0.78 | $0.78 | $0.78 | $0.78 | $0.78 |
| 0082 | Sodding (621-06574) | SYS | 8,080 | $7.15 | $9.35 | $9.35 | $7.15 | $7.15 |
| 0083 | Trash rack (626-08394) | EACH | 2 | $1,205.48 | $2,892.72 | $1,909.56 | $3,500.00 | $2,000.00 |
| 0084 | Field office, type D (628-12683) | MOS | 24 | $4,166.67 | $5,576.81 | $3,750.00 | $5,575.00 | $4,800.00 |
| 0085 | Topsoil processing and distribution (629-000149) | SYS | 70,026 | $0.28 | $8.27 | $4.62 | $7.67 | $10.00 |
| 0086 | Topsoil amendment budget (629-000150) | DOL | 140,052 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0087 | Structure, reinforced concrete, box sections, 5 FT X 2 FT (714-11102) | LFT | 75 | $1,113.99 | $854.65 | $611.41 | $1,300.00 | $800.00 |
| 0088 | Pipe end section, diameter 84 in. (715-000098) | EACH | 2 | $9,099.17 | $10,093 | $13,817 | $11,000 | $2,000.00 |
| 0089 | Safety metal end section, 4:1, diameter 36 in. (715-02397) | EACH | 6 | $6,336.01 | $6,411.36 | $4,426.03 | $7,500.00 | $4,800.00 |
| 0090 | Safety metal end section, 4:1, diameter 42 in. (715-02399) | EACH | 2 | $7,646.71 | $7,824.50 | $4,900.80 | $8,000.00 | $2,250.00 |
| 0091 | Safety metal end section, 4:1, diameter 15 in. (715-03475) | EACH | 46 | $1,888.19 | $1,420.13 | $1,162.30 | $2,200.00 | $1,500.00 |
| 0092 | Safety metal end section, 4:1, diameter 24 in. (715-03476) | EACH | 14 | $5,200.00 | $2,641.97 | $1,818.58 | $3,500.00 | $3,500.00 |
| 0093 | Safety metal end section, 4:1, diameter 30 in. (715-03487) | EACH | 12 | $4,833.24 | $5,036.89 | $3,542.93 | $5,000.00 | $4,400.00 |
| 0094 | Safety metal end section, 4:1, diameter 18 in. (715-03584) | EACH | 15 | $1,888.00 | $2,007.30 | $1,393.68 | $2,500.00 | $2,000.00 |
| 0095 | Pipe end section, diameter 42 in. (715-04522) | EACH | 1 | $2,993.87 | $3,357.51 | $3,983.59 | $5,000.00 | $12,000 |
| 0096 | Safety metal end section, 4:1, diameter 12 in. (715-04611) | EACH | 28 | $2,600.00 | $1,420.13 | $1,148.63 | $1,300.00 | $900.00 |
| 0097 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 72 | $243.71 | $207.94 | $181.83 | $200.00 | $200.00 |
| 0098 | Pipe, type 2, circular, diameter 36 in. (715-05024) | LFT | 107 | $223.60 | $199.73 | $206.54 | $220.00 | $270.00 |
| 0099 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 100 | $93.55 | $118.33 | $77.36 | $20.00 | $54.00 |
| 0100 | Pipe, type 4, circular, diameter 8 in. (715-05049) | LFT | 100 | $94.47 | $121.09 | $78.28 | $28.00 | $58.00 |
| 0101 | Pipe, type 4, circular, diameter 10 in. (715-05051) | LFT | 100 | $96.92 | $124.04 | $80.73 | $40.00 | $90.00 |
| 0102 | Pipe, type 4, circular, diameter 12 in. (715-05052) | LFT | 100 | $98.16 | $124.02 | $81.97 | $55.00 | $102.00 |
| 0103 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 139 | $129.17 | $99.21 | $79.51 | $110.00 | $75.00 |
| 0104 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 88 | $109.32 | $95.24 | $84.17 | $125.00 | $87.00 |
| 0105 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 112 | $211.48 | $120.99 | $116.48 | $135.00 | $170.00 |
| 0106 | Pipe, type 1, circular, diameter 30 in. (715-05125) | LFT | 109 | $238.00 | $170.91 | $138.79 | $175.00 | $165.00 |
| 0107 | Pipe, type 1, circular, diameter 42 in. (715-05127) | LFT | 42 | $231.10 | $422.17 | $496.43 | $400.00 | $285.00 |
| 0108 | Pipe, type 1, circular, diameter 84 in. (715-05141) | LFT | 94 | $628.84 | $897.96 | $803.74 | $1,050.00 | $1,400.00 |
| 0109 | Pipe, type 2, circular, diameter 6 in. (715-05146) | LFT | 62 | $187.63 | $338.81 | $208.66 | $65.00 | $78.00 |
| 0110 | Pipe, type 2, circular, diameter 8 in. (715-05147) | LFT | 11 | $185.99 | $543.29 | $214.96 | $70.00 | $92.00 |
| 0111 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 266 | $126.29 | $136.91 | $83.10 | $100.00 | $76.00 |
| 0112 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 488 | $107.65 | $105.51 | $84.19 | $108.00 | $75.00 |
| 0113 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 92 | $117.94 | $115.53 | $90.62 | $120.00 | $90.00 |
| 0114 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 107 | $146.40 | $150.81 | $102.62 | $150.00 | $112.00 |
| 0115 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 582 | $159.55 | $140.88 | $136.17 | $190.00 | $160.00 |
| 0116 | Pipe, type 2, circular, diameter 42 in. (715-05159) | LFT | 11 | $338.90 | $429.13 | $416.67 | $270.00 | $280.00 |
| 0117 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 245 | $125.00 | $72.54 | $71.15 | $95.00 | $59.00 |
| 0118 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 631 | $110.33 | $69.01 | $79.14 | $110.00 | $83.00 |
| 0119 | Pipe, type 3, circular, diameter 18 in. (715-05171) | LFT | 134 | $121.75 | $107.54 | $84.05 | $115.00 | $80.00 |
| 0120 | Pipe, type 3, circular, diameter 24 in. (715-05173) | LFT | 149 | $145.90 | $122.19 | $108.83 | $135.00 | $115.00 |
| 0121 | Pipe, type 3, circular, diameter 30 in. (715-05175) | LFT | 70 | $192.39 | $168.45 | $118.65 | $165.00 | $140.00 |
| 0122 | Pipe, type 3, circular, diameter 36 in. (715-05177) | LFT | 29 | $214.04 | $277.18 | $168.32 | $200.00 | $260.00 |
| 0123 | Pipe, type 1, deformed, min. area 15.6 SFT (715-05247) | LFT | 61 | $539.17 | $555.94 | $201.52 | $525.00 | $230.00 |
| 0124 | Pipe extension, circular, diameter 18 in. , 18 FT pipe extension (715-05596) | LFT | 14 | $194.40 | $583.26 | $315.28 | $145.00 | $820.00 |
| 0125 | Pipe extension, circular, diameter 24 in. , 24 FT pipe extension (715-05597) | LFT | 31 | $189.21 | $223.36 | $173.71 | $175.00 | $500.00 |
| 0126 | HMA for structure installation, type C (715-08306) | TON | 248 | $85.00 | $193.40 | $193.40 | $215.00 | $195.35 |
| 0127 | Video inspection for pipe (715-09064) | LFT | 3,828 | $1.60 | $1.60 | $1.60 | $1.60 | $1.80 |
| 0128 | Safety metal end section, 4:1, min. area 12.9 SFT (715-11576) | EACH | 2 | $4,626.15 | $5,935.84 | $1,756.06 | $4,000.00 | $2,600.00 |
| 0129 | Pipe end section, diameter 12 in. (715-46000) | EACH | 5 | $940.19 | $2,311.56 | $815.72 | $950.00 | $865.00 |
| 0130 | Pipe end section, diameter 18 in. (715-46010) | EACH | 3 | $1,186.39 | $2,635.05 | $916.61 | $1,400.00 | $1,200.00 |
| 0131 | Pipe end section, diameter 24 in. (715-46020) | EACH | 3 | $1,645.76 | $3,054.07 | $1,220.43 | $1,800.00 | $1,600.00 |
| 0132 | Pipe end section, diameter 36 in. (715-46040) | EACH | 2 | $2,385.56 | $4,324.17 | $2,837.06 | $3,900.00 | $2,500.00 |
| 0133 | Casting, inlet, adjust to grade (720-12797) | EACH | 1 | $1,623.33 | $1,139.36 | $1,884.10 | $1,200.00 | $900.00 |
| 0134 | Pipe catch basin, 12 in. (720-45260) | EACH | 1 | $2,824.20 | $2,962.54 | $11,369 | $2,850.00 | $5,900.00 |
| 0135 | Manhole, type C4, modified (720-45510) | EACH | 1 | $6,007.48 | $5,957.56 | $9,372.41 | $6,500.00 | $5,700.00 |
| 0136 | Manhole, type D2 (720-92025) | EACH | 8 | $10,200 | $4,607.13 | $10,812 | $11,000 | $6,400.00 |
| 0137 | Manhole, type C2, modified (720-97865) | EACH | 32 | $5,683.82 | $4,579.99 | $6,012.22 | $5,600.00 | $6,000.00 |
| 0138 | Manhole, type E2 (720-98068) | EACH | 2 | $9,227.93 | $9,364.07 | $24,756 | $7,500.00 | $9,000.00 |
| 0139 | Road closure sign assembly (801-04308) | EACH | 16 | $653.00 | $288.00 | $288.00 | $625.00 | $288.00 |
| 0140 | Detour route marker assembly (801-06625) | EACH | 50 | $216.00 | $164.00 | $164.00 | $319.00 | $164.00 |
| 0141 | Construction sign, type A (801-06640) | EACH | 24 | $315.00 | $224.00 | $224.00 | $450.00 | $224.00 |
| 0142 | Construction sign, type B (801-06645) | EACH | 6 | $124.00 | $112.00 | $112.00 | $319.00 | $112.00 |
| 0143 | Maintaining traffic (801-06775) | LS | 1 | $511,098 | $485,980 | $1,574,508 | $136,958 | $800,000 |
| 0144 | Barricade, type III-B (801-07119) | LFT | 300 | $33.00 | $16.88 | $16.88 | $34.00 | $16.88 |
| 0145 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 931 | $25.00 | $60.00 | $55.00 | $32.50 | $80.00 |
| 0146 | Sign, panel, remove (802-03783) | EACH | 1 | $1,508.65 | $1,437.91 | $2,500.00 | $2,200.00 | $2,352.01 |
| 0147 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 650 | $22.00 | $23.00 | $22.00 | $16.00 | $22.11 |
| 0148 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 558 | $28.00 | $26.00 | $28.00 | $21.00 | $28.14 |
| 0149 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $4,000.00 | $2,000.00 |
| 0150 | Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038) | LFT | 471 | $14.00 | $9.44 | $9.44 | $15.00 | $9.44 |
| 0151 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 60,286 | $0.40 | $0.84 | $0.84 | $1.05 | $0.84 |
| 0152 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 23,587 | $0.40 | $0.84 | $0.84 | $1.05 | $0.84 |
| 0153 | Grooving for pavement markings (808-12032) | LFT | 89,707 | $0.38 | $0.65 | $0.65 | $0.61 | $0.65 |
| 0154 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 974 | $1.00 | $1.79 | $1.79 | $2.00 | $1.79 |
| 0155 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 4,860 | $0.40 | $0.84 | $0.84 | $1.10 | $0.84 |
| 0156 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 226 | $14.00 | $10.02 | $10.02 | $15.00 | $10.02 |
| 0157 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 405 | $7.00 | $18.00 | $18.00 | $22.25 | $18.00 |
| 0158 | Snowplowable raised pavement marker (808-75998) | EACH | 405 | $20.00 | $38.00 | $38.00 | $70.00 | $38.00 |
| 0159 | Pump around (205-11626) | EACH | 1 | $16,806 | $26,635 | $27,668 | $25,000 | $50,000 |
| 0160 | Seed mixture, floodplain (621-12612) | LBS | 28 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.