INDOT contract B-43917-A bid tabulation
REPLACE SUPERSTRUCTURE, BRIDGE DECK OVERLAY AND PIPE LINING. Let by Indiana DOT on December 10, 2025, Jasper, LaPorte. 5 bids received; low bid $9,685,721 by Superior Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 176
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Superior Construction Co Inc | $9,685,721 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $9,947,699 | +3.0% |
| 3 | F H Paschen S N Nielsen & Associates LLC | $10,411,064 | +7.0% |
| 4 | Dunnet Bay Construction Company | $11,173,635 | +15% |
| 5 | Milestone Contractors LP | $12,554,000 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Construction Co Inc | 2. Rieth-Riley Construction Co., Inc. | 3. F H Paschen S N Nielsen & Associates LLC | 4. Dunnet Bay Construction Company | 5. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $103,472 | $82,000 | $500,000 | $475,000 | $95,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $483,000 | $498,000 | $520,000 | $555,000 | $630,000 |
| 0013 | Clearing and grubbing (201-06587) | ACRE | 1 | $5,000.00 | $19,500 | $19,500 | $19,500 | $7,500.00 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $193,000 | $40,000 | $200,000 | $220,000 | $35,000 |
| 0015 | Pavement removal (202-02240) | SYS | 2,148 | $35.00 | $65.00 | $43.40 | $37.00 | $50.00 |
| 0016 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $500,000 | $85,000 | $150,000 | $151,968 | $105,000 |
| 0017 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $500,000 | $85,000 | $150,000 | $148,485 | $105,000 |
| 0018 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $600,000 | $85,000 | $75,000 | $136,846 | $110,000 |
| 0019 | Present structure, remove portions, structure no. 4 (202-51328) | LS | 1 | $25,000 | $10,000 | $15,000 | $3,020.91 | $15,000 |
| 0020 | Slopewall, remove (202-51368) | SYS | 328 | $80.00 | $25.00 | $29.23 | $55.00 | $115.00 |
| 0021 | Inlet, remove (202-91385) | EACH | 10 | $500.00 | $550.00 | $262.77 | $32.00 | $1,200.00 |
| 0022 | Sign post, channel, remove (202-92607) | EACH | 1 | $75.00 | $100.00 | $263.67 | $75.00 | $250.00 |
| 0023 | Manhole, remove (202-93047) | EACH | 2 | $800.00 | $1,350.00 | $262.78 | $64.00 | $1,500.00 |
| 0024 | Pipe, remove (202-96133) | LFT | 1,119 | $5.00 | $13.40 | $4.54 | $32.00 | $13.50 |
| 0025 | Excavation, common (203-02000) | CYS | 4,649 | $20.00 | $40.00 | $50.00 | $1.00 | $70.00 |
| 0026 | Linear grading (203-08607) | LFT | 222 | $10.00 | $8.68 | $24.47 | $7.00 | $12.50 |
| 0027 | Stormwater management budget (205-12108) | DOL | 50,801 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0028 | Stormwater management implementation (205-12616) | LS | 1 | $24,000 | $15,590 | $5,000.00 | $25,000 | $20,000 |
| 0029 | SWQCP preparation (205-12618) | LS | 1 | $1,900.00 | $6,500.00 | $2,450.00 | $5,400.00 | $5,200.00 |
| 0030 | Subgrade treatment, type IC (207-09935) | SYS | 17,297 | $15.00 | $37.50 | $28.00 | $40.00 | $55.00 |
| 0031 | Aggregate for end bent backfill (211-06467) | CYS | 36 | $120.00 | $135.00 | $110.73 | $275.00 | $245.00 |
| 0032 | Structure backfill, type 1 (211-09264) | CYS | 429 | $45.00 | $1.00 | $78.63 | $88.00 | $100.00 |
| 0034 | Flowable backfill, removable (213-09270) | CYS | 36 | $320.00 | $295.00 | $397.02 | $150.00 | $270.00 |
| 0035 | Geogrid, type IB (214-11796) | SYS | 5,366 | $2.50 | $2.10 | $1.61 | $2.00 | $3.00 |
| 0036 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,353 | $4.00 | $4.50 | $3.41 | $2.80 | $5.00 |
| 0037 | Compacted aggregate, no. 2 (301-12231) | CYS | 4 | $700.00 | $157.47 | $132.81 | $83.00 | $850.00 |
| 0038 | Compacted aggregate, no. 53 (301-12234) | CYS | 133 | $90.00 | $138.00 | $78.39 | $83.00 | $135.00 |
| 0039 | Subbase for PCCP (302-06464) | CYS | 616 | $110.00 | $100.00 | $102.57 | $111.00 | $175.00 |
| 0040 | Compacted aggregate, no. 53 (303-01180) | TON | 1,080 | $20.00 | $56.00 | $40.45 | $44.00 | $60.00 |
| 0041 | HMA patching, full depth, type D (304-12627) | TON | 102 | $250.00 | $180.00 | $416.97 | $208.00 | $350.00 |
| 0042 | HMA patching, partial depth, type D (304-12628) | TON | 44 | $430.00 | $260.00 | $489.14 | $286.00 | $475.00 |
| 0043 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,992 | $10.00 | $4.50 | $2.65 | $12.00 | $6.00 |
| 0044 | Milling, transition (306-08043) | SYS | 163 | $18.00 | $16.00 | $1.33 | $12.00 | $15.00 |
| 0045 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 44 | $310.00 | $310.00 | $310.00 | $310.00 | $440.00 |
| 0046 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 569 | $150.00 | $150.00 | $150.00 | $150.00 | $212.00 |
| 0047 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 166 | $160.00 | $160.00 | $160.00 | $160.00 | $222.00 |
| 0049 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 42 | $240.00 | $240.00 | $240.00 | $240.00 | $400.00 |
| 0053 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 132 | $180.00 | $180.00 | $180.00 | $180.00 | $205.00 |
| 0054 | Joint adhesive (401-11526) | LFT | 14,722 | $0.01 | $0.01 | $0.01 | $0.01 | $2.50 |
| 0055 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 4,470 | $7.25 | $8.00 | $7.25 | $7.25 | $7.25 |
| 0056 | HMA for temporary pavement, type D (402-10087) | TON | 6,089 | $135.00 | $140.00 | $145.86 | $132.00 | $95.00 |
| 0057 | Asphalt for tack coat (406-05521) | SYS | 59,599 | $0.25 | $0.25 | $0.25 | $0.25 | $0.50 |
| 0058 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $3,750.00 |
| 0059 | PCCP, 14 in. (502-06331) | SYS | 926 | $160.00 | $156.00 | $150.00 | $300.00 | $170.00 |
| 0060 | D-1 contraction joint (503-05240) | LFT | 792 | $22.00 | $32.00 | $24.19 | $18.00 | $30.00 |
| 0061 | Terminal joint, type HMA (503-12477) | LFT | 53 | $390.00 | $610.00 | $405.76 | $500.00 | $450.00 |
| 0062 | Terminal joint, type PCCP (503-12478) | LFT | 164 | $280.00 | $420.00 | $272.19 | $280.00 | $325.00 |
| 0063 | Expansion joint with load transfer (503-12479) | LFT | 164 | $60.00 | $60.00 | $68.11 | $16.00 | $50.00 |
| 0064 | Jointed reinforced concrete pavement, 14 in. (503-12505) | SYS | 742 | $180.00 | $225.00 | $166.56 | $250.00 | $220.00 |
| 0065 | Guardrail, remove (601-02241) | LFT | 1,860 | $6.00 | $6.00 | $6.00 | $6.10 | $6.10 |
| 0066 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 488 | $24.00 | $24.00 | $24.00 | $22.00 | $22.00 |
| 0067 | Guardrail, MGS W-beam, double faced, 6 FT 3 in. spacing (601-12284) | LFT | 500 | $32.00 | $32.00 | $32.00 | $31.00 | $31.00 |
| 0068 | Guardrail height transition, MGS (601-12289) | EACH | 8 | $975.00 | $975.00 | $975.00 | $925.00 | $925.00 |
| 0069 | Guardrail transition, MGS with curb (601-12291) | EACH | 8 | $3,600.00 | $3,600.00 | $3,600.00 | $3,525.00 | $3,525.00 |
| 0070 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,550.00 | $3,550.00 | $3,550.00 | $3,500.00 | $3,500.00 |
| 0071 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,250.00 | $3,250.00 | $3,250.00 | $2,400.00 | $2,400.00 |
| 0072 | Guardrail end treatment, type MS (601-94690) | EACH | 2 | $6,000.00 | $6,000.00 | $6,000.00 | $5,600.00 | $5,600.00 |
| 0073 | Barrier delineator (602-06729) | EACH | 42 | $22.61 | $22.61 | $26.93 | $22.61 | $20.00 |
| 0074 | Fence, farm field, reset (603-06060) | LFT | 468 | $14.00 | $14.00 | $14.00 | $14.00 | $16.50 |
| 0075 | Fence, chain link, reset (603-06065) | LFT | 8 | $28.00 | $28.00 | $28.00 | $28.00 | $25.00 |
| 0076 | Curb, integral concrete (605-06090) | LFT | 28 | $100.00 | $75.00 | $70.10 | $76.00 | $80.00 |
| 0077 | Curb, concrete (605-06120) | LFT | 166 | $58.00 | $70.00 | $50.52 | $66.00 | $70.00 |
| 0078 | Curb and gutter, concrete (605-06140) | LFT | 10 | $220.00 | $400.00 | $333.24 | $192.00 | $130.00 |
| 0079 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 199 | $50.00 | $55.00 | $65.16 | $60.00 | $50.00 |
| 0080 | Milled HMA corrugations, conventional (606-12399) | LFT | 3,996 | $0.96 | $0.65 | $0.96 | $4.00 | $1.85 |
| 0081 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 144 | $170.00 | $185.00 | $241.47 | $167.00 | $215.00 |
| 0082 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 232 | $175.00 | $195.00 | $180.30 | $168.00 | $225.00 |
| 0083 | Reinforced concrete bridge approach, 14 in. (609-06262) | SYS | 404 | $195.00 | $210.00 | $165.20 | $198.00 | $230.00 |
| 0084 | Riprap, class 1 (616-05688) | TON | 36 | $180.00 | $160.00 | $169.65 | $181.00 | $315.00 |
| 0085 | Riprap, revetment (616-06405) | TON | 80 | $110.00 | $74.00 | $127.47 | $181.00 | $235.00 |
| 0086 | Slopewall (616-06455) | SYS | 328 | $170.00 | $140.00 | $215.36 | $175.00 | $360.00 |
| 0087 | Geotextile for riprap, type 1A (616-12246) | SYS | 159 | $8.00 | $7.00 | $5.22 | $3.00 | $14.00 |
| 0088 | Geotextile for riprap, type 1B (616-12247) | SYS | 53 | $10.00 | $20.00 | $17.91 | $3.00 | $25.00 |
| 0089 | Inspection hole (616-93772) | EACH | 8 | $450.00 | $200.00 | $520.85 | $250.00 | $130.00 |
| 0090 | Clean steel bridge, partial, QP-2, bridge no. 3 (619-11050) | LS | 1 | $19,000 | $19,000 | $19,000 | $33,000 | $20,654 |
| 0091 | Disposal of cleaning waste, hazardous, bridge no. 3 (619-12459) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $300.00 | $2,174.12 |
| 0092 | Clean steel bridge, top flanges, type QP-2, bridge no. 3 (619-12506) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $13,000 | $1,087.06 |
| 0093 | Coat steel bridge, partial, bridge no. 3 (619-51860) | LS | 1 | $9,000.00 | $9,000.00 | $9,000.00 | $11,000 | $9,783.54 |
| 0094 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $475.00 | $475.00 | $475.00 | $475.00 | $475.00 |
| 0095 | Erosion control blanket (621-02770) | SYS | 2,216 | $2.80 | $2.80 | $2.80 | $2.80 | $2.80 |
| 0096 | Mulched seeding, type R (621-06559) | SYS | 21,965 | $1.48 | $1.48 | $1.48 | $1.48 | $1.48 |
| 0097 | Sodding (621-06574) | SYS | 95 | $29.95 | $29.95 | $29.95 | $29.95 | $29.95 |
| 0098 | Seed mixture, floodplain (621-12612) | LBS | 3 | $311.00 | $311.00 | $311.00 | $311.00 | $311.00 |
| 0099 | Safety terminal, type TL-3 (627-09330) | EACH | 4 | $7,800.00 | $7,800.00 | $7,800.00 | $8,300.00 | $8,300.00 |
| 0100 | Cable barrier system, type TL-4, reset (627-11647) | LFT | 1,896 | $15.00 | $15.00 | $15.00 | $17.00 | $17.00 |
| 0101 | Computer system equipment (628-11976) | EACH | 4 | $500.00 | $700.00 | $1,167.16 | $200.00 | $750.00 |
| 0102 | Field office, type E (628-12684) | MOS | 24 | $2,000.00 | $2,950.00 | $2,586.95 | $3,000.00 | $3,750.00 |
| 0103 | Topsoil processing and distribution (629-000149) | SYS | 17,871 | $5.00 | $16.60 | $2.61 | $2.50 | $6.50 |
| 0104 | Topsoil amendment budget (629-000150) | DOL | 35,742 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0105 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $1,800.00 | $2,200.00 | $1,868.44 | $1,395.00 | $2,000.00 |
| 0106 | Field drilled hole in concrete (702-51863) | EACH | 98 | $30.00 | $45.00 | $20.14 | $52.00 | $35.00 |
| 0107 | Reinforcing bars, epoxy coated (703-06029) | LBS | 156,280 | $1.50 | $2.05 | $1.43 | $1.46 | $1.85 |
| 0108 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 122 | $45.00 | $65.00 | $57.37 | $41.00 | $80.00 |
| 0109 | Concrete, C, superstructure (704-51002) | CYS | 392.60 | $1,600.00 | $1,800.00 | $1,853.57 | $1,004.00 | $1,650.00 |
| 0110 | Railing, concrete type FC (706-11600) | CYS | 3.60 | $3,500.00 | $2,050.00 | $1,875.00 | $720.00 | $2,750.00 |
| 0111 | Railing, concrete type FT (706-11601) | CYS | 34.80 | $878.00 | $878.00 | $878.00 | $540.00 | $878.00 |
| 0112 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 8 | $3,500.00 | $4,650.00 | $4,700.00 | $4,500.00 | $6,000.00 |
| 0113 | Concrete bridge railing transition, type TFT (706-11621) | EACH | 8 | $3,000.00 | $3,000.00 | $3,000.00 | $4,200.00 | $3,000.00 |
| 0114 | Fiber wrap concrete casing system , bridge no. 3 (709-04647) | LS | 1 | $10,000 | $5,100.00 | $4,999.00 | $4,999.00 | $5,000.00 |
| 0115 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $2,500.00 | $500.00 | $2,500.00 | $1.00 | $1.00 |
| 0116 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $1.00 | $1.00 |
| 0117 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $9,500.00 | $9,000.00 | $9,500.00 | $1,500.00 | $9,783.54 |
| 0118 | Surface seal , bridge no. 4 (709-51821) | LS | 1 | $5,500.00 | $5,000.00 | $5,500.00 | $1.00 | $5,435.30 |
| 0119 | Patching concrete structures (710-09158) | SFT | 180 | $160.00 | $215.00 | $209.00 | $209.00 | $160.00 |
| 0120 | Structural steel , bridge no. 3 (711-51038) | LS | 1 | $650,000 | $682,000 | $1,200,000 | $1,040,500 | $1,550,000 |
| 0121 | Drilled hole (711-51864) | EACH | 2,260 | $27.00 | $38.00 | $86.63 | $86.00 | $80.00 |
| 0122 | Jacking and supporting structural steel , bridge no. 3 (711-93035) | LS | 1 | $60,000 | $198,000 | $150,000 | $80,000 | $55,000 |
| 0123 | Temporary bridge and approaches (713-51335) | LS | 1 | $800,000 | $907,000 | $750,000 | $1,201,500 | $1,670,000 |
| 0124 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 1,119 | $30.00 | $90.00 | $75.67 | $122.00 | $60.00 |
| 0125 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 132 | $30.00 | $20.00 | $32.32 | $33.00 | $30.00 |
| 0126 | Concrete anchor, diameter 54 in. (715-06492) | EACH | 1 | $7,000.00 | $5,000.00 | $5,452.56 | $10,000 | $17,500 |
| 0127 | Pipe extension, circular, diameter 6 in. , PVC (715-06566) | LFT | 80 | $20.00 | $60.00 | $46.19 | $18.50 | $60.00 |
| 0128 | Video inspection for pipe (715-09064) | LFT | 1,119 | $2.95 | $6.00 | $3.50 | $3.50 | $2.75 |
| 0129 | Pipe, bridge deck drain system (715-09938) | LS | 1 | $40,000 | $45,600 | $40,726 | $30,000 | $40,000 |
| 0130 | Underdrain outlet cleaning (718-09979) | EACH | 8 | $1,500.00 | $900.00 | $475.00 | $530.00 | $2,000.00 |
| 0131 | Geotextile for underdrains, type 1A (718-12305) | SYS | 510 | $5.00 | $3.50 | $4.01 | $9.50 | $3.50 |
| 0132 | Geotextile for underdrains, type 2B (718-12308) | SYS | 102 | $8.00 | $16.00 | $15.26 | $15.50 | $14.50 |
| 0133 | Aggregate for underdrains (718-52610) | CYS | 57.60 | $50.00 | $135.00 | $145.09 | $118.00 | $100.00 |
| 0134 | Inlet, cap (720-44296) | EACH | 7 | $1,120.00 | $1,600.00 | $1,113.66 | $950.00 | $1,000.00 |
| 0135 | Inlet, type R13 (720-45075) | EACH | 2 | $2,600.00 | $7,550.00 | $5,082.86 | $7,150.00 | $4,250.00 |
| 0136 | Manhole, type C4 (720-45410) | EACH | 2 | $4,400.00 | $8,140.00 | $6,382.79 | $7,300.00 | $4,750.00 |
| 0137 | Inlet, type R13, modified (720-94847) | EACH | 8 | $2,600.00 | $6,860.00 | $4,614.88 | $6,800.00 | $4,500.00 |
| 0138 | Bridge deck overlay, rigid (722-000134) | SYS | 1,566 | $70.00 | $120.00 | $86.67 | $77.00 | $145.00 |
| 0139 | Bridge deck, remove concrete overlay and surface (722-000183) | SYS | 1,509 | $12.00 | $22.00 | $12.77 | $18.50 | $12.00 |
| 0140 | Hydrodemolition (722-01066) | SYS | 1,509 | $75.00 | $98.00 | $68.16 | $79.00 | $60.00 |
| 0141 | Bridge deck overlay budget (722-12380) | DOL | 51,090 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0142 | Longitudinal grooving (722-12732) | SYS | 2,943 | $7.30 | $9.50 | $7.19 | $13.00 | $4.25 |
| 0143 | Bridge deck patching, full depth (722-51401) | SFT | 511 | $20.00 | $55.00 | $129.06 | $100.00 | $30.00 |
| 0144 | Overlay dam (722-51874) | SFT | 55 | $140.00 | $60.00 | $37.34 | $52.00 | $130.00 |
| 0145 | Concrete for patching bridge expansion joint (724-12461) | SFT | 5 | $1,000.00 | $347.00 | $588.26 | $650.00 | $350.00 |
| 0146 | Bridge expansion joint, type PCF (724-12773) | LFT | 60 | $50.00 | $61.00 | $46.07 | $60.00 | $50.00 |
| 0147 | Liner pipe, thermoplastic, circular, 10.9-12.4 SFT (725-12146) | LFT | 150 | $840.00 | $955.00 | $775.00 | $1,230.00 | $873.61 |
| 0148 | Road closure sign assembly (801-04308) | EACH | 6 | $264.00 | $264.00 | $264.00 | $264.00 | $264.00 |
| 0149 | Temporary pavement marking, 6 in. (801-06206) | LFT | 2,906 | $0.39 | $0.39 | $0.39 | $0.39 | $0.39 |
| 0150 | Detour route marker assembly (801-06625) | EACH | 55 | $152.00 | $152.00 | $152.00 | $152.00 | $152.00 |
| 0151 | Construction sign, type A (801-06640) | EACH | 184 | $222.00 | $222.00 | $222.00 | $222.00 | $222.00 |
| 0152 | Construction sign, type B (801-06645) | EACH | 23 | $116.00 | $116.00 | $116.00 | $116.00 | $116.00 |
| 0153 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 183 | $18.91 | $18.91 | $18.91 | $18.91 | $18.91 |
| 0154 | Flashing arrow sign (801-06710) | DAY | 264 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0155 | Maintaining traffic (801-06775) | LS | 1 | $320,000 | $366,000 | $470,301 | $1,000,000 | $430,777 |
| 0156 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $4,000.00 | $6,850.00 | $8,800.00 | $11,000 | $8,700.00 |
| 0157 | Barricade, type III-A (801-07118) | LFT | 132 | $15.41 | $15.41 | $15.41 | $15.41 | $15.41 |
| 0158 | Barricade, type III-B (801-07119) | LFT | 132 | $15.41 | $15.41 | $15.41 | $15.41 | $15.41 |
| 0159 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,980 | $30.00 | $44.00 | $35.56 | $31.00 | $60.00 |
| 0160 | Temporary traffic barrier, type 4 (801-08403) | LFT | 1,066 | $0.01 | $58.00 | $1.00 | $0.01 | $40.00 |
| 0161 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,440 | $32.00 | $52.00 | $45.04 | $34.00 | $95.00 |
| 0162 | Portable changeable message sign (801-11642) | EACH | 16 | $5,491.00 | $5,491.00 | $5,491.00 | $5,491.00 | $54.91 |
| 0163 | Truck mounted attenuator (801-12042) | DAY | 40 | $1,980.00 | $157.00 | $157.00 | $157.00 | $2,500.00 |
| 0164 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 13 | $1,171.00 | $1,171.00 | $1,171.00 | $1,171.00 | $1,171.00 |
| 0165 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 2 | $1,781.00 | $1,781.00 | $1,781.00 | $1,781.00 | $1,781.00 |
| 0166 | Temporary pavement marking, 10 in. (801-12955) | LFT | 15,429 | $0.98 | $0.98 | $0.98 | $0.98 | $0.98 |
| 0167 | Reference post (802-04893) | EACH | 4 | $250.00 | $250.00 | $250.00 | $400.00 | $250.00 |
| 0168 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 42 | $26.00 | $26.00 | $26.00 | $45.00 | $26.00 |
| 0169 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 36 | $26.00 | $26.00 | $26.00 | $41.00 | $26.00 |
| 0170 | Line, remove (808-06716) | LFT | 26,794 | $0.54 | $0.54 | $0.54 | $0.54 | $0.54 |
| 0171 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0172 | Grooving for pavement markings (808-12032) | LFT | 11,365 | $0.64 | $0.64 | $0.64 | $0.64 | $0.64 |
| 0173 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,628 | $1.31 | $1.31 | $1.31 | $1.31 | $1.31 |
| 0174 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,628 | $1.31 | $1.31 | $1.31 | $1.31 | $1.31 |
| 0175 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 5,162 | $6.21 | $6.21 | $6.21 | $6.21 | $6.21 |
| 0176 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 1,341 | $6.39 | $6.39 | $6.39 | $6.39 | $6.39 |
| 0177 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 4,862 | $6.21 | $6.21 | $6.21 | $6.21 | $6.21 |
| 0178 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 34 | $19.20 | $26.00 | $19.20 | $19.20 | $19.20 |
| 0179 | Snowplowable raised pavement marker (808-75998) | EACH | 37 | $74.00 | $74.00 | $74.00 | $74.00 | $74.00 |
| 0180 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 715 | $135.00 | $135.00 | $135.00 | $135.00 | $330.00 |
| 0181 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 2,277 | $100.00 | $100.00 | $100.00 | $100.00 | $257.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.