Superior Construction Co Inc: INDOT bid record
Superior Construction Co Inc submitted 137 bids on Indiana DOT contracts in the data, from 09 FEB 2022 to 07 OCT 2026, and was the low bidder on 38 of them (28%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $280,471,662
- Latest bid
- 07 OCT 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 12 | 5 | 42% |
| 2023 | 13 | 4 | 31% |
| 2024 | 49 | 14 | 29% |
| 2025 | 38 | 9 | 24% |
| 2026 | 25 | 6 | 24% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| LaPorte | 79 | 30 | 38% |
| Greenfield | 33 | 4 | 12% |
| Crawfordsville | 19 | 3 | 16% |
| Fort Wayne | 3 | 0 | 0% |
| Seymour | 2 | 1 | 50% |
| Crawfordsville, Greenfield | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 134 | 134 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 134 | 134 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 133 | 133 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 125 | 125 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 118 | 118 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 116 | 116 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 103 | 103 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 93 | 93 (100%) | $1.00 | $1.00 |
| Construction sign, type A | 801-06640 | EACH | 114 | 86 (75%) | $200.00 | $200.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 114 | 80 (70%) | $500.00 | $525.00 |
| Road closure sign assembly | 801-04308 | EACH | 100 | 80 (80%) | $279.50 | $280.00 |
| Detour route marker assembly | 801-06625 | EACH | 96 | 72 (75%) | $152.00 | $140.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rieth-Riley Construction Co., Inc. | 94 | 36 of 94 |
| Milestone Contractors LP | 87 | 40 of 87 |
| F H Paschen S N Nielsen & Associates LLC | 40 | 18 of 40 |
| Beaty Construction Inc | 34 | 19 of 34 |
| E & B Paving LLC | 32 | 22 of 32 |
| Dunnet Bay Construction Company | 28 | 12 of 28 |
| Icc Group Inc | 22 | 12 of 22 |
| Pontem Contractors Inc | 17 | 9 of 17 |
| Morphey Construction Inc. | 17 | 11 of 17 |
| William Charles Construction Company | 17 | 9 of 17 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | B-42320-A | Greenfield | SCOUR PROTECTION | 2 of 5 | $1,895,376 | +5.0% |
| 07 OCT 2026 | B-43499-A | Greenfield | BRIDGE REPLACEMENT | 2 of 6 | $11,212,008 | +3.0% |
| 07 OCT 2026 | B-44486-A | Greenfield | BRIDGE REPLACEMENT | 2 of 5 | $4,387,052 | +5.0% |
| 07 OCT 2026 | B-44576-A | Greenfield | BRIDGE DECK REPLACEMENT | 3 of 5 | $5,470,352 | +13% |
| 09 SEP 2026 | B-46898-A | LaPorte | IDIQ, BRIDGE MAINTENANCE AND REPAIR | 1 of 1 | $943,753 | Low |
| 02 SEP 2026 | B-44269-A | Greenfield | BRIDGE REHABILITATION OR REPAIR | 6 of 6 | $2,087,000 | +22% |
| 08 JUL 2026 | R-44376-A | Crawfordsville | SMALL STRUCTURE PIPE LINING AND REPLACEMENT | 4 of 6 | $1,599,650 | +13% |
| 08 JUL 2026 | B-42442-A | LaPorte | BRIDGE REPLACEMENT | 4 of 4 | $8,996,387 | +11% |
| 08 JUL 2026 | B-44566-A | Greenfield | BRIDGE DECK REPLACEMENT | 4 of 4 | $11,797,355 | +34% |
| 08 JUL 2026 | B-45347-A | Greenfield | SCOUR PROTECTION | 5 of 6 | $476,788 | +39% |
| 07 MAY 2026 | R-46453-A | Crawfordsville | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 3 | $1,935,552 | Low, 38% under the second |
| 15 APR 2026 | R-41159-A | Greenfield | CONCRETE PAVEMENT RESTORATION, BRIDGE MAINTENANCE AND REPAIR | 4 of 4 | $17,669,132 | +42% |
| 08 APR 2026 | R-43683-A | Crawfordsville | SMALL STRUCTURE REPLACEMENT | 1 of 10 | $741,442 | Low, 2.0% under the second |
| 08 APR 2026 | B-46377-A | LaPorte | IDIQ DISTRICT WIDE BRIDGE MAINTENANCE | 1 of 4 | $729,126 | Low, 6.0% under the second |
| 11 MAR 2026 | B-43609-A | Crawfordsville | BRIDGE DECK REPLACEMENT | 2 of 5 | $9,593,086 | +6.0% |
| 11 MAR 2026 | B-44198-A | LaPorte | BRIDGE DECK OVERLAY | 1 of 3 | $4,236,141 | Low, 4.0% under the second |
| 11 MAR 2026 | B-44666-A | LaPorte | BRIDGE DECK OVERLAY | 4 of 6 | $564,203 | +29% |
| 11 MAR 2026 | B-44998-A | Greenfield | BRIDGE REPLACEMENT | 3 of 6 | $4,610,872 | +10% |
| 11 MAR 2026 | B-46130-A | Crawfordsville | IDIQ, BRIDGE MAINTENANCE | 2 of 3 | $973,694 | +1.0% |
| 11 FEB 2026 | R-43831-A | Crawfordsville | SMALL STRUCTURE MAINTENANCE AND REPAIR | 4 of 6 | $193,000 | +40% |
| 11 FEB 2026 | B-43916-A | LaPorte | REPLACE SUPERSTRUCTURE | 5 of 7 | $2,390,515 | +38% |
| 11 FEB 2026 | B-44426-A | Crawfordsville | BRIDGE MAINTENANCE AND REPAIR | 6 of 9 | $731,798 | +20% |
| 11 FEB 2026 | B-45797-A | Crawfordsville, Greenfield | IDIQ, SOIL NAILED WALL AND MSE REPAIR | 3 of 5 | $2,223,911 | +14% |
| 11 FEB 2026 | B-46167-A | LaPorte | BRIDGE DECK OVERLAY | 1 of 3 | $5,497,573 | Low, 17% under the second |
| 14 JAN 2026 | B-42792-A | Greenfield | BRIDGE DECK REPLACEMENT | 3 of 7 | $2,300,000 | +10% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.