INDOT contract B-44486-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on October 7, 2026, Grant, Howard, Greenfield. 5 bids received; low bid $4,186,356 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 136
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $4,186,356 | Low |
| 2 | Superior Construction Co Inc | $4,387,052 | +5.0% |
| 3 | Icc Group Inc | $4,465,000 | +7.0% |
| 4 | E & B Paving LLC | $4,515,000 | +8.0% |
| 5 | Beaty Construction Inc | $4,579,540 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Superior Construction Co Inc | 3. Icc Group Inc | 4. E & B Paving LLC | 5. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $68,000 | $257,142 | $28,800 | $100,000 | $28,800 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $209,318 | $220,000 | $218,785 | $313,515 | $231,950 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $83,727 | $88,000 | $84,835 | $40,116 | $90,000 |
| 0012 | Structures and obstructions, remove (202-01000) | LS | 1 | $7,600.00 | $2,541.14 | $20,000 | $18,000 | $25,000 |
| 0013 | Pavement removal (202-02240) | SYS | 920 | $57.00 | $24.63 | $50.00 | $25.00 | $50.00 |
| 0014 | Paved side ditch, remove (202-02272) | LFT | 128 | $46.00 | $7.47 | $20.00 | $25.00 | $22.00 |
| 0015 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $45,000 | $259,570 | $147,744 | $100,000 | $70,000 |
| 0016 | Present structure, remove portions, structure no. 4 (202-51328) | LS | 1 | $45,000 | $242,338 | $135,000 | $100,000 | $70,000 |
| 0017 | Present structure, remove portions, structure no. 5 (202-51328) | LS | 1 | $45,000 | $275,394 | $134,000 | $100,000 | $70,000 |
| 0018 | Present structure, remove, structure no. 3 (202-51330) | LS | 1 | $125,000 | $150,000 | $55,000 | $203,864 | $259,000 |
| 0019 | Fence, farm field, remove (202-99187) | LFT | 40 | $45.00 | $23.00 | $23.00 | $23.00 | $15.00 |
| 0020 | Excavation, common (203-02000) | CYS | 1,220 | $123.00 | $34.00 | $90.00 | $120.00 | $50.00 |
| 0021 | Borrow (203-02070) | CYS | 430 | $1.90 | $0.01 | $100.00 | $10.00 | $85.00 |
| 0022 | Linear grading (203-08607) | LFT | 555 | $7.00 | $3.50 | $16.00 | $2.00 | $12.00 |
| 0023 | Pump around (205-11626) | EACH | 1 | $5,500.00 | $1.00 | $19,000 | $16,000 | $5,500.00 |
| 0024 | Stormwater management budget (205-12108) | DOL | 60,600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $11,000 | $25,000 | $23,800 | $35,000 | $50,000 |
| 0026 | SWQCP preparation (205-12618) | LS | 1 | $1,500.00 | $2,100.00 | $3,450.00 | $5,000.00 | $3,200.00 |
| 0027 | Cofferdam , structure no 2 (206-51235) | LS | 1 | $26,000 | $1.00 | $30,000 | $500.00 | $1.00 |
| 0028 | Cofferdam , structure no 4 (206-51235) | LS | 1 | $26,000 | $10,367 | $30,000 | $25,000 | $50,000 |
| 0029 | Cofferdam , structure no 5 (206-51235) | LS | 1 | $26,000 | $1.00 | $30,000 | $500.00 | $1.00 |
| 0030 | Subgrade treatment, type IC (207-09935) | SYS | 3,244 | $46.00 | $20.00 | $50.00 | $50.00 | $58.00 |
| 0031 | Aggregate for end bent backfill (211-06467) | CYS | 44 | $218.00 | $100.00 | $150.00 | $60.00 | $170.00 |
| 0032 | Structure backfill, type 2 (211-09265) | CYS | 48 | $71.00 | $77.00 | $100.00 | $150.00 | $60.00 |
| 0033 | Structure backfill, type 5 (211-09268) | CYS | 60 | $250.00 | $150.00 | $425.00 | $150.00 | $200.00 |
| 0034 | Flowable backfill, removable (213-09270) | CYS | 30 | $260.00 | $180.00 | $350.00 | $500.00 | $205.00 |
| 0035 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,502 | $5.10 | $4.30 | $6.00 | $5.00 | $4.00 |
| 0036 | Compacted aggregate, no. 5 (301-12232) | CYS | 34 | $150.00 | $130.00 | $500.00 | $150.00 | $155.00 |
| 0037 | Compacted aggregate, no. 53 (301-12234) | CYS | 8 | $265.00 | $105.00 | $500.00 | $350.00 | $270.00 |
| 0038 | Subbase for PCCP (302-06464) | CYS | 236 | $251.00 | $80.00 | $105.00 | $150.00 | $220.00 |
| 0039 | Compacted aggregate, no. 53 (303-01180) | TON | 432 | $76.00 | $30.00 | $60.00 | $75.00 | $90.00 |
| 0040 | Milling, transition (306-08043) | SYS | 3,555 | $9.00 | $1.65 | $7.01 | $10.00 | $10.00 |
| 0041 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 147 | $172.00 | $172.00 | $268.00 | $268.00 | $172.00 |
| 0042 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 367 | $149.00 | $149.00 | $265.00 | $265.00 | $149.00 |
| 0043 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 79 | $207.00 | $207.00 | $258.00 | $258.00 | $207.00 |
| 0044 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 269 | $135.00 | $135.00 | $209.00 | $209.00 | $135.00 |
| 0045 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 954 | $119.00 | $119.00 | $150.00 | $150.00 | $119.00 |
| 0046 | Joint adhesive (401-11526) | LFT | 5,618 | $0.50 | $0.50 | $1.25 | $1.25 | $0.50 |
| 0047 | Asphalt for tack coat (406-05521) | SYS | 12,532 | $0.30 | $0.30 | $0.25 | $0.25 | $0.30 |
| 0048 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 1 | $2,500.00 | $2,500.00 | $7,500.00 | $4,500.00 | $2,500.00 |
| 0049 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $2,800.00 | $2,800.00 | $3,270.00 | $3,270.00 | $2,800.00 |
| 0050 | Guardrail, remove (601-02241) | LFT | 1,775 | $6.50 | $6.50 | $9.00 | $9.00 | $6.50 |
| 0051 | Guardrail, reset (601-06035) | LFT | 192 | $10.00 | $10.00 | $23.00 | $23.00 | $10.00 |
| 0052 | Hand dig guardrail post holes (601-09238) | EACH | 4 | $84.00 | $84.00 | $170.00 | $170.00 | $84.00 |
| 0053 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 533 | $25.00 | $25.00 | $30.00 | $30.00 | $25.00 |
| 0054 | Guardrail transition, MGS without curb (601-12292) | EACH | 14 | $3,400.00 | $3,400.00 | $3,435.00 | $3,435.00 | $3,400.00 |
| 0055 | Guardrail end treatment, type OS (601-94689) | EACH | 12 | $3,200.00 | $3,200.00 | $2,760.00 | $2,760.00 | $3,200.00 |
| 0056 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 38 | $25.00 | $25.00 | $30.00 | $30.00 | $25.00 |
| 0057 | Guardrail, W-beam, 3 FT 1.5 in. spacing (601-99106) | LFT | 4 | $42.00 | $42.00 | $38.00 | $38.00 | $42.00 |
| 0058 | Barrier delineator (602-06729) | EACH | 30 | $18.00 | $29.00 | $24.00 | $20.00 | $35.00 |
| 0059 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 954 | $11.00 | $5.04 | $5.88 | $10.00 | $12.00 |
| 0060 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 937 | $175.00 | $135.00 | $190.00 | $150.00 | $250.00 |
| 0061 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $250.00 | $250.00 | $390.00 | $390.00 | $250.00 |
| 0062 | Right-of-way marker (615-06490) | EACH | 10 | $200.00 | $200.00 | $225.00 | $225.00 | $200.00 |
| 0063 | Monument, type B (615-06505) | EACH | 9 | $1,450.00 | $1,450.00 | $1,350.00 | $1,350.00 | $1,450.00 |
| 0064 | Riprap, class 1 (616-05688) | TON | 1,243 | $86.00 | $70.00 | $130.00 | $120.00 | $135.00 |
| 0065 | Riprap, revetment (616-06405) | TON | 560 | $144.00 | $69.00 | $75.00 | $115.00 | $140.00 |
| 0066 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,784 | $5.00 | $1.80 | $6.00 | $2.00 | $2.50 |
| 0067 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $600.00 | $450.00 | $800.00 | $800.00 | $800.00 |
| 0068 | Erosion control blanket (621-02770) | SYS | 2,913 | $1.70 | $3.75 | $2.00 | $2.00 | $2.00 |
| 0069 | Mulched seeding, type R (621-06559) | SYS | 3,335 | $3.25 | $2.15 | $4.00 | $4.00 | $4.00 |
| 0070 | Water (621-06567) | KGAL | 17 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 0071 | Sodding (621-06574) | SYS | 841 | $8.00 | $10.75 | $10.00 | $10.00 | $10.00 |
| 0072 | Seed mixture, emergent wetland (621-06737) | LBS | 3 | $425.00 | $415.00 | $350.00 | $350.00 | $350.00 |
| 0073 | Seed mixture, floodplain (621-12612) | LBS | 7 | $240.00 | $420.00 | $300.00 | $300.00 | $300.00 |
| 0074 | Sign, 'DO not spray' (621-52448) | EACH | 4 | $200.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 0075 | Herbicide treatment (624-92647) | ACRE | 1 | $5,800.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0076 | Field office, type C (628-09403) | MOS | 24 | $4,100.00 | $2,300.00 | $2,147.08 | $3,000.00 | $3,500.00 |
| 0077 | Topsoil processing and distribution (629-000149) | SYS | 1,323 | $18.00 | $7.00 | $21.59 | $4.00 | $20.00 |
| 0078 | Topsoil amendment budget (629-000150) | DOL | 2,646 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0079 | Test pile, indicator, production (701-09558) | LFT | 74 | $141.00 | $210.00 | $95.00 | $95.00 | $60.00 |
| 0080 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 14 | $241.00 | $95.00 | $140.00 | $500.00 | $150.00 |
| 0081 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 324 | $125.00 | $92.00 | $110.00 | $90.00 | $135.00 |
| 0082 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 12 | $1,900.00 | $1,500.00 | $2,500.00 | $2,000.00 | $1,650.00 |
| 0083 | Field drilled hole in concrete (702-51863) | EACH | 1,180 | $11.00 | $16.00 | $37.00 | $10.00 | $35.00 |
| 0084 | Concrete, C, substructure (702-92857) | CYS | 39.80 | $1,300.00 | $875.00 | $905.00 | $1,000.00 | $1,600.00 |
| 0085 | Reinforcing bars, epoxy coated (703-06029) | LBS | 143,271 | $2.10 | $1.40 | $1.75 | $2.00 | $1.75 |
| 0086 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 54 | $47.00 | $43.00 | $60.00 | $20.00 | $55.00 |
| 0087 | Concrete, C, superstructure (704-51002) | CYS | 221.40 | $1,900.00 | $1,400.00 | $1,700.00 | $1,000.00 | $1,750.00 |
| 0088 | Railing, concrete type FC (706-09960) | LFT | 172 | $124.00 | $88.00 | $88.00 | $100.00 | $120.00 |
| 0089 | Railing, concrete type FC , modified (706-09960) | LFT | 335 | $140.00 | $97.00 | $97.00 | $100.00 | $155.00 |
| 0090 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,900.00 | $2,000.00 | $2,000.00 | $2,000.00 | $3,200.00 |
| 0091 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 12 | $2,900.00 | $2,000.00 | $2,000.00 | $2,000.00 | $3,500.00 |
| 0092 | Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865) | LFT | 342 | $810.00 | $805.00 | $1,081.05 | $1,200.00 | $1,100.00 |
| 0093 | Surface seal , structure no 2 (709-51821) | LS | 1 | $1,000.00 | $3,081.00 | $2,551.03 | $5,000.00 | $1.00 |
| 0094 | Surface seal , structure no 3 (709-51821) | LS | 1 | $1,000.00 | $3,128.00 | $2,979.61 | $1.00 | $1.00 |
| 0095 | Surface seal , structure no 4 (709-51821) | LS | 1 | $1,000.00 | $3,077.00 | $1,969.51 | $5,000.00 | $1.00 |
| 0096 | Surface seal , structure no 5 (709-51821) | LS | 1 | $1,000.00 | $3,041.00 | $1,908.06 | $5,000.00 | $1.00 |
| 0097 | Patching concrete structures (710-09158) | SFT | 190 | $176.00 | $176.00 | $75.00 | $176.00 | $75.00 |
| 0098 | Waterproofing membrane, type 3 (714-000087) | SFT | 756 | $8.50 | $2.10 | $13.42 | $10.00 | $15.00 |
| 0099 | Structure, coated reinforced concrete, box sections, 5 FT X 3 FT (714-12499) | LFT | 54 | $1,520.00 | $1,200.00 | $1,500.00 | $2,375.00 | $1,200.00 |
| 0100 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 82 | $178.00 | $92.00 | $160.00 | $200.00 | $190.00 |
| 0101 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 122 | $31.00 | $12.00 | $50.00 | $15.00 | $7.00 |
| 0102 | Geotextile for underdrains, type 1A (718-12305) | SYS | 128 | $5.00 | $5.00 | $5.00 | $5.00 | $2.75 |
| 0103 | Inlet, type F7 (720-45035) | EACH | 1 | $5,350.00 | $3,500.00 | $12,000 | $5,000.00 | $4,800.00 |
| 0104 | Manhole, type C4 (720-45410) | EACH | 1 | $5,840.00 | $3,500.00 | $8,000.00 | $5,000.00 | $5,200.00 |
| 0105 | Hydrodemolition (722-01066) | SYS | 1,161 | $113.00 | $100.00 | $80.00 | $125.00 | $100.00 |
| 0106 | Bridge deck overlay budget (722-12380) | DOL | 24,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0107 | Bridge deck, remove concrete surface (722-12464) | SYS | 1,161 | $19.00 | $13.00 | $30.00 | $15.00 | $30.00 |
| 0108 | Longitudinal grooving (722-12732) | SYS | 2,549 | $8.36 | $4.31 | $9.10 | $7.50 | $5.00 |
| 0109 | Bridge deck patching, full depth (722-51401) | SFT | 150 | $42.00 | $100.00 | $170.00 | $20.00 | $100.00 |
| 0110 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,267 | $140.00 | $105.00 | $150.00 | $125.00 | $150.00 |
| 0111 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 3 | $60.00 | $60.00 | $50.00 | $60.00 | $50.00 |
| 0112 | Epoxy injection, crack preparation (727-90308) | LFT | 200 | $102.00 | $102.00 | $49.92 | $102.00 | $49.92 |
| 0113 | Epoxy injection, furnishing equipment , structure no 2 (727-93560) | LS | 1 | $300.00 | $300.00 | $1,500.00 | $300.00 | $1,500.00 |
| 0114 | Epoxy injection, furnishing equipment , structure no 4 (727-93560) | LS | 1 | $300.00 | $300.00 | $1,500.00 | $300.00 | $1,500.00 |
| 0115 | Epoxy injection, furnishing equipment , structure no 5 (727-93560) | LS | 1 | $300.00 | $300.00 | $1,500.00 | $300.00 | $1,500.00 |
| 0116 | Road closure sign assembly (801-04308) | EACH | 29 | $300.00 | $235.00 | $235.00 | $235.00 | $235.00 |
| 0117 | Detour route marker assembly (801-06625) | EACH | 134 | $130.00 | $122.00 | $122.00 | $122.00 | $122.00 |
| 0118 | Construction sign, type A (801-06640) | EACH | 60 | $180.00 | $189.00 | $189.00 | $189.00 | $189.00 |
| 0119 | Construction sign, type B (801-06645) | EACH | 10 | $110.00 | $101.00 | $101.00 | $101.00 | $101.00 |
| 0120 | Maintaining traffic (801-06775) | LS | 1 | $41,446 | $300,000 | $4,500.00 | $100,000 | $90,000 |
| 0121 | Barricade, type III-A (801-07118) | LFT | 352 | $16.00 | $17.61 | $17.61 | $17.61 | $17.61 |
| 0122 | Barricade, type III-B (801-07119) | LFT | 708 | $16.00 | $17.61 | $17.61 | $17.61 | $17.61 |
| 0123 | Reference post (802-04893) | EACH | 4 | $230.00 | $230.00 | $315.00 | $315.00 | $230.00 |
| 0124 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 72 | $29.00 | $29.00 | $25.50 | $25.50 | $29.00 |
| 0125 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 208 | $17.00 | $17.00 | $18.50 | $18.50 | $17.00 |
| 0126 | Sign, sheet, and supports, remove (802-07059) | EACH | 3 | $62.00 | $62.00 | $125.00 | $125.00 | $62.00 |
| 0127 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 147 | $33.00 | $33.00 | $25.00 | $25.50 | $33.00 |
| 0128 | Sign, ground mounted, reset (802-91122) | EACH | 1 | $400.00 | $230.00 | $230.00 | $230.00 | $350.00 |
| 0129 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 3,473 | $1.00 | $0.89 | $0.89 | $0.89 | $0.89 |
| 0130 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,064 | $1.00 | $0.89 | $0.89 | $0.89 | $0.89 |
| 0131 | Grooving for pavement markings (808-12032) | LFT | 2,656 | $0.50 | $0.91 | $0.91 | $0.91 | $0.91 |
| 0132 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 30 | $0.90 | $2.01 | $2.01 | $2.01 | $2.01 |
| 0133 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 378 | $1.50 | $1.21 | $1.21 | $1.21 | $1.21 |
| 0134 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 240 | $0.85 | $0.45 | $0.45 | $0.45 | $0.45 |
| 0135 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 6 | $82.14 | $29.00 | $29.00 | $5.00 | $29.00 |
| 0136 | Snowplowable raised pavement marker (808-75998) | EACH | 6 | $80.00 | $167.00 | $167.00 | $167.00 | $167.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.