INDOT contract B-44576-A bid tabulation
BRIDGE DECK REPLACEMENT. Let by Indiana DOT on October 7, 2026, Marion, Greenfield. 5 bids received; low bid $4,838,321 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 109
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $4,838,321 | Low |
| 2 | Milestone Contractors LP | $5,395,334 | +12% |
| 3 | Superior Construction Co Inc | $5,470,352 | +13% |
| 4 | Beaty Construction Inc | $5,821,457 | +20% |
| 5 | E & B Paving LLC | $6,146,500 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. Superior Construction Co Inc | 4. Beaty Construction Inc | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $12,000 | $36,000 | $22,375 | $30,000 | $100,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $241,916 | $201,871 | $270,000 | $291,072 | $307,325 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $24,192 | $15,000 | $22,500 | $29,107 | $30,735 |
| 0012 | Pavement removal (202-02240) | SYS | 1,474 | $15.01 | $50.00 | $17.50 | $36.00 | $37.00 |
| 0013 | Remove , trash can (202-06541) | EACH | 1 | $604.17 | $2,500.00 | $500.00 | $700.00 | $200.00 |
| 0014 | Remove , cathodic protection (202-07003) | LS | 1 | $2,800.00 | $5,000.00 | $10,000 | $2,800.00 | $6,350.00 |
| 0015 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $267,940 | $405,671 | $357,591 | $235,000 | $505,000 |
| 0016 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $551,589 | $426,343 | $875,000 | $417,217 | $750,000 |
| 0017 | Sidewalk concrete, remove (202-52710) | SYS | 253 | $20.60 | $35.00 | $35.00 | $25.00 | $22.00 |
| 0018 | Bridge railing, remove (202-62420) | LFT | 169 | $62.48 | $72.00 | $25.00 | $33.00 | $18.00 |
| 0019 | Impact attenuator, remove (202-95027) | EACH | 3 | $700.00 | $850.00 | $700.00 | $1,800.00 | $1,000.00 |
| 0020 | Excavation, common (203-02000) | CYS | 179 | $122.86 | $52.00 | $100.00 | $44.00 | $225.00 |
| 0021 | Stormwater management budget (205-12108) | DOL | 2,240 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $6,691.72 | $1,500.00 | $7,500.00 | $18,000 | $10,000 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 995 | $46.99 | $70.00 | $38.50 | $70.50 | $53.00 |
| 0024 | Aggregate for end bent backfill (211-06467) | CYS | 31 | $301.48 | $200.00 | $75.00 | $400.00 | $221.00 |
| 0025 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,588 | $3.45 | $5.00 | $2.50 | $6.00 | $4.00 |
| 0026 | Compacted aggregate, no. 2 (301-12231) | CYS | 0.50 | $1,258.58 | $2,000.00 | $1,500.00 | $550.00 | $885.00 |
| 0027 | Compacted aggregate, no. 53 (301-12234) | CYS | 68 | $164.15 | $150.00 | $105.00 | $152.25 | $122.00 |
| 0028 | Subbase for PCCP (302-06464) | CYS | 289 | $124.15 | $185.00 | $50.00 | $183.50 | $139.00 |
| 0029 | Milling, transition (306-08043) | SYS | 887 | $20.84 | $13.00 | $14.90 | $16.00 | $26.25 |
| 0030 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 107 | $213.51 | $365.00 | $164.00 | $164.00 | $407.00 |
| 0031 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 57 | $192.72 | $415.00 | $181.00 | $181.00 | $377.00 |
| 0032 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 245 | $130.99 | $303.00 | $111.00 | $111.00 | $210.00 |
| 0033 | Joint adhesive (401-11526) | LFT | 739 | $0.92 | $1.78 | $1.00 | $1.00 | $0.85 |
| 0034 | Asphalt for tack coat (406-05521) | SYS | 2,097 | $0.01 | $0.13 | $1.30 | $1.30 | $0.25 |
| 0035 | Terminal joint, type HMA (503-12477) | LFT | 94 | $456.47 | $550.00 | $350.00 | $550.00 | $521.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 248 | $6.00 | $14.00 | $6.00 | $14.00 | $6.00 |
| 0037 | Railing ornamental , remove and reset (601-03667) | LFT | 149 | $42.00 | $170.00 | $145.00 | $175.00 | $42.00 |
| 0038 | Curved terminal end (601-05999) | EACH | 1 | $130.00 | $225.00 | $130.00 | $225.00 | $130.00 |
| 0039 | Impact attenuator, CR1- W1, TL-2 (601-09146) | EACH | 3 | $31,725 | $27,866 | $31,725 | $26,000 | $31,725 |
| 0040 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 88 | $25.00 | $30.00 | $25.00 | $30.00 | $25.00 |
| 0041 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,250.00 | $3,300.00 | $3,250.00 | $3,300.00 | $3,250.00 |
| 0042 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 1 | $1,400.00 | $1,200.00 | $1,400.00 | $1,200.00 | $1,400.00 |
| 0043 | Fence, chain link, reset (603-06065) | LFT | 53 | $34.00 | $90.00 | $34.00 | $90.00 | $34.00 |
| 0044 | Pavers , remove and reset (604-04740) | SFT | 3,281 | $22.40 | $26.00 | $22.40 | $22.40 | $22.40 |
| 0045 | Sidewalk, concrete (604-06070) | SYS | 5 | $762.02 | $1,000.00 | $902.43 | $285.00 | $265.00 |
| 0046 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 1,184 | $155.97 | $175.00 | $112.50 | $204.00 | $198.00 |
| 0047 | Monument, type A (615-06500) | EACH | 2 | $910.00 | $1,155.00 | $910.00 | $1,155.00 | $910.00 |
| 0048 | Monument, type B (615-06505) | EACH | 2 | $910.00 | $1,475.00 | $910.00 | $1,475.00 | $910.00 |
| 0049 | Trash receptacle (618-97672) | EACH | 1 | $2,200.00 | $5,000.00 | $2,200.00 | $2,750.00 | $2,200.00 |
| 0050 | Clean steel bridge, partial, QP-2, bridge no. 2 (619-11050) | LS | 1 | $25,500 | $25,500 | $25,000 | $25,500 | $23,000 |
| 0051 | Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0052 | Coat steel bridge, partial, bridge no. 2 (619-51860) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $16,500 |
| 0053 | Clean drains (619-98427) | EACH | 4 | $524.59 | $1,200.00 | $4,500.00 | $2,000.00 | $480.00 |
| 0054 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $550.00 | $550.00 | $986.59 | $550.00 | $1,500.00 |
| 0055 | Mulched seeding, type U (621-06560) | SYS | 149 | $7.30 | $7.30 | $13.09 | $7.30 | $15.00 |
| 0056 | Field office, type E (628-12684) | MOS | 18 | $4,578.34 | $3,500.00 | $4,000.00 | $7,250.00 | $5,875.00 |
| 0057 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 5 | $1,901.62 | $2,200.00 | $3,125.00 | $2,000.00 | $2,028.00 |
| 0058 | Field drilled hole in concrete , modified (702-51863) | EACH | 68 | $51.71 | $25.00 | $18.50 | $65.75 | $19.00 |
| 0059 | Reinforcing bars, epoxy coated (703-06029) | LBS | 365,661 | $1.47 | $1.65 | $1.25 | $1.65 | $1.70 |
| 0060 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 821 | $60.78 | $41.00 | $45.00 | $54.50 | $26.00 |
| 0061 | Concrete, C, superstructure (704-51002) | CYS | 1,153 | $924.33 | $910.00 | $967.00 | $1,020.00 | $993.00 |
| 0062 | Concrete bridge railing transition, type TTX , modified (706-06372) | EACH | 8 | $4,798.91 | $13,000 | $6,785.79 | $7,450.00 | $9,000.00 |
| 0063 | Railing, concrete type TX (706-11607) | CYS | 28.20 | $3,797.50 | $2,700.00 | $2,500.00 | $1,500.00 | $4,000.00 |
| 0064 | Railing, concrete type TX , modified (706-11607) | CYS | 80.90 | $1,755.35 | $2,850.00 | $2,500.00 | $1,365.00 | $2,500.00 |
| 0065 | Concrete surface coating , bridge no. 1 (709-96826) | LS | 1 | $12,302 | $12,302 | $25,895 | $20,895 | $24,000 |
| 0066 | Concrete surface coating , bridge no. 2 (709-96826) | LS | 1 | $27,867 | $27,867 | $48,802 | $43,802 | $30,000 |
| 0067 | Patching concrete structures (710-09158) | SFT | 520 | $141.00 | $141.00 | $147.52 | $141.00 | $141.00 |
| 0068 | Jacking and supporting structural steel , bridge no. 1 (711-93035) | LS | 1 | $7,329.30 | $10,025 | $65,000 | $40,000 | $30,000 |
| 0069 | Jacking and supporting structural steel , bridge no. 2 (711-93035) | LS | 1 | $6,176.12 | $9,450.00 | $60,000 | $40,000 | $30,000 |
| 0070 | Stud shear connectors (711-96800) | EACH | 3,156 | $4.15 | $4.15 | $4.15 | $4.64 | $4.50 |
| 0071 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 94 | $19.32 | $22.00 | $7.00 | $28.75 | $12.80 |
| 0072 | Pipe, bridge deck drain system , bridge no. 1 (715-09938) | LS | 1 | $15,611 | $16,000 | $7,500.00 | $13,750 | $11,500 |
| 0073 | Pipe, roadway drain casting extension (715-10238) | EACH | 5 | $1,422.58 | $2,000.00 | $1,090.75 | $1,675.00 | $1,180.00 |
| 0074 | Geotextile for underdrains, type 2B (718-12308) | SYS | 84 | $15.29 | $13.00 | $15.00 | $10.00 | $18.40 |
| 0075 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $810.25 | $1,000.00 | $350.00 | $1,200.00 | $1,150.00 |
| 0076 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $810.25 | $1,250.00 | $350.00 | $2,100.00 | $1,150.00 |
| 0077 | Longitudinal grooving (722-12732) | SYS | 3,161 | $4.31 | $3.39 | $4.29 | $7.25 | $5.00 |
| 0078 | Bridge expansion joint, type PCF , modified (724-12773) | LFT | 40 | $410.00 | $650.00 | $605.00 | $335.00 | $581.00 |
| 0079 | Bearing assembly, elastomeric (726-92406) | EACH | 9 | $6,171.08 | $6,500.00 | $5,250.00 | $5,400.00 | $6,000.00 |
| 0080 | Bearing assembly, ptfe (726-95870) | EACH | 8 | $6,171.08 | $9,500.00 | $6,500.00 | $8,345.00 | $8,800.00 |
| 0081 | Road closure sign assembly (801-04308) | EACH | 31 | $264.00 | $265.00 | $265.00 | $265.00 | $265.00 |
| 0082 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 34,048 | $1.99 | $2.30 | $2.30 | $2.30 | $2.30 |
| 0083 | Detour route marker assembly (801-06625) | EACH | 36 | $153.00 | $98.00 | $98.00 | $98.00 | $98.00 |
| 0084 | Construction sign, type A (801-06640) | EACH | 57 | $209.00 | $145.00 | $145.00 | $145.00 | $145.00 |
| 0085 | Construction sign, type B (801-06645) | EACH | 65 | $104.00 | $98.00 | $98.00 | $98.00 | $98.00 |
| 0086 | Flashing arrow sign (801-06710) | DAY | 18 | $16.00 | $30.00 | $30.00 | $92.50 | $30.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $242,356 | $409,225 | $375,000 | $925,000 | $408,640 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 552 | $15.36 | $14.00 | $14.00 | $14.00 | $14.00 |
| 0089 | Barricade, type III-B (801-07119) | LFT | 48 | $15.36 | $14.00 | $14.00 | $14.00 | $14.00 |
| 0090 | Temporary traffic barrier, type 2 (801-08401) | LFT | 680 | $39.95 | $60.00 | $65.00 | $56.25 | $72.26 |
| 0091 | Portable changeable message sign (801-11642) | EACH | 20 | $3,231.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0092 | Temporary curb ramp (801-11990) | EACH | 3 | $1,156.29 | $6,500.00 | $2,786.92 | $2,675.00 | $5,500.00 |
| 0093 | Law enforcement officer (801-12324) | HRS | 300 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0094 | Temporary pedestrian channelizer (801-12862) | LFT | 616 | $32.11 | $16.56 | $16.56 | $20.00 | $40.00 |
| 0095 | Temporary pavement marking, removable, 10 in. (801-12956) | LFT | 16,600 | $5.09 | $3.60 | $3.60 | $3.60 | $3.60 |
| 0096 | Handhole, signal, adjust to grade (805-01843) | EACH | 1 | $700.00 | $700.00 | $750.00 | $700.00 | $700.00 |
| 0097 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 1,272 | $40.00 | $40.00 | $35.00 | $40.00 | $40.00 |
| 0098 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 730 | $1.00 | $1.00 | $2.00 | $1.00 | $1.00 |
| 0099 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 46 | $2.00 | $2.00 | $2.35 | $2.00 | $2.00 |
| 0100 | Signal detector housing (805-78785) | EACH | 2 | $2,000.00 | $2,000.00 | $2,200.00 | $2,000.00 | $2,000.00 |
| 0101 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 277 | $11.00 | $11.00 | $12.00 | $11.00 | $11.00 |
| 0102 | Conduit, steel, galvanized, 3 in. (805-90267) | LFT | 424 | $53.00 | $53.00 | $55.00 | $53.00 | $53.00 |
| 0103 | Light structure, remove and reset (807-02370) | EACH | 6 | $1,550.00 | $1,550.00 | $2,500.00 | $1,550.00 | $1,550.00 |
| 0104 | Wire, no. 8 copper, 1/C (807-95888) | LFT | 331 | $5.00 | $5.00 | $5.85 | $5.00 | $5.00 |
| 0105 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 670 | $0.71 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0106 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 313 | $0.97 | $1.10 | $1.10 | $1.10 | $1.10 |
| 0107 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 24 | $11.43 | $19.95 | $19.95 | $19.95 | $19.95 |
| 0108 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 996 | $0.97 | $1.10 | $1.10 | $1.10 | $1.10 |
| 0109 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 249 | $0.97 | $2.95 | $2.95 | $2.95 | $2.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.