INDOT contract R-41159-A bid tabulation
CONCRETE PAVEMENT RESTORATION, BRIDGE MAINTENANCE AND REPAIR. Let by Indiana DOT on April 15, 2026, Marion, Greenfield. 4 bids received; low bid $12,454,097 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 15 APR 2026
- Pay items
- 87
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $12,454,097 | Low |
| 2 | Milestone Contractors LP | $14,877,000 | +19% |
| 3 | E & B Paving LLC | $16,734,000 | +34% |
| 4 | Superior Construction Co Inc | $17,669,132 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. E & B Paving LLC | 4. Superior Construction Co Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $23,200 | $79,568 | $200,000 | $75,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $2,067,285 | $746,000 | $1,690,000 | $879,000 |
| 0008 | Casting, remove (202-02772) | EACH | 2 | $372.01 | $959.60 | $500.00 | $350.00 |
| 0009 | Debris removal , bridge seats (202-12542) | EACH | 36 | $462.40 | $200.00 | $600.00 | $100.00 |
| 0010 | Present structure, remove portions, structure no. 01 (202-51328) | LS | 1 | $8,086.22 | $4,000.00 | $20,000 | $3,600.00 |
| 0011 | Present structure, remove portions, structure no. 11 (202-51328) | LS | 1 | $27,597 | $25,000 | $100,000 | $20,900 |
| 0012 | Present structure, remove portions, structure no. 21 (202-51328) | LS | 1 | $32,456 | $15,000 | $25,000 | $10,000 |
| 0013 | Flowable backfill, non- removable (213-09269) | CYS | 309 | $351.20 | $376.02 | $275.00 | $180.00 |
| 0014 | Lean concrete base, 9 in. (309-12695) | SYS | 2,962 | $74.72 | $105.00 | $85.00 | $122.00 |
| 0015 | Retrofitted tie bars (503-03489) | EACH | 24 | $43.22 | $49.00 | $5.00 | $132.00 |
| 0016 | D-1 contraction joint (503-05240) | LFT | 163 | $35.59 | $55.00 | $12.00 | $26.00 |
| 0017 | PCCP patching, full depth (506-06333) | SYS | 2,961 | $329.30 | $305.00 | $354.00 | $550.00 |
| 0018 | PCCP patching, partial depth (506-06334) | SYS | 15 | $1,634.26 | $1,456.00 | $1,580.00 | $1,200.00 |
| 0019 | Profiling PCCP (507-07480) | SYS | 2,976 | $38.67 | $14.70 | $10.00 | $19.00 |
| 0020 | Joints in PCCP, filled (507-08271) | LFT | 10,000 | $1.79 | $1.84 | $1.30 | $1.59 |
| 0021 | Joint repair, partial depth (509-12191) | SFT | 18,496 | $48.87 | $79.00 | $118.00 | $62.50 |
| 0022 | Joint repair, bottom-half (509-12192) | SFT | 175 | $162.56 | $355.00 | $118.00 | $320.00 |
| 0023 | Inspection hole (616-93772) | EACH | 4 | $3,023.55 | $1,799.06 | $75.00 | $7,540.00 |
| 0024 | Clean steel bridge, partial, QP-2, bridge no. 09 (619-11050) | LS | 1 | $75,000 | $77,250 | $75,000 | $75,000 |
| 0025 | Disposal of cleaning waste, hazardous, bridge no. 09 (619-12459) | LS | 1 | $2,000.00 | $2,060.00 | $2,000.00 | $2,000.00 |
| 0026 | Coat steel bridge, partial, bridge no. 09 (619-51860) | LS | 1 | $10,000 | $10,300 | $10,000 | $10,000 |
| 0027 | Field office, type E (628-12684) | MOS | 11 | $4,100.00 | $5,000.00 | $6,500.00 | $8,600.00 |
| 0028 | Field drilled hole in concrete (702-51863) | EACH | 8 | $150.35 | $50.00 | $1,000.00 | $100.00 |
| 0029 | Reinforcing bars, epoxy coated (703-06029) | LBS | 22 | $143.07 | $10.00 | $75.00 | $40.00 |
| 0030 | Railing, concrete type FT , modified (706-11601) | CYS | 0.20 | $32,153 | $25,000 | $30,000 | $10,000 |
| 0031 | Fiber wrap concrete casing system , bridge no. 09 (709-04647) | LS | 1 | $35,000 | $21,345 | $20,700 | $35,000 |
| 0032 | Fiber wrap concrete casing system , bridge no. 11 (709-04647) | LS | 1 | $26,000 | $24,720 | $24,000 | $26,000 |
| 0033 | Fiber wrap concrete casing system , bridge no. 18 (709-04647) | LS | 1 | $39,000 | $37,461 | $36,370 | $39,000 |
| 0034 | Patching concrete structures (710-09158) | SFT | 936 | $140.00 | $300.00 | $171.00 | $140.00 |
| 0035 | Bolt (711-01373) | EACH | 582 | $477.49 | $491.81 | $500.00 | $500.00 |
| 0036 | Retrofit , rocker bearing (711-01772) | EACH | 24 | $3,204.76 | $3,266.73 | $3,600.00 | $5,000.00 |
| 0037 | Structural steel, field cut (711-04297) | SQIN | 1,312 | $65.47 | $67.43 | $70.00 | $75.00 |
| 0038 | Repair , clean and coat existing bearing assembly (711-05728) | EACH | 349 | $1,715.98 | $1,021.98 | $1,000.00 | $1,000.00 |
| 0039 | Repair , field cut grinding (711-05728) | EACH | 40 | $1,782.50 | $1,835.98 | $1,800.00 | $1,800.00 |
| 0040 | Repair , pack rust and sealant (711-05728) | EACH | 42 | $5,907.57 | $3,114.76 | $1,800.00 | $1,100.00 |
| 0041 | Repair , steel core (711-05728) | EACH | 3 | $3,916.67 | $4,034.17 | $4,000.00 | $4,000.00 |
| 0042 | Repair , steel girder (711-05728) | EACH | 10 | $26,964 | $25,000 | $12,000 | $4,500.00 |
| 0043 | Repair , weld grinding (711-05728) | EACH | 49 | $3,302.04 | $3,401.10 | $3,350.00 | $3,300.00 |
| 0044 | Structural steel , bridge no. 01 (711-51038) | LS | 1 | $21,467 | $14,597 | $20,000 | $13,500 |
| 0045 | Structural steel , bridge no. 11 (711-51038) | LS | 1 | $130,001 | $124,894 | $150,000 | $110,000 |
| 0046 | Structural steel , bridge no. 21 (711-51038) | LS | 1 | $20,229 | $13,070 | $20,000 | $15,000 |
| 0047 | Field welding (711-95290) | LFT | 16 | $706.25 | $727.44 | $710.00 | $725.00 |
| 0048 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 140 | $210.35 | $50.00 | $20.00 | $15.00 |
| 0049 | Pipe, type 4, circular, diameter 8 in. (715-05049) | LFT | 350 | $232.64 | $61.41 | $20.00 | $20.00 |
| 0050 | Pipe, bridge deck drain system , bridge no. 07 (715-09938) | LS | 1 | $18,448 | $30,000 | $20,000 | $24,000 |
| 0051 | Pipe, bridge deck drain system , bridge no. 09 (715-09938) | LS | 1 | $14,747 | $25,000 | $20,000 | $8,000.00 |
| 0052 | Pipe, bridge deck drain system , bridge no. 10 (715-09938) | LS | 1 | $41,886 | $60,000 | $50,000 | $24,000 |
| 0053 | Pipe, bridge deck drain system , bridge no. 11 (715-09938) | LS | 1 | $304,608 | $950,000 | $400,000 | $185,000 |
| 0054 | Pipe, bridge deck drain system , bridge no. 12 (715-09938) | LS | 1 | $70,942 | $180,000 | $75,000 | $40,000 |
| 0055 | Pipe, bridge deck drain system , bridge no. 21 (715-09938) | LS | 1 | $109,339 | $300,000 | $150,000 | $75,000 |
| 0056 | Casting, type 7, furnish and adjust to grade (720-44040) | EACH | 2 | $1,981.51 | $2,106.92 | $3,500.00 | $800.00 |
| 0057 | Catch basin, clean existing (720-99315) | EACH | 2 | $1,470.11 | $2,500.00 | $2,000.00 | $1,250.00 |
| 0058 | Bridge deck patching, full depth (722-51401) | SFT | 95 | $931.20 | $749.50 | $300.00 | $212.00 |
| 0059 | Bridge deck patching, partial depth (722-51852) | SFT | 493 | $268.65 | $146.98 | $300.00 | $125.00 |
| 0060 | Bearing assembly, shim existing (726-12766) | EACH | 400 | $1,553.83 | $4,242.37 | $5,500.00 | $4,300.00 |
| 0061 | Road closure sign assembly (801-04308) | EACH | 21 | $225.00 | $231.75 | $225.00 | $225.00 |
| 0062 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 320,850 | $2.25 | $2.32 | $2.15 | $2.25 |
| 0063 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 210,367 | $2.99 | $3.08 | $2.70 | $2.99 |
| 0064 | Detour route marker assembly (801-06625) | EACH | 239 | $89.00 | $91.67 | $89.00 | $89.00 |
| 0065 | Construction sign, type A (801-06640) | EACH | 317 | $175.00 | $180.25 | $175.00 | $175.00 |
| 0066 | Construction sign, type B (801-06645) | EACH | 49 | $98.00 | $100.94 | $98.00 | $98.00 |
| 0067 | Temporary raised pavement marker, grade 2 (801-06650) | EACH | 1,543 | $6.95 | $7.16 | $6.95 | $6.95 |
| 0068 | Flashing arrow sign (801-06710) | DAY | 50 | $25.00 | $25.75 | $25.00 | $25.00 |
| 0069 | Maintaining traffic (801-06775) | LS | 1 | $1,017,581 | $1,674,536 | $1,535,408 | $5,219,349 |
| 0070 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $6,250.00 | $12,952 | $10,000 | $8,000.00 |
| 0071 | Barricade, type III-A (801-07118) | LFT | 708 | $14.00 | $14.42 | $14.00 | $14.00 |
| 0072 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,000 | $12.43 | $40.00 | $40.00 | $90.00 |
| 0073 | Temporary traffic barrier, type 4 (801-08403) | LFT | 12,500 | $85.37 | $141.50 | $200.00 | $165.00 |
| 0074 | Portable changeable message sign (801-11642) | EACH | 20 | $6,500.00 | $6,695.00 | $5,500.00 | $6,500.00 |
| 0075 | Truck mounted attenuator (801-12042) | DAY | 50 | $2,319.20 | $3,256.00 | $5,500.00 | $3,000.00 |
| 0076 | Law enforcement officer (801-12324) | HRS | 1,000 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0077 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 9 | $695.00 | $715.85 | $695.00 | $695.00 |
| 0078 | Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038) | LFT | 190 | $9.95 | $10.25 | $9.95 | $9.95 |
| 0079 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,225 | $1.25 | $1.29 | $1.25 | $1.25 |
| 0080 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,220 | $1.25 | $1.29 | $1.25 | $1.25 |
| 0081 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 3,425 | $1.45 | $1.49 | $1.45 | $1.45 |
| 0082 | Grooving for pavement markings (808-12032) | LFT | 6,590 | $0.88 | $0.91 | $0.88 | $0.88 |
| 0083 | Line, multi-component, dotted, white, 6 in. (808-12353) | LFT | 360 | $4.95 | $5.10 | $4.95 | $4.95 |
| 0084 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 360 | $9.95 | $10.25 | $9.95 | $9.95 |
| 0085 | Snowplowable raised pavement marker (808-75998) | EACH | 500 | $69.00 | $71.07 | $69.00 | $69.00 |
| 0086 | Pipe, type 4, circular, diameter 10 in. (715-05051) | LFT | 45 | $358.56 | $100.00 | $20.00 | $30.00 |
| 0087 | Pipe, roadway drain casting extension (715-10238) | EACH | 3 | $1,681.02 | $1,900.00 | $1,500.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 15, 2026. Compiled by Mirage Metrics.