INDOT contract B-46167-A bid tabulation

BRIDGE DECK OVERLAY. Let by Indiana DOT on February 11, 2026, Lake, LaPorte. 3 bids received; low bid $5,497,573 by Superior Construction Co Inc.

Owner
Indiana DOT
Letting
11 FEB 2026
Pay items
113
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Construction Co Inc$5,497,573Low
2Rieth-Riley Construction Co., Inc.$6,422,560+17%
3Dunnet Bay Construction Company$6,759,996+23%
INDOT contract B-46167-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Construction Co Inc2. Rieth-Riley Construction Co., Inc.3. Dunnet Bay Construction Company
0001Construction engineering (105-06845)LS1$200,000$111,500$180,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00
0005Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$275,000$320,000$340,525
0012Clearing right-of-way (201-52370)LS1$50,000$5,000.00$67,600
0013Pavement removal (202-02240)SYS7,155$35.00$30.00$45.00
0014Curb and gutter, remove (202-02279)LFT105$6.00$23.00$12.00
0015Bridge railing, remove (202-62420)LFT499$30.00$76.00$30.00
0016Barrier wall, concrete, remove (202-94954)LFT434$45.00$164.00$60.00
0017Excavation, common (203-02000)CYS2,020$20.00$50.00$45.00
0018Stormwater management budget (205-12108)DOL13,000$1.00$1.00$1.00
0019Stormwater management implementation (205-12616)LS1$15,000$6,500.00$20,000
0020Subgrade treatment, type IC (207-09935)SYS7,367$30.00$59.00$35.00
0021Geotextile for pavement, type 2B (214-12239)SYS7,367$4.00$5.00$3.00
0022Compacted aggregate, no. 53 (301-12234)CYS36$100.00$92.00$90.00
0023Subbase for PCCP (302-06464)CYS1,696$65.00$116.00$100.00
0024Compacted aggregate, no. 53 (303-01180)TON125$48.00$118.00$150.00
0025Milling, transition (306-08043)SYS530$5.00$10.00$9.40
0026QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON62$183.00$183.00$183.00
0027QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON30$286.50$286.50$286.50
0028QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON129$114.00$114.00$114.00
0029Joint adhesive (401-11526)LFT810$2.15$2.15$2.15
0030Asphalt for tack coat (406-05521)SYS952$1.75$30.00$1.75
0031Cracks in asphalt pavement, fill (408-12028)TON1$1,500.00$1,500.00$1,500.00
0032PCCP, 12 in. (502-06329)SYS2,693$130.00$157.00$190.00
0033Retrofitted tie bars (503-03489)EACH463$42.00$41.00$60.00
0034D-1 contraction joint (503-05240)LFT1,890$20.00$43.00$16.00
0035Jointed reinforced concrete pavement, 12 in. (503-12476)SYS2,356$150.00$204.00$250.00
0036Terminal joint, type HMA (503-12477)LFT64$400.00$434.00$520.00
0037Terminal joint, type PCCP (503-12478)LFT548$300.00$327.00$310.00
0038Expansion joint with load transfer (503-12479)LFT530$32.00$66.00$20.00
0039Guardrail, remove (601-02241)LFT200$5.00$19.00$19.00
0040Impact attenuator, reset, CR-W1, TL-3 (601-06289)EACH1$6,670.00$4,885.00$4,885.00
0041Guardrail transition, MGS with curb (601-12291)EACH1$3,450.00$4,000.00$4,000.00
0042Guardrail transition, MGS without curb (601-12292)EACH1$3,316.00$3,500.00$3,500.00
0043Guardrail end treatment, type OS (601-94689)EACH2$3,316.00$2,550.00$2,550.00
0044Concrete barrier (602-01064)LFT170$250.00$290.00$185.00
0045Concrete barrier , modified (602-01064)LFT209$250.00$372.00$150.00
0046Barrier delineator (602-06729)EACH192$19.61$32.00$19.61
0047Concrete barrier, modified section (602-11938)CYS14.40$700.00$1,394.00$625.00
0048Curb, integral concrete (605-06090)LFT20$105.00$103.00$200.00
0049Curb and gutter, concrete (605-06140)LFT105$42.00$74.00$75.00
0050Milled PCCP corrugations, conventional (606-11064)LFT99$10.00$125.00$120.00
0051Reinforced concrete bridge approach, 12 in. (609-06259)SYS2,036$160.00$155.00$175.00
0052Mobilization and demobilization for seeding (621-01004)EACH4$500.00$500.00$600.00
0053Mulched seeding, type U (621-06560)SYS437$5.00$5.00$7.58
0054Computer system equipment (628-11976)EACH5$100.00$250.00$200.00
0055Field office, type D (628-12683)MOS12$2,000.00$3,200.00$3,300.00
0056Field drilled hole in concrete (702-51863)EACH76$35.00$29.00$35.00
0057Reinforcing bars, epoxy coated (703-06029)LBS132,602$1.50$2.00$2.00
0058Railing, concrete type FT , modified (706-09959)LFT62$200.00$292.00$160.00
0059Railing, concrete type FC (706-09960)LFT64$155.00$325.00$160.00
0060Railing, concrete type FC , modified (706-11600)CYS25.70$1,600.00$1,800.00$1,380.00
0061Railing, concrete type FT , modified (706-11601)CYS12.10$1,000.00$1,800.00$980.00
0062Concrete bridge railing transition, type TFC (706-11620)EACH2$3,500.00$4,100.00$6,000.00
0063Fiber wrap concrete casing system (709-04647)LS1$10,000$10,000$9,828.00
0064Surface seal , bridge no. 1 (709-51821)LS1$3,980.00$3,530.00$3,980.00
0065Surface seal , bridge no. 2 (709-51821)LS1$3,580.00$3,300.00$3,580.00
0066Surface seal , bridge no. 3 (709-51821)LS1$2,200.00$1.00$2,200.00
0067Surface seal , bridge no. 4 (709-51821)LS1$6,100.00$7,500.00$6,100.00
0068Surface seal , bridge no. 5 (709-51821)LS1$4,860.00$3,800.00$4,860.00
0069Surface seal , bridge no. 6 (709-51821)LS1$3,835.00$3,400.00$3,835.00
0070Patching concrete structures (710-09158)SFT104$160.00$175.00$208.00
0071Pipe, type 4, circular, diameter 6 in. (715-05048)LFT2,011$5.00$20.00$28.00
0072Pipe, roadway drain casting extension (715-10238)EACH1$1,000.00$700.00$1,000.00
0073Underdrain outlet cleaning (718-09979)EACH17$100.00$1,500.00$180.00
0074Geotextile for underdrains, type 1A (718-12305)SYS1,648$1.50$4.00$1.90
0075Aggregate for underdrains (718-52610)CYS194$25.00$110.00$110.00
0076Casting, inlet, adjust to grade (720-12797)EACH11$500.00$1,500.00$700.00
0077Hydrodemolition (722-01066)SYS7,507$55.00$55.00$60.00
0078Bridge deck overlay budget (722-12380)DOL227,151$1.00$1.00$1.00
0079Bridge deck, remove concrete surface (722-12464)SYS12,371$8.00$5.00$8.50
0080Longitudinal grooving (722-12732)SYS14,348$3.50$3.50$5.00
0081Bridge deck patching, full depth (722-51401)SFT888$10.00$1.00$1.00
0082Bridge deck overlay, latex modified (722-51842)SYS12,371$50.00$82.00$75.00
0083Bridge deck patching, partial depth (722-51852)SFT3,284$1.00$20.00$99.00
0084Overlay dam (722-51874)SFT367$250.00$85.00$60.00
0085Bridge expansion joint, type SS, replace (724-12774)LFT70$1,500.00$925.00$1,000.00
0086Bridge expansion joint, type M, replace (724-12775)LFT35$4,500.00$3,900.00$4,300.00
0087Construction sign, type C (801-03290)EACH6$263.00$263.00$263.00
0088Road closure sign assembly (801-04308)EACH11$248.00$248.00$248.00
0089Detour route marker assembly, multiple routes (801-06196)EACH34$153.00$153.00$153.00
0090Temporary pavement marking, removable, 6 in. (801-06209)LFT38,169$1.89$1.89$1.89
0091Temporary pavement message marking, removable, lane indication arrow (801-06211)EACH1$219.00$219.00$219.00
0092Detour route marker assembly (801-06625)EACH87$151.00$151.00$151.00
0093Construction sign, type A (801-06640)EACH80$189.00$189.00$189.00
0094Construction sign, type B (801-06645)EACH8$116.00$116.00$116.00
0095Flashing arrow sign (801-06710)DAY90$15.00$15.00$15.00
0096Maintaining traffic (801-06775)LS1$346,890$40,000$100,000
0097Energy absorbing terminal, CZ, TL-3 (801-07024)EACH4$10,000$6,600.00$11,050
0098Barricade, type III-A (801-07118)LFT168$15.04$15.04$15.04
0099Barricade, type III-B (801-07119)LFT144$15.04$15.04$15.04
0100Temporary traffic barrier, type 2 (801-08401)LFT3,706$15.00$27.00$30.00
0101Portable changeable message sign (801-11642)EACH4$4,211.00$4,211.00$4,211.00
0102Truck mounted attenuator (801-12042)DAY3$324.00$2,500.00$324.00
0103Line, remove (808-06716)LFT13,576$0.51$0.51$0.51
0104Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038)LFT810$12.87$15.00$12.87
0105Line, multi-component, solid, white, 6 in. (808-10049)LFT5,558$0.91$2.50$0.91
0106Line, multi-component, solid, yellow, 6 in. (808-10057)LFT4,022$0.91$2.50$0.91
0107Line, multi-component, broken, white, 6 in. (808-10071)LFT350$2.02$2.50$2.02
0108Grooving for pavement markings (808-12032)LFT3,647$0.81$3.00$0.81
0109Line, paint, solid, white, 6 in. (808-75007)LFT1,086$1.01$2.00$1.01
0110Line, paint, solid, yellow, 6 in. (808-75047)LFT1,086$1.01$2.00$1.01
0111Transverse marking, preformed plastic, crosshatch line, white, 24 in. (808-75510)LFT38$24.88$50.00$24.88
0112Snowplowable raised pavement marker, remove (808-75996)EACH16$0.01$18.00$40.00
0113Snowplowable raised pavement marker (808-75998)EACH16$91.55$100.00$91.55
INDOT contract B-46167-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy