INDOT contract B-44426-A bid tabulation

BRIDGE MAINTENANCE AND REPAIR. Let by Indiana DOT on February 11, 2026, Clinton, Crawfordsville. 9 bids received; low bid $610,868 by Laporte Construction Company Inc.

Owner
Indiana DOT
Letting
11 FEB 2026
Pay items
61
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Laporte Construction Company Inc$610,868Low
2Rieth-Riley Construction Co., Inc.$614,589+1.0%
3E & B Paving LLC$660,000+8.0%
4Icc Group Inc$669,000+10%
5His Constructors Inc$679,380+11%
6Superior Construction Co Inc$731,798+20%
7Pontem Contractors Inc$749,000+23%
8Milestone Contractors LP$754,540+24%
9Beaty Construction Inc$767,497+26%
INDOT contract B-44426-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Laporte Construction Company Inc2. Rieth-Riley Construction Co., Inc.3. E & B Paving LLC4. Icc Group Inc5. His Constructors Inc6. Superior Construction Co Inc
0001Construction engineering (105-06845)LS1$9,488.08$9,700.00$10,000$12,000$20,000$10,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$30,000$50,000$33,500$32,881$33,969$37,000
0010Clearing right-of-way (201-52370)LS1$6,000.00$27,600$5,000.00$6,690.00$6,793.80$7,000.00
0011Present structure, remove portions, structure no. 1 (202-51328)LS1$123,717$24,000$98,000$125,000$75,989$135,958
0012Excavation, common (203-02000)CYS250$49.08$86.00$120.00$100.00$100.00$105.00
0013Borrow (203-02070)CYS585$55.35$65.00$15.00$55.00$50.00$0.01
0014Stormwater management budget (205-12108)DOL11,929$1.00$1.00$1.00$1.00$1.00$1.00
0015Stormwater management implementation (205-12616)LS1$13,210$1,725.00$15,000$9,400.00$15,000$7,000.00
0016Subgrade treatment, type IC (207-09935)SYS672$47.36$45.00$40.00$60.00$60.00$20.00
0017Geotextile for pavement, type 2B (214-12239)SYS672$6.17$3.00$5.00$5.00$20.00$4.00
0018Compacted aggregate, no. 53 (301-12234)CYS60$91.81$130.00$150.00$100.00$110.00$108.00
0019Compacted aggregate, no. 53 (303-01180)TON225$65.56$71.00$40.00$50.00$50.00$40.00
0020Milling, asphalt, 1 1/2 in. (306-08034)SYS255$9.12$14.00$3.50$15.00$20.00$3.65
0021Milling, transition (306-08043)SYS672$9.03$14.00$3.50$6.00$20.00$3.65
0022QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON133$153.00$168.00$153.00$153.00$153.00$168.00
0023QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON150$118.00$140.00$118.00$118.00$118.00$140.00
0024QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON228$141.00$113.00$141.00$141.00$141.00$113.00
0025Joint adhesive (401-11526)LFT1,200$0.60$1.00$0.60$0.60$0.60$1.00
0026Void reducing asphalt membrane for HMA (401-12439)LFT1,335$6.20$10.40$6.20$6.20$6.20$11.50
0027Asphalt for tack coat (406-05521)SYS2,558$0.23$0.01$0.23$0.23$0.23$0.01
0028D-1 contraction joint (503-05240)LFT51$26.10$142.00$50.00$20.00$55.00$60.00
0029Guardrail, remove (601-02241)LFT270$1.00$1.00$1.00$1.00$1.00$1.00
0030Guardrail, reset (601-06035)LFT60$17.00$17.00$17.00$17.00$17.00$17.00
0031Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT113$22.00$22.00$22.00$22.00$22.00$22.00
0032Guardrail height transition, MGS (601-12289)EACH1$950.00$950.00$950.00$950.00$950.00$950.00
0033Guardrail transition, MGS without curb (601-12292)EACH4$3,069.00$3,069.00$3,069.00$3,069.00$3,069.00$3,069.00
0034Guardrail end treatment, type OS (601-94689)EACH3$2,900.00$2,900.00$2,900.00$2,900.00$2,900.00$2,900.00
0035Barrier delineator (602-06729)EACH4$15.00$100.00$15.00$24.00$50.00$14.59
0036Right-of-way marker (615-06490)EACH8$150.00$150.00$150.00$150.00$150.00$150.00
0037Monument, type B (615-06505)EACH4$850.00$850.00$850.00$850.00$850.00$850.00
0038Monument, type C (615-06510)EACH1$900.00$900.00$900.00$900.00$900.00$900.00
0039Riprap, revetment (616-06405)TON9$261.23$454.00$250.00$200.00$105.00$180.00
0040Geotextile for riprap, type 1A (616-12246)SYS12$59.64$46.00$40.00$45.00$75.00$56.00
0041Mobilization and demobilization for seeding (621-01004)EACH1$400.00$800.00$800.00$800.00$800.00$800.00
0042Mulched seeding, type R (621-06559)SYS1,452$2.42$2.00$2.00$2.00$2.00$2.00
0043Sodding (621-06574)SYS4$268.00$150.00$150.00$150.00$150.00$150.00
0044Computer system equipment (628-11976)EACH1$700.00$450.00$400.00$700.00$700.00$500.00
0045Field office, type D (628-12683)MOS10$2,000.00$8,800.00$3,500.00$4,250.00$2,750.00$2,800.00
0046Concrete, C, substructure (702-92857)CYS6.70$2,580.77$1,807.00$7,500.00$2,000.00$3,250.00$3,000.00
0047Reinforcing bars, epoxy coated (703-06029)LBS5,111$1.64$2.43$3.00$2.50$3.75$1.85
0048Railing, concrete type FC (706-09960)LFT70$174.90$228.00$225.00$250.00$325.00$175.00
0049Concrete bridge railing transition, type TFC , modified (706-11620)EACH4$2,583.30$1,250.00$2,800.00$6,000.00$4,500.00$38,850
0050Reinforced concrete moment slab, 10 in. (706-12272)SYS126$264.66$364.00$350.00$400.00$425.00$225.00
0051Surface seal (709-51821)LS1$3,120.00$3,120.00$1.00$3,120.00$3,000.00$3,120.00
0052Patching concrete structures (710-09158)SFT334$186.00$78.00$186.00$140.00$186.00$140.00
0053Road closure sign assembly (801-04308)EACH6$290.00$290.00$290.00$252.00$252.00$290.00
0054Detour route marker assembly (801-06625)EACH31$120.00$120.00$120.00$156.00$156.00$120.00
0055Construction sign, type A (801-06640)EACH10$175.00$175.00$175.00$209.00$209.00$175.00
0056Construction sign, type B (801-06645)EACH8$90.00$90.00$90.00$104.00$104.00$90.00
0057Maintaining traffic (801-06775)LS1$8,155.57$9,000.00$30,400$2,640.00$10,000$20,000
0058Barricade, type III-A (801-07118)LFT48$16.00$16.00$16.00$15.87$15.87$16.00
0059Barricade, type III-B (801-07119)LFT40$16.00$16.00$16.00$15.87$15.87$16.00
0060Line, thermoplastic, solid, white, 6 in. (808-75043)LFT890$1.00$1.00$1.00$1.08$1.08$1.00
0061Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT890$1.00$1.00$1.00$1.08$1.08$1.00
INDOT contract B-44426-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy