Laporte Construction Company Inc: INDOT bid record

Laporte Construction Company Inc submitted 63 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 18 of them (29%). When it was not low, its total sat a median +15% above the low bid.

Owner
Indiana DOT
Low bid volume
$22,893,720
Latest bid
05 NOV 2026
Data through
05 NOV 2026
63Bids
18Low bids
29Win rate, percent
+15%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
20228225%
202310550%
202422941%
2025900%
202614214%
Laporte Construction Company Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
LaPorte481327%
Fort Wayne9222%
Crawfordsville5240%
Greenfield11100%
Laporte Construction Company Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL6161 (100%)$1.00$1.00
Contract liens109-08360DOL6161 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL6161 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL5555 (100%)$1.00$1.00
Stormwater management budget205-12108DOL5252 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL5151 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL4949 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL4040 (100%)$1.00$1.00
Mobilization and demobilization for seeding621-01004EACH5139 (76%)$400.00$525.00
Detour route marker assembly801-06625EACH5233 (63%)$140.00$140.00
Road closure sign assembly801-04308EACH5130 (59%)$300.00$280.00
Guardrail, remove601-02241LFT3929 (74%)$5.00$5.60
Laporte Construction Company Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Laporte Construction Company Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026R-45664-ALaPorteSMALL STRUCTURE REPLACEMENT3 of 3$1,066,725+61%
07 OCT 2026R-44658-ALaPorteSMALL STRUCTURE REPLACEMENT2 of 6$898,5730.0%
07 OCT 2026B-43353-ALaPorteBRIDGE DECK OVERLAY2 of 6$938,962+2.0%
02 SEP 2026B-44107-ALaPorteBRIDGE REPLACEMENT3 of 6$1,510,800+7.0%
02 SEP 2026B-44108-ALaPorteBRIDGE REPLACEMENT6 of 7$1,890,909+14%
08 APR 2026B-46377-ALaPorteIDIQ DISTRICT WIDE BRIDGE MAINTENANCE2 of 4$774,236+6.0%
11 MAR 2026B-43900-ALaPorteBRIDGE THIN DECK OVERLAY1 of 3$2,281,068Low, 3.0% under the second
11 MAR 2026B-44666-ALaPorteBRIDGE DECK OVERLAY5 of 6$565,006+29%
11 MAR 2026B-44670-ALaPorteBRIDGE DECK OVERLAY3 of 4$406,313+5.0%
11 FEB 2026B-42775-AFort WayneBRIDGE REPLACEMENT3 of 6$1,658,208+19%
11 FEB 2026B-44426-ACrawfordsvilleBRIDGE MAINTENANCE AND REPAIR1 of 9$610,868Low, 1.0% under the second
14 JAN 2026B-43618-AFort WayneBRIDGE REPLACEMENT2 of 3$1,243,748+21%
14 JAN 2026B-44098-ALaPorteREPLACE SUPERSTRUCTURE4 of 6$1,388,568+24%
14 JAN 2026B-45899-ALaPorteBRIDGE REPLACEMENT4 of 4$4,895,998+118%
10 DEC 2025B-43906-ALaPorteBRIDGE DECK OVERLAY AND BRIDGE THIN DECK OVERLAY4 of 4$1,599,253+69%
08 OCT 2025B-43899-ALaPorteBRIDGE DECK OVERLAY AND SUPERSTRUCTURE REPAIR2 of 5$2,559,246+2.0%
10 SEP 2025B-41435-ALaPorteBRIDGE REPLACEMENT6 of 8$1,434,721+7.0%
10 SEP 2025B-43799-AFort WayneBRIDGE DECK OVERLAY6 of 6$1,409,503+43%
06 AUG 2025B-43795-AFort WayneBRIDGE DECK OVERLAY3 of 3$1,754,025+15%
09 JUL 2025B-42823-ALaPorteREPLACE SUPERSTRUCTURE2 of 6$1,735,282+14%
09 JUL 2025B-43926-ALaPorteBRIDGE DECK OVERLAY3 of 3$1,524,534+22%
12 MAR 2025B-42837-ALaPorteSUPERSTRUCTURE REPLACEMENT3 of 4$1,388,845+19%
12 FEB 2025B-43363-ALaPorteREPLACE SUPERSTRUCTURE4 of 4$1,201,500+54%
11 DEC 2024B-42827-ALaPorteBRIDGE REPLACEMENT1 of 4$1,268,900Low, 20% under the second
14 NOV 2024B-42769-AFort WayneBRIDGE REPLACEMENT2 of 3$2,650,976+15%
Laporte Construction Company Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy