INDOT contract B-43799-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on September 10, 2025, Miami, Wabash, Fort Wayne. 6 bids received; low bid $987,375 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 79
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $987,375 | Low |
| 2 | E & B Paving LLC | $1,136,360 | +15% |
| 3 | Rieth-Riley Construction Co., Inc. | $1,314,493 | +33% |
| 4 | Pioneer Associates Inc | $1,350,799 | +37% |
| 5 | Beaty Construction Inc | $1,391,873 | +41% |
| 6 | Laporte Construction Company Inc | $1,409,503 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. E & B Paving LLC | 3. Rieth-Riley Construction Co., Inc. | 4. Pioneer Associates Inc | 5. Beaty Construction Inc | 6. Laporte Construction Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $20,000 | $20,000 | $15,000 | $17,360 | $5,202.40 | $8,901.40 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $49,000 | $55,000 | $65,500 | $67,500 | $248,978 | $68,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $10,000 | $11,000 | $13,000 | $28,500 | $12,380 | $12,000 |
| 0012 | Pavement removal (202-02240) | SYS | 240 | $70.00 | $40.00 | $50.00 | $60.00 | $34.92 | $47.75 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $100,000 | $120,000 | $82,000 | $85,250 | $54,466 | $200,000 |
| 0014 | Bridge railing, remove (202-62420) | LFT | 80 | $30.00 | $50.00 | $105.00 | $110.00 | $73.67 | $80.54 |
| 0015 | Excavation, common (203-02000) | CYS | 125 | $65.00 | $120.00 | $60.00 | $130.00 | $62.40 | $60.18 |
| 0016 | Stormwater management budget (205-12108) | DOL | 1,800 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $2,500.00 | $15,000 | $7,500.00 | $8,600.00 | $7,523.17 | $12,950 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 540 | $50.00 | $60.00 | $55.00 | $65.00 | $50.78 | $55.73 |
| 0019 | Aggregate for end bent backfill (211-06467) | CYS | 40 | $150.00 | $100.00 | $150.00 | $190.00 | $117.37 | $95.50 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 540 | $6.00 | $10.00 | $7.00 | $7.00 | $6.26 | $5.20 |
| 0021 | Compacted aggregate, no. 53 (301-12234) | CYS | 48 | $110.00 | $120.00 | $145.00 | $120.00 | $87.22 | $108.70 |
| 0022 | Subbase for PCCP (302-06464) | CYS | 60 | $190.00 | $120.00 | $85.00 | $230.00 | $182.76 | $91.10 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 131 | $55.00 | $60.00 | $60.00 | $75.00 | $54.54 | $58.19 |
| 0024 | Milling, transition (306-08043) | SYS | 725 | $6.00 | $11.25 | $8.00 | $5.00 | $9.00 | $4.40 |
| 0025 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 85 | $160.00 | $225.00 | $185.00 | $160.00 | $160.00 | $185.00 |
| 0026 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 45 | $157.00 | $210.00 | $230.00 | $157.00 | $157.00 | $230.00 |
| 0027 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 180 | $133.00 | $140.00 | $155.00 | $133.00 | $133.00 | $155.00 |
| 0028 | Joint adhesive (401-11526) | LFT | 810 | $0.55 | $0.50 | $0.50 | $0.55 | $0.55 | $0.05 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 1,015 | $0.45 | $0.25 | $0.75 | $0.45 | $0.45 | $0.75 |
| 0030 | Terminal joint, type HMA (503-12477) | LFT | 87 | $400.00 | $250.00 | $450.00 | $500.00 | $351.96 | $318.64 |
| 0031 | Joints in PCCP, filled (507-08271) | LFT | 72 | $18.00 | $5.00 | $15.00 | $40.00 | $5.00 | $5.00 |
| 0032 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $2,670.00 | $2,670.00 | $2,670.00 | $2,670.00 | $2,670.00 | $3,343.00 |
| 0033 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $2,660.00 | $2,660.00 | $2,660.00 | $2,660.00 | $2,660.00 | $3,254.00 |
| 0034 | Guardrail, remove (601-02241) | LFT | 340 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $5.00 |
| 0035 | Hand dig guardrail post holes (601-09238) | EACH | 2 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $208.00 |
| 0036 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,125.00 | $3,125.00 | $3,125.00 | $3,125.00 | $3,125.00 | $3,345.00 |
| 0037 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,475.00 | $3,475.00 | $3,475.00 | $4,300.00 | $3,475.00 | $3,478.00 |
| 0038 | Barrier delineator (602-06729) | EACH | 8 | $30.00 | $40.00 | $25.00 | $35.00 | $31.30 | $25.00 |
| 0039 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 249 | $175.00 | $175.00 | $185.00 | $235.00 | $178.73 | $156.06 |
| 0040 | HMA for approaches, type B (610-07487) | TON | 2 | $195.00 | $500.00 | $185.00 | $195.00 | $195.00 | $800.00 |
| 0041 | Field office, type C (628-09403) | MOS | 8 | $3,300.00 | $2,500.00 | $3,350.00 | $3,700.00 | $3,941.92 | $3,500.00 |
| 0042 | Field drilled hole in concrete (702-51863) | EACH | 80 | $45.00 | $50.00 | $58.00 | $50.00 | $77.38 | $35.96 |
| 0043 | Reinforcing bars, epoxy coated (703-06029) | LBS | 24,807 | $2.50 | $1.20 | $2.50 | $2.00 | $1.45 | $1.40 |
| 0044 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 48 | $50.00 | $40.00 | $62.00 | $60.00 | $44.72 | $41.56 |
| 0045 | Concrete, C, superstructure (704-51002) | CYS | 35.80 | $2,000.00 | $1,200.00 | $2,250.00 | $2,500.00 | $2,686.01 | $1,350.00 |
| 0046 | Railing, concrete type FC (706-09960) | LFT | 30.50 | $150.00 | $76.00 | $275.00 | $350.00 | $382.15 | $200.00 |
| 0047 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $3,300.00 | $3,200.00 | $3,850.00 | $3,900.00 | $4,037.89 | $2,808.06 |
| 0048 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $15,900 | $15,900 | $15,900 | $20,000 | $15,900 | $15,900 |
| 0049 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $5,000.00 | $10,000 | $6,512.00 | $6,500.00 | $3,400.00 | $6,512.00 |
| 0050 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $2,000.00 | $10,000 | $2,980.00 | $3,000.00 | $7,300.00 | $2,980.00 |
| 0051 | Patching concrete structures (710-09158) | SFT | 58 | $17.03 | $200.00 | $31.33 | $17.00 | $17.03 | $17.03 |
| 0052 | Jacking and supporting superstructure , bridge no. 1 (711-90114) | LS | 1 | $25,000 | $50,000 | $62,500 | $50,500 | $73,709 | $172,084 |
| 0053 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 100 | $15.00 | $30.00 | $25.00 | $25.00 | $20.05 | $18.38 |
| 0054 | Geotextile for underdrains, type 2B (718-12308) | SYS | 51 | $20.00 | $10.00 | $13.00 | $12.00 | $44.35 | $20.07 |
| 0055 | Bridge deck overlay, rigid (722-000134) | SYS | 1,243 | $60.00 | $75.00 | $155.00 | $160.00 | $68.25 | $149.07 |
| 0056 | Hydrodemolition (722-01066) | SYS | 1,243 | $50.00 | $75.00 | $68.00 | $85.00 | $62.26 | $77.12 |
| 0057 | Bridge deck overlay budget (722-12380) | DOL | 20,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0058 | Bridge deck, remove concrete surface (722-12464) | SYS | 1,243 | $5.00 | $10.00 | $12.00 | $9.00 | $18.74 | $6.60 |
| 0059 | Longitudinal grooving (722-12732) | SYS | 1,485 | $3.50 | $6.00 | $12.00 | $5.00 | $4.26 | $9.48 |
| 0060 | Bridge deck patching, full depth (722-51401) | SFT | 1,120 | $9.50 | $30.00 | $40.00 | $25.00 | $111.98 | $57.00 |
| 0061 | Bearing assembly, elastomeric (726-92406) | EACH | 24 | $900.00 | $1,600.00 | $1,250.00 | $1,500.00 | $621.03 | $746.95 |
| 0062 | Warranted polymer overlay, bridge deck (738-12855) | SYS | 777 | $45.15 | $45.15 | $55.00 | $50.00 | $50.03 | $45.15 |
| 0063 | Polymer overlay, other concrete surface (738-12856) | SYS | 187 | $24.00 | $24.00 | $35.00 | $25.00 | $32.33 | $24.00 |
| 0064 | Road closure sign assembly (801-04308) | EACH | 20 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 |
| 0065 | Detour route marker assembly (801-06625) | EACH | 66 | $130.00 | $130.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 0066 | Construction sign, type A (801-06640) | EACH | 42 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 0067 | Construction sign, type B (801-06645) | EACH | 21 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0068 | Maintaining traffic (801-06775) | LS | 1 | $10,000 | $38,420 | $46,000 | $29,750 | $50,260 | $16,416 |
| 0069 | Barricade, type III-A (801-07118) | LFT | 184 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0070 | Barricade, type III-B (801-07119) | LFT | 284 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0071 | Portable changeable message sign (801-11642) | EACH | 2 | $5,213.00 | $5,213.00 | $5,213.00 | $5,200.00 | $5,213.00 | $5,213.00 |
| 0072 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $330.00 | $330.00 | $330.00 | $330.00 | $330.00 | $208.00 |
| 0073 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,033 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0074 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,033 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0076 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 464 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0077 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 25 | $50.00 | $5.00 | $35.00 | $24.00 | $28.67 | $50.00 |
| 0078 | Snowplowable raised pavement marker (808-75998) | EACH | 13 | $75.00 | $75.00 | $75.00 | $250.00 | $75.00 | $75.00 |
| 0079 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 464 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0080 | Railroad flagging budget (107-12976) | DOL | 24,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.