INDOT contract B-43926-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on July 9, 2025, Jasper, LaPorte. 3 bids received; low bid $1,250,984 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 100
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $1,250,984 | Low |
| 2 | Milestone Contractors LP | $1,259,527 | +1.0% |
| 3 | Laporte Construction Company Inc | $1,524,534 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. Laporte Construction Company Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $26,000 | $25,000 | $45,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $62,500 | $62,000 | $75,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $2,000.00 | $10,000 | $15,000 |
| 0012 | Pavement removal (202-02240) | SYS | 189 | $150.00 | $100.00 | $113.18 |
| 0013 | Excavation, common (203-02000) | CYS | 179 | $100.00 | $220.00 | $149.51 |
| 0014 | Stormwater management budget (205-12108) | DOL | 4,060 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $5,000.00 | $40,000 |
| 0016 | Subgrade treatment, type II (207-08264) | SYS | 262 | $55.00 | $59.00 | $37.82 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 278 | $95.00 | $110.00 | $104.53 |
| 0018 | Structure backfill, type 5 (211-09268) | CYS | 54 | $325.00 | $200.00 | $588.08 |
| 0019 | Geotextile for pavement, type 1B (214-12237) | SYS | 262 | $5.00 | $4.65 | $8.13 |
| 0020 | Geotextile for pavement, type 2A (214-12238) | SYS | 102 | $15.00 | $12.00 | $15.32 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 278 | $10.00 | $12.00 | $7.87 |
| 0022 | Compacted aggregate, no. 8 (301-12233) | CYS | 44 | $160.00 | $200.00 | $117.93 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 44 | $110.00 | $170.00 | $107.93 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 39 | $140.00 | $220.00 | $223.04 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 239 | $90.00 | $70.00 | $131.37 |
| 0026 | Compacted aggregate, no. 73 (303-07449) | TON | 12 | $175.00 | $200.00 | $136.39 |
| 0027 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 634 | $20.00 | $20.00 | $6.53 |
| 0028 | Milling, transition (306-08043) | SYS | 780 | $15.00 | $12.00 | $9.87 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 31 | $344.00 | $625.00 | $344.00 |
| 0030 | QC/QA-HMA, 4, 58S, surface, 9.5 MM (401-000003) | TON | 86 | $178.00 | $300.00 | $178.00 |
| 0031 | QC/QA-HMA, 4, 58S, intermediate, 19.0 MM (401-000039) | TON | 58 | $197.00 | $300.00 | $197.00 |
| 0032 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 116 | $135.00 | $200.00 | $135.00 |
| 0033 | Joint adhesive, surface (401-10258) | LFT | 840 | $3.50 | $1.00 | $3.50 |
| 0034 | Joint adhesive, intermediate (401-10259) | LFT | 200 | $14.00 | $1.00 | $14.00 |
| 0035 | Inertial profiler, HMA (401-12169) | LS | 1 | $400.00 | $750.00 | $1,100.00 |
| 0036 | Asphalt for tack coat (406-05521) | SYS | 1,678 | $1.50 | $1.00 | $1.50 |
| 0037 | Terminal joint, type HMA (503-12477) | LFT | 80 | $510.00 | $500.00 | $531.47 |
| 0038 | Joints in PCCP, saw and seal (507-08272) | LFT | 80 | $5.00 | $10.00 | $40.00 |
| 0039 | Guardrail, remove (601-02241) | LFT | 123 | $3.00 | $3.00 | $4.00 |
| 0040 | Guardrail, reset (601-06035) | LFT | 39 | $19.00 | $19.00 | $83.00 |
| 0041 | Guardrail transition, MGS with curb (601-12291) | EACH | 3 | $3,575.00 | $3,575.00 | $3,700.00 |
| 0042 | Barrier delineator (602-06729) | EACH | 8 | $35.00 | $25.00 | $25.00 |
| 0043 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 135 | $100.00 | $80.00 | $156.67 |
| 0044 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 189 | $250.00 | $350.00 | $310.83 |
| 0045 | Right-of-way marker (615-06490) | EACH | 4 | $170.00 | $170.00 | $150.00 |
| 0046 | Monument, type B (615-06505) | EACH | 2 | $1,125.00 | $1,125.00 | $950.00 |
| 0047 | Riprap, revetment (616-06405) | TON | 257 | $210.00 | $225.00 | $150.00 |
| 0048 | Geotextile for riprap, type 1A (616-12246) | SYS | 355 | $2.00 | $2.00 | $5.35 |
| 0049 | Riprap, grouted, 18 in. (616-93019) | SYS | 14 | $500.00 | $600.00 | $693.55 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $550.00 | $550.00 | $550.00 |
| 0051 | Seeding wetland (621-02356) | LBS | 5 | $1,450.00 | $1,450.00 | $1,450.00 |
| 0052 | Mulched seeding, type R (621-06559) | SYS | 692 | $5.75 | $0.01 | $5.75 |
| 0053 | Water (621-06567) | KGAL | 1 | $25.00 | $25.00 | $25.00 |
| 0054 | Sodding (621-06574) | SYS | 41 | $55.00 | $55.00 | $55.00 |
| 0055 | Seed mixture, floodplain (621-12612) | LBS | 7 | $585.00 | $585.00 | $585.00 |
| 0056 | Field office, type D (628-12683) | MOS | 12 | $2,500.00 | $2,500.00 | $3,000.00 |
| 0057 | Reinforcing bars, epoxy coated (703-06029) | LBS | 11,351 | $2.00 | $2.00 | $1.45 |
| 0058 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 84 | $40.00 | $60.00 | $39.69 |
| 0059 | Inertial profiler, bridge encounter (704-000080) | LS | 1 | $9,600.00 | $9,600.00 | $1,100.00 |
| 0060 | Corrective grinding, bridge encounter (704-000082) | LS | 1 | $50,000 | $35,000 | $1,100.00 |
| 0061 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 3 | $6,500.00 | $6,000.00 | $3,300.00 |
| 0062 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $4,200.00 | $4,200.00 | $5,200.00 |
| 0063 | Patching concrete structures (710-09158) | SFT | 188 | $165.00 | $175.00 | $175.00 |
| 0064 | Structure, reinforced concrete, box sections, 5 FT X 3 FT (714-11198) | LFT | 38 | $4,100.00 | $2,600.00 | $6,000.00 |
| 0065 | HMA for structure installation, type B (715-08305) | TON | 35 | $284.00 | $625.00 | $284.00 |
| 0066 | Hydrodemolition (722-01066) | SYS | 324 | $225.00 | $275.00 | $283.24 |
| 0067 | Bridge deck overlay budget (722-12380) | DOL | 7,000 | $1.00 | $1.00 | $1.00 |
| 0068 | Bridge deck, remove concrete surface (722-12464) | SYS | 324 | $25.00 | $25.00 | $38.96 |
| 0069 | Longitudinal grooving (722-12732) | SYS | 504 | $25.00 | $20.00 | $23.34 |
| 0070 | Bridge deck patching, full depth (722-51401) | SFT | 260 | $175.00 | $20.00 | $65.00 |
| 0071 | Bridge deck overlay, latex modified (722-51842) | SYS | 324 | $325.00 | $370.00 | $394.57 |
| 0072 | Overlay dam (722-51874) | SFT | 79 | $100.00 | $150.00 | $196.11 |
| 0073 | Epoxy injection, crack preparation (727-90308) | LFT | 37 | $90.00 | $109.00 | $109.00 |
| 0074 | Epoxy injection, epoxy material (727-90309) | GAL | 4 | $150.00 | $58.00 | $58.00 |
| 0075 | Epoxy injection, furnishing equipment , bridge no. 1 (727-93560) | LS | 1 | $2,200.00 | $965.00 | $965.00 |
| 0076 | Road closure sign assembly (801-04308) | EACH | 7 | $200.00 | $200.00 | $277.00 |
| 0077 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,674 | $1.60 | $1.60 | $2.07 |
| 0078 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 22 | $10.00 | $10.00 | $12.56 |
| 0079 | Detour route marker assembly (801-06625) | EACH | 22 | $115.00 | $115.00 | $173.00 |
| 0080 | Construction sign, type A (801-06640) | EACH | 28 | $145.00 | $145.00 | $211.00 |
| 0081 | Construction sign, type B (801-06645) | EACH | 2 | $100.00 | $100.00 | $104.00 |
| 0082 | Maintaining traffic (801-06775) | LS | 1 | $25,000 | $40,000 | $18,219 |
| 0083 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $7,500.00 | $7,200.00 | $25,000 |
| 0084 | Barricade, type III-A (801-07118) | LFT | 64 | $10.00 | $10.00 | $15.45 |
| 0085 | Barricade, type III-B (801-07119) | LFT | 120 | $10.00 | $10.00 | $15.45 |
| 0086 | Temporary traffic barrier, type 2 (801-08401) | LFT | 172 | $100.00 | $135.00 | $200.00 |
| 0087 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 78 | $110.00 | $145.00 | $200.00 |
| 0088 | Portable signal (801-12081) | LS | 1 | $15,000 | $15,000 | $95,000 |
| 0089 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $555.55 | $555.55 | $904.00 |
| 0090 | Temporary buzz strips (801-97643) | LFT | 88 | $16.55 | $16.55 | $20.65 |
| 0091 | Reference post (802-04893) | EACH | 4 | $325.00 | $325.00 | $436.00 |
| 0092 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 63 | $28.00 | $28.00 | $41.00 |
| 0093 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 28 | $28.00 | $28.00 | $45.00 |
| 0094 | Line, remove (808-06716) | LFT | 876 | $0.55 | $0.55 | $2.44 |
| 0095 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 961 | $1.55 | $1.55 | $3.11 |
| 0096 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 120 | $1.55 | $1.55 | $3.11 |
| 0097 | Grooving for pavement markings (808-12032) | LFT | 1,292 | $1.00 | $1.00 | $1.36 |
| 0098 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 211 | $1.55 | $1.55 | $4.22 |
| 0099 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 3 | $100.00 | $100.00 | $40.00 |
| 0100 | Snowplowable raised pavement marker (808-75998) | EACH | 3 | $150.00 | $150.00 | $177.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.