INDOT contract B-44107-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on September 2, 2026, Porter, LaPorte. 6 bids received; low bid $1,408,332 by Ellas Construction Company Inc.
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 88
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ellas Construction Company Inc | $1,408,332 | Low |
| 2 | Dunnet Bay Construction Company | $1,483,109 | +5.0% |
| 3 | Laporte Construction Company Inc | $1,510,800 | +7.0% |
| 4 | F H Paschen S N Nielsen & Associates LLC | $1,560,821 | +11% |
| 5 | Rieth-Riley Construction Co., Inc. | $1,576,774 | +12% |
| 6 | Milestone Contractors LP | $1,611,100 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ellas Construction Company Inc | 2. Dunnet Bay Construction Company | 3. Laporte Construction Company Inc | 4. F H Paschen S N Nielsen & Associates LLC | 5. Rieth-Riley Construction Co., Inc. | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $85,000 | $25,313 | $100,000 | $30,000 | $16,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $70,000 | $70,000 | $75,000 | $78,000 | $79,000 | $80,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $28,000 | $32,444 | $15,000 | $30,000 | $21,000 | $20,200 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $218,150 | $85,000 | $123,721 | $100,000 | $98,000 | $97,668 |
| 0012 | Sign, remove (202-74035) | EACH | 6 | $106.00 | $106.00 | $106.00 | $106.00 | $106.00 | $106.00 |
| 0013 | Excavation, common (203-02000) | CYS | 925 | $60.00 | $45.00 | $62.72 | $63.29 | $67.00 | $60.00 |
| 0014 | Borrow (203-02070) | CYS | 525 | $48.00 | $55.00 | $82.21 | $56.16 | $1.00 | $80.00 |
| 0015 | Excavation, waterway (203-51223) | CYS | 120 | $64.00 | $90.00 | $51.10 | $42.20 | $70.00 | $70.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $3,000.00 | $5,000.00 | $20,531 | $5,000.00 | $20,000 | $10,000 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 140 | $70.00 | $95.00 | $51.11 | $44.33 | $50.00 | $85.00 |
| 0019 | Cofferdam (206-51235) | LS | 1 | $1,000.00 | $20,000 | $20,000 | $9,000.00 | $35,000 | $17,000 |
| 0020 | Subgrade treatment, type II (207-08264) | SYS | 119 | $29.00 | $45.00 | $28.34 | $45.99 | $50.00 | $45.00 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 1,875 | $50.00 | $55.00 | $52.27 | $41.53 | $55.00 | $53.00 |
| 0022 | B borrow (211-02050) | CYS | 100 | $61.00 | $95.00 | $105.84 | $92.13 | $50.00 | $100.00 |
| 0023 | Aggregate for end bent backfill (211-06467) | CYS | 40 | $113.00 | $185.00 | $105.84 | $125.78 | $167.00 | $275.00 |
| 0024 | Structure backfill, type 1 (211-09264) | CYS | 26 | $79.00 | $500.00 | $105.84 | $353.54 | $308.00 | $80.00 |
| 0025 | Geogrid, type IB (214-11796) | SYS | 479 | $4.45 | $1.50 | $6.84 | $4.39 | $2.50 | $3.00 |
| 0026 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,480 | $5.00 | $4.00 | $7.48 | $5.11 | $4.20 | $4.50 |
| 0027 | Compacted aggregate, no. 5 (301-12232) | CYS | 484 | $85.00 | $65.00 | $158.38 | $107.08 | $108.00 | $110.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 16 | $113.00 | $200.00 | $143.28 | $164.44 | $180.00 | $220.00 |
| 0029 | Subbase for PCCP (302-06464) | CYS | 49 | $94.00 | $130.00 | $133.65 | $254.46 | $125.00 | $315.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 92 | $50.00 | $90.00 | $80.44 | $81.02 | $70.00 | $85.00 |
| 0031 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 113 | $22.00 | $46.00 | $60.97 | $16.64 | $65.00 | $25.00 |
| 0032 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 159 | $172.00 | $172.00 | $172.00 | $172.00 | $176.00 | $172.00 |
| 0033 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 400 | $123.75 | $123.75 | $123.75 | $123.75 | $116.85 | $123.75 |
| 0034 | Joint adhesive (401-11526) | LFT | 593 | $1.00 | $1.00 | $1.00 | $1.00 | $6.50 | $1.00 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 1 | $3,574.00 | $3,574.00 | $3,574.00 | $3,574.00 | $2,290.00 | $3,574.00 |
| 0036 | Guardrail transition, type TGB (601-01522) | EACH | 3 | $3,247.00 | $3,247.00 | $3,247.00 | $3,247.00 | $3,247.00 | $3,247.00 |
| 0037 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 3 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0038 | Guardrail, remove (601-02241) | LFT | 68 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0039 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 12.50 | $42.00 | $42.00 | $42.00 | $42.00 | $42.00 | $42.00 |
| 0040 | Guardrail transition, MGS with curb (601-12291) | EACH | 1 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 |
| 0041 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0042 | Barrier delineator (602-06729) | EACH | 5 | $20.14 | $20.14 | $25.00 | $33.75 | $35.00 | $20.14 |
| 0043 | Curb, integral concrete, type B (605-06095) | LFT | 60 | $75.00 | $60.00 | $131.75 | $49.19 | $95.00 | $160.00 |
| 0044 | Curb, concrete, type B (605-06121) | LFT | 58 | $75.00 | $95.00 | $131.72 | $83.14 | $120.00 | $95.00 |
| 0045 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 193 | $177.00 | $155.00 | $150.00 | $189.82 | $225.00 | $240.00 |
| 0046 | HMA for approaches, type B (610-07487) | TON | 33 | $165.00 | $165.00 | $165.00 | $165.00 | $276.00 | $165.00 |
| 0047 | Monument, type B (615-06505) | EACH | 2 | $996.00 | $996.00 | $996.00 | $996.00 | $996.00 | $996.00 |
| 0048 | Riprap, revetment (616-06405) | TON | 445 | $90.00 | $130.00 | $96.32 | $104.77 | $130.00 | $175.00 |
| 0049 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,392 | $3.50 | $3.00 | $6.97 | $2.56 | $2.25 | $1.50 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $475.00 | $475.00 | $475.00 | $475.00 | $450.00 | $675.00 |
| 0051 | Mulched seeding, type R (621-06559) | SYS | 57 | $9.85 | $9.85 | $9.85 | $9.85 | $8.00 | $95.00 |
| 0052 | Water (621-06567) | KGAL | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $100.00 | $100.00 |
| 0053 | Sodding (621-06574) | SYS | 16 | $140.00 | $140.00 | $160.00 | $140.00 | $16.00 | $230.00 |
| 0054 | Field office, type C (628-09403) | MOS | 6 | $3,400.00 | $2,600.00 | $4,972.71 | $3,200.00 | $3,000.00 | $2,500.00 |
| 0055 | Computer system equipment (628-11976) | EACH | 2 | $300.00 | $400.00 | $540.00 | $1,080.70 | $580.00 | $660.00 |
| 0056 | Dynamic pile load test (701-06011) | EACH | 2 | $3,750.00 | $15,000 | $6,214.57 | $5,721.93 | $12,500 | $10,000 |
| 0057 | Test pile, dynamic, production (701-09557) | LFT | 88 | $145.00 | $175.00 | $150.00 | $191.04 | $146.00 | $80.00 |
| 0058 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $6,800.00 | $6,000.00 | $4,527.78 | $5,246.07 | $9,000.00 | $7,000.00 |
| 0059 | Pile shoe, HP 14 X 73 (701-09770) | EACH | 12 | $135.00 | $165.00 | $300.00 | $144.45 | $400.00 | $175.00 |
| 0060 | Pile, steel H, HP, 14 X 73 (701-93575) | LFT | 440 | $145.00 | $115.00 | $150.00 | $246.50 | $110.00 | $142.00 |
| 0061 | Concrete, C, substructure (702-92857) | CYS | 26.40 | $1,500.00 | $1,469.50 | $2,233.52 | $1,532.89 | $1,500.00 | $2,575.00 |
| 0062 | Reinforcing bars, epoxy coated (703-06029) | LBS | 42,188 | $1.74 | $1.70 | $1.92 | $1.61 | $2.00 | $2.15 |
| 0063 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 34 | $36.00 | $70.00 | $52.76 | $68.32 | $75.00 | $40.00 |
| 0064 | Concrete, C, superstructure (704-51002) | CYS | 84.60 | $1,400.00 | $2,100.00 | $1,300.00 | $2,128.98 | $1,750.00 | $2,025.00 |
| 0065 | Railing, concrete type FC (706-11600) | CYS | 7.70 | $1,500.00 | $1,600.00 | $1,500.00 | $1,708.61 | $1,287.00 | $2,100.00 |
| 0066 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $3,250.00 | $4,000.00 | $2,663.20 | $2,599.09 | $2,500.00 | $4,900.00 |
| 0067 | Structural member, concrete, box beam, 27 in. X 36 in. (707-11517) | LFT | 248 | $575.00 | $495.00 | $660.00 | $461.07 | $893.00 | $700.00 |
| 0068 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $1,500.00 | $345.00 | $1,000.00 | $1.00 | $1.00 |
| 0069 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 319 | $57.00 | $80.00 | $85.56 | $75.92 | $99.00 | $75.00 |
| 0070 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 60 | $65.00 | $90.00 | $90.73 | $71.44 | $87.00 | $85.00 |
| 0071 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 140 | $16.00 | $16.00 | $25.31 | $38.38 | $7.41 | $22.00 |
| 0072 | Video inspection for pipe (715-09064) | LFT | 379 | $1.00 | $11.00 | $1.25 | $10.60 | $20.00 | $10.60 |
| 0073 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $505.00 | $1,300.00 | $1,221.75 | $792.89 | $2,700.00 | $1,700.00 |
| 0074 | Inlet, type E7 (720-45030) | EACH | 2 | $3,700.00 | $4,600.00 | $2,734.54 | $3,484.27 | $5,800.00 | $4,500.00 |
| 0075 | Automatic drainage gate, diameter 12 in. (721-43000) | EACH | 2 | $1,600.00 | $1,800.00 | $2,623.26 | $3,338.63 | $10,437 | $9,000.00 |
| 0076 | Longitudinal grooving (722-12732) | SYS | 406 | $15.50 | $13.50 | $19.02 | $9.62 | $10.00 | $8.62 |
| 0077 | Road closure sign assembly (801-04308) | EACH | 5 | $221.00 | $175.00 | $221.00 | $221.00 | $221.00 | $221.00 |
| 0078 | Detour route marker assembly (801-06625) | EACH | 18 | $133.00 | $120.00 | $133.00 | $133.00 | $133.00 | $133.00 |
| 0079 | Construction sign, type A (801-06640) | EACH | 18 | $177.00 | $145.00 | $177.00 | $177.00 | $177.00 | $177.00 |
| 0080 | Construction sign, type B (801-06645) | EACH | 6 | $101.00 | $125.00 | $101.00 | $101.00 | $101.00 | $101.00 |
| 0081 | Maintaining traffic (801-06775) | LS | 1 | $10,000 | $15,000 | $7,686.00 | $49,673 | $10,000 | $7,500.00 |
| 0082 | Barricade, type III-A (801-07118) | LFT | 48 | $15.02 | $14.00 | $15.02 | $15.02 | $15.02 | $15.02 |
| 0083 | Barricade, type III-B (801-07119) | LFT | 36 | $15.02 | $14.00 | $15.02 | $15.02 | $15.02 | $15.02 |
| 0084 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 50 | $41.00 | $41.00 | $41.00 | $41.00 | $41.00 | $41.00 |
| 0085 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 21 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0086 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 1,420 | $0.68 | $2.10 | $0.68 | $0.68 | $0.68 | $0.68 |
| 0087 | Line, multi-component, broken, yellow, 4 in. (808-10036) | LFT | 356 | $0.68 | $2.10 | $0.68 | $0.68 | $0.68 | $0.68 |
| 0088 | Grooving for pavement markings (808-12032) | LFT | 1,479 | $0.61 | $1.90 | $0.61 | $0.61 | $0.61 | $0.61 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.