Ellas Construction Company Inc: INDOT bid record
Ellas Construction Company Inc submitted 33 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 02 SEP 2026, and was the low bidder on 14 of them (42%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $15,305,863
- Latest bid
- 02 SEP 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 3 | 75% |
| 2023 | 9 | 4 | 44% |
| 2024 | 8 | 3 | 38% |
| 2025 | 4 | 1 | 25% |
| 2026 | 8 | 3 | 38% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 26 | 26 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 26 | 26 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Detour route marker assembly | 801-06625 | EACH | 26 | 20 (77%) | $148.00 | $140.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 25 | 19 (76%) | $500.00 | $525.00 |
| Road closure sign assembly | 801-04308 | EACH | 26 | 17 (65%) | $271.00 | $280.00 |
| Construction sign, type A | 801-06640 | EACH | 25 | 17 (68%) | $199.00 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rieth-Riley Construction Co., Inc. | 30 | 11 of 30 |
| Dunnet Bay Construction Company | 25 | 10 of 25 |
| Milestone Contractors LP | 21 | 3 of 21 |
| F H Paschen S N Nielsen & Associates LLC | 14 | 4 of 14 |
| Gariup Construction Co Inc | 11 | 0 of 11 |
| Superior Construction Co Inc | 10 | 6 of 10 |
| Laporte Construction Company Inc | 10 | 1 of 10 |
| Milestone Contractors North Inc | 4 | 2 of 4 |
| Icc Group Inc | 2 | 1 of 2 |
| Ram Construction SRVCS of Michigan Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 SEP 2026 | B-44107-A | LaPorte | BRIDGE REPLACEMENT | 1 of 6 | $1,408,332 | Low, 5.0% under the second |
| 02 SEP 2026 | B-44108-A | LaPorte | BRIDGE REPLACEMENT | 1 of 7 | $1,654,606 | Low, 2.0% under the second |
| 08 APR 2026 | B-44005-A | LaPorte | BRIDGE REPLACEMENT | 1 of 4 | $1,625,610 | Low, 9.0% under the second |
| 08 APR 2026 | B-45593-A | LaPorte | BRIDGE THIN DECK OVERLAY | 4 of 4 | $1,140,174 | +36% |
| 11 MAR 2026 | B-43873-A | LaPorte | BRIDGE DECK OVERLAY AND SMALL STRUCTURE REPLACEMENT | 2 of 4 | $2,578,210 | +8.0% |
| 11 MAR 2026 | B-44666-A | LaPorte | BRIDGE DECK OVERLAY | 3 of 6 | $539,520 | +23% |
| 11 FEB 2026 | B-43916-A | LaPorte | REPLACE SUPERSTRUCTURE | 4 of 7 | $2,230,674 | +29% |
| 14 JAN 2026 | B-44098-A | LaPorte | REPLACE SUPERSTRUCTURE | 5 of 6 | $1,699,500 | +51% |
| 08 OCT 2025 | B-43876-A | LaPorte | BRIDGE DECK OVERLAY, SMALL STRUCTURES AND DRAINS CONSTR | 3 of 5 | $1,210,435 | +7.0% |
| 12 MAR 2025 | B-43913-A | LaPorte | BRIDGE THIN DECK OVERLAY AND BRIDGE PAINTING | 4 of 4 | $2,599,628 | +10% |
| 12 FEB 2025 | B-43363-A | LaPorte | REPLACE SUPERSTRUCTURE | 1 of 4 | $782,372 | Low, 21% under the second |
| 12 FEB 2025 | B-44729-A | LaPorte | SUBSTRUCTURE REPAIR AND REHABILITATION | 3 of 4 | $830,205 | +63% |
| 11 DEC 2024 | B-42831-A | LaPorte | BRIDGE REPLACEMENT | 1 of 4 | $1,920,564 | Low, 1.0% under the second |
| 11 DEC 2024 | B-43360-A | LaPorte | BRIDGE THIN DECK OVERLAY | 2 of 5 | $160,857 | 0.0% |
| 09 OCT 2024 | B-42830-A | LaPorte | BRIDGE REPLACEMENT | 1 of 5 | $1,128,600 | Low, 6.0% under the second |
| 09 OCT 2024 | B-42833-A | LaPorte | BRIDGE REPLACEMENT | 1 of 5 | $1,130,591 | Low, 4.0% under the second |
| 09 OCT 2024 | B-43349-A | LaPorte | BRIDGE DECK OVERLAY | 3 of 6 | $1,742,305 | +10% |
| 09 OCT 2024 | B-44730-A | LaPorte | BRIDGE DECK OVERLAY AND BRIDGE THIN DECK OVERLAY | 3 of 5 | $286,801 | +6.0% |
| 14 AUG 2024 | B-44816-A | LaPorte | BRIDGE DECK OVERLAY | 4 of 6 | $3,000,257 | +11% |
| 10 JUL 2024 | B-43332-A | LaPorte | BRIDGE DECK OVERLAY | 4 of 6 | $2,292,568 | +12% |
| 15 NOV 2023 | B-43017-A | LaPorte | BRIDGE DECK OVERLAY | 1 of 6 | $623,995 | Low, 6.0% under the second |
| 15 NOV 2023 | B-43129-A | LaPorte | BRIDGE REPLACEMENT | 1 of 6 | $1,196,547 | Low, 7.0% under the second |
| 09 AUG 2023 | B-43020-A | LaPorte | BRIDGE DECK OVERLAY | 3 of 6 | $781,345 | +2.0% |
| 09 AUG 2023 | B-44805-A | LaPorte | BRIDGE REPLACEMENT | 3 of 6 | $1,559,807 | +11% |
| 12 JUL 2023 | B-42061-A | LaPorte | BRIDGE REPLACEMENT | 3 of 5 | $1,325,145 | +14% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.